Forwards Amend 109 to License DPR-40 & Safety Evaluation. Amend Modifies Tech Specs to Reflect Changes Necessary to Support Cycle 11 Operation.Revised Rept Should Be Submitted 180 Days Prior to Reaching 43,000 Mwd/Mtu in Any Assembly
ML20215M137
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 05/04/1987
From: Paulson W
Office of Nuclear Reactor Regulation
To: Andrews R
OMAHA PUBLIC POWER DISTRICT
Shared Package
ML20215M141 List:
References
TAC-64434, TAC-64486, NUDOCS 8705130098
Download: ML20215M137 (4)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

s O

May 4, 1987 Docket No. 50-285 DISTRIBUTION:

Docket File / L. Harmon NRC PDR E. Jordan Local PDR B. Grimes Mr. R. L. Andrews PD4 Reading J. Partlow Division Manager - Nuclear Production F. Schroeder T. Barnhart-4 Omaha Public Power District D. Crutchfield W. Jones 1623 Harney Street F. Miraglia E. Butcher Omaha, Nebraska 68102 P. Noonan ACRS (10)

W. Paulson OPA

Dear Mr. Andrews:

OGC-Bethesda LFM8 PD4 Plant File

SUBJECT:

FORT CALHOUN STATION, UNIT N0.1, AMENDMENT N0.109T0 FACILITY OPERATING LICENSE NO. DPR-40 (TAC NOS. 64434 AND 64486)

The Commission has issued the enclosed Amendment No.109 to Facility Operating License No. DPR-40 for the Fort Calhoun Station Unit No. 1. This amendment consistsofchangestotheTechnicalSpecificatIonsinresponsetoyour application dated January 22, 1987, as supplemented February 13 and 24, 1987.

The amendment modifies the Technical Specifications to reflect changes which are necessary to support Cycle 11 operation.

As discussed in Enclosure 2, there is one open issue as a result of our review of your application. Your February 24, 1987 letter indicated that it is anticipated that an end-of-cycle peak assembly burnu) of 44,500 MWD /MTU will be achieved for Batch K fuel; however, the extended aurnup analysis allows a peak assembly burnup of only 43,000 MWD /MTU. Your letter committed to submit a revised mechanical design report to the NRC for review and approval for Batches K and L fuel to envelop the future batch burnups arior to exceeding the mechanical design criteria. This re3 ort should be su)mitted to the NRC at least 180 days prior to reaching 43,000 ND/MTV in any assembly. This schedule has been discussed with and agreed to by your staff. Exceeding 43,000 MWD /MTU without properly revising the mechanical design report would result in non-conformance with the requirements of Commission regulations.

A copy of the Safety Evaluation is also enclosed. The notice of issuance will be included in the Commission's next regular bi-weekly Federal Register notice.

Sincerely, l Sl WalterA.Paulson,ProfVlect ProjectDirectorate- Manager Division of Reactor Pro;ects - III,  ?

IV, V and Special Pro;ects

Enclosures:

1. Amendment No.109 to DPR-40
2. Safety Evaluation cc w/ enclosures:

See next page

  • See Previous Concurrences:

PBD#8* PBD#8* OGC-Beth* PD4 /l I c PMKreutzer WPaulson;cf JACalvo 4/08/87 4/08/87 4/09/87 5/9 /87 0705130090 070504 PDR ADOCK 05000205 P PDR

I o-L Docket No. 50-285 DISTRIBUTION: ,NThompson Docket File /WRegan NRC PDR LFMB L PDR / OPA Mr. R. L. Andrews P80#8 Rdg / ACRS-10 Division Manager - Nuclear Production JPartlow '

FMiraglia Omaha Public Power District PMKreutzer-3 WJones 1623 Harney Street WPaulson T8arnhart-4 Omaha, Nebraska 68102 OGC-Bethesda' 8 Grimes LHarmon / EJordan

Dear Mr. Andrews:

Gray File.3.3a(4) EButcher The Commission has issued the enclosed Amendment No. to Facility Operating License No. DPR-40 for the Fort Calhoun Station, Unit No. 1. This amendment consists of changes to the Technical Specifications'in response to your application dated January 22, 1981, as supplemented February 13 and 24, 1987.

TheamendmentmodifiestheTechnicalSpecificatiobstoreflectchangeswhich are necessary to support Cycle 11 operation.

As discussed in Enclosure 2, there is one open issue as a result of our review of your application. Your February 24, 1987 letter indicated that it is anticipated that an end-of-cycle peak assembly burnup of 44,500 MWD /MTU will be achieved for Batch K fuel; however, the extended burnup analysis allows a peak assembly burnup of only 43,000 MWD /MTU. Your letter committed to submit a revised mechanical design report to the NRC for review and approval for Batches K and L fuel to envelop the future batch burnups prior to exceeding the mechanical design criteria. This report should be submitted to the NRC at least 180 days prior to reaching 43,000 MWD /MTU in any assembly. This schedule has been discussed with and agreed to by your staff.

A copy of the Safety Evaluation is also enclosed. The notice of issuance will be included in the Commission's next regular bi weekly Federal Register notice.

Sincerely, Walter A. Paulson, Project Manager PWR Project Directorate #8 Division of PWR Licensing-8

Enclosures:

1. Amendment No. to DPR-40
2. Safety Evaluation cc w/ enclosures:

See next page P868 PDD#6 P t#dtzer W/aulson;cf /N A

  1. g OCC-Bet PBD#8 AThadari 4/ /87 4/f/87 4/y/87 4/ /87

\p()  !

, s '

o ,

May 4,1987

Enclosures:

1. Amendment No.109 to DPR-40
2. Safety Evaluation cc w/ enclosures:

See next page

Mr. R. L. Andrews Fort Calhoun Station Omaha Public Power District Unit No. 1 cc: .

Harry H. Voigt Esq.

LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, NW Washington, D.C. 20036 Mr. Jack Jensen, Chairman Washington County Board of Supervisors Blair, Nebraska 68008 -

Mr. Phillip Harrell, Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 309 Fort Calhoun, Nebraska 68023 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations C-E Power Systems 7910 Woodmont Avenue Bethesda, Maryland 20814 Regional Administrator, Region IV l

U.S. Nuclear Regulatory Commission 1 Office of Executive Director i for Operations 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 i

Harold Borchert, Director Division of Radiological Health Department of Health 301 Centennial Mall, South

, P.O. Box 95007 Lincoln, Nebraska 68509 l

e I

i