DUKE POWER GOMPANY P.O. DOX 33180 CHARLOTTI:, N.O. 28242 HAL H.1UCKER ret.rriso.wm (704) 0N831
]"*,'","*
May 1, 1987 U. S. Nuclear Regulatory Commission Attention: Doctament Control Desk Washington, D. C. 20555
Subject:
RII ALC Catawba Nuclear Station Docket Nos. 50-413 and 50-414 Violation 413/87-03-01, 414/87-03-01 Dear Sirs Please find attached our response to the subject Violation, which was transmitted by the Region II Office on April 2, 1987.
Very truly yours,
/
/
r Hal B. Tucker 1/IP/44/sbn Attachment xc Dr. J. Nelson Crace, Regional Administration U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. P. K. Van Doorn NRC Resident Inspector Catawba Nuclear Station fgol 8705120224 870501 PDR ADOCK 050 3
G 4,
DUKE POWER COMPANY RESPONSE TO VIOLATION 50-413/87-03-01, 50-414/87-03-01 Technical Specification 6.8.1.d requires that written procedures shall be established, implemented and maintained covering emergency plan implementation.
Contrary to the above, as evidenced by review of controlled copies of Emergency Plan Implementing Procedures (EPIPs), the licensee failed to maintain and update controlled EPIPs assigned to principals of the Site Emergency Response Organization, by neglecting to distribute and include Change 0 of Response Procedure RP/0/B/5000/14, " Followup Notifications from TSC", within such procedures.
RESPONSE
(1) Admission or Denial of Violation Duke Power Company admits the violation.
(2) Reasons for Violation if Admitted Personnel error was the cause for this violation.
The procedure was not properly distributed.
(3) Corrective Actions Taken and Results Achieved A backup method has been implemented for the distribution of these procedures.
A different person now assures these procedures are distributed. Also, an independent person acts as a backup.
(4) Corrective Actions to be Taken to Avoid Further Violations Actions taken in Section 3 above should ensure avoidance of future violations.
(5) Date of Full Compliance Duke Power Company is now in full Compliance.
}