ML20215L376

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-267/87-09 on 870401-30.No Violations or Deviations Noted.Actions Taken Re Previously Identified Findings Examined
ML20215L376
Person / Time
Site: Fort Saint Vrain 
Issue date: 05/06/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20215L379 List:
References
NUDOCS 8705120217
Download: ML20215L376 (2)


See also: IR 05000267/1987009

Text

.

-

.

.

.-

,

' -

^

MAY 6 - 1987

J

+

- In Reply Refer Toi

'

Docket: -50-267/87-09

Public Service Company of Colora'do

~ ATTN: Robert 0. Williams, Jr.

Vice Prdsident, Nuclear

Operations

P. O. Box 840'

.

Denver, Colorado

80201

Gentlemen:

This refers to the inspection conducted by Messrs R. E. Farrell, P. W. Michaud,

.

D. L. DuBois,'and W. R. Bennett of this office during the period April 1-30,

1987, of activities authorized by NRC Operating License DPR-34 for

. Fort St. 'Vrain Nuclear Generating Station, and to the discussion of our

'

findings with you and other members of your staff at the conclusion of the

~ inspection.

~

. Areas examined during the inspection included operational safety verification,-

previously identified inspection: findings, surveillance, maintenance, ESF

'

walkdown, and security. ' Within these' areas, the inspection consisted of

selective examination of procedures and representative records, interviews with

personnel, and observations by the'NRC inspector. The inspection findings are

' documented in the enclosed inspection report.

' Within the. scope of the ' inspection, no violations.or deviations were '

--identified.

>

We have also examined actions you have taken with regard to previously

identified inspection findings.- The status of these items is identified in

paragraph 3 of the-enclosed report.

'

4

'Should you have any questions concerning this inspection, we will be pleased to

- discuss them with you.

i -

. Sincerely,

mreinsi srane:d tyi

11. E. HAf.l.'8

'

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosure:

(seenextpage)

h\\

\\

5 R.l j

RI

PI Atf

C :RPB/A

RPB

RIlR[:chaud/tw

i

Farrell

LDu

is

WRBennettJfdaudon

EGa liardo

,Q

sier

iuici

g

8,

s i i81 s n ici

si 181

4

8705120217 870506

PDR

ADOCK 05000267

gI

G

PDR

<

-.

. - -. .

- . . .

.

. - - .

.- -. .

- - . .

-

-.

. .-

>

-

.c

-

,

.:

-

s

,

Public Service Company of Colorado

-2-

- .

' Enclosure:

Appendix - NRC Inspection Report

50-267/87-09-

cc w/ enclosure:

-

Manager, Nuclear

' Production Division

Fort St. Vrain Nuclear Generating Station

16805 WCR 19 1/2

Platteville, Colorado

80651

P. Tomlinson, Manager, Quality

Assurance Division-

i(Same Address)

Colorado'Ra'diation. Control Program Director

Colorado Public Utilities Commission -

bcc to DMB (IE01)

bcc distrib. by RIV:

  • RPB

R. D. Martin, RA

  • RRI

DRSP

  • Section Chief (RPB/A)
  • RIV File
  • Section Chief (RSB/ES)
  • R&SPB
  • RSTS OPERATOR
  • MIS System
  • RSB
  • Project Inspector
  • D. Weiss, RM/ALF
  • R. Hall

Enforcement Officer

  • w/766

,

- _-

,.

-

.

-._

..-

._ _

. - . - .