- NRC QPERATING STATUS REPORT COMPLETED BY REACTOR EN61NEERING etteete
- 1. 00CKET....58-423 OPERATING STATUS
- 2. REPORTING PERIOD... APRIL 1987 OUTAGE + ONLINE HOURS... 282.2 + 436.8 = 719
- 3. UTILITY CONTACT.................A. L. ELMS 283-444-5388
- eesee
- 4. LICENSED THERMAL P0NER.........................................
3411 e MILLSTONE e
- 5. NAMEPLA TE R AT I N6 (6ROSS ME)................................... 1,253 M e UNIT 3
- 6. DES 16N ELECTRICAL RATING (NET ME)..............................
1153.61 He**********
- 7. MA!! MUM DEPENDABLE CAPACITY (6ROSS MEl........................
1197
- 8. MAllMUM DEPENDABLE CAP ACITY ( NET MEl........................... 1141.93 9.
IF CHAN6ES DCCUR A80VE SINCE LAST REPORT, REASONS ARE...........
N/A II. PONER LEVEL TO NHICH RESTRICTED, IF ANY (NET M E)...............N/A
- 11. REASON FOR RESTRICTION, IF ANY....N/A MONTH YEAR TO DATE CUMULATIVE TO DATE 33333 333333333333 333333333333333333
- 12. HOURS IN REPORTING PERIOD 719.I 2079.I 9951.8
- 13. NUMBER OF HOURS THE REACTOR NAS CRITICAL 488.6 2171.9 7583.7
- 14. REACTOR RESERVE SHUTDONN HOURS I.I I.I 83.2
- 15. HOURS 6ENERATOR ONLINE 436.8 2116.2 7462.1
- 16. UNIT RESERVE SHUTDO M HOURS I.I I.I I.I
- 17. GROSS THERMAL ENERGY 6ENERATED (MH) 1398883.1 6934117.2 24674041.4
- 18. GROSS ELECTRICAL ENER6Y 6ENERATED (MH) 482683.5 2398323.I B531487.5
- 19. NET ELECTRICAL ENER6Y GENERATED (MH) 453732.I 2283256.I 8145818.7
- 28. UNIT SERVICE FACTOR 68.8 73.2 83.4
- 21. UNIT AVAILABILITY FACTOR 68.8 73.2 83.4 i
- 22. UNIT CAPACITY FACTOR (dSING MDC NET) 55.3 69.5 79.4
(
- 23. UNIT CAPACITY FACTOR (USING DER NET) 54.7 68.7 78.9 l
- 24. UNIT FORCED OUTAGE RATE 6.2 3.7 9.6
- 25. UNIT FORCED OUTA6E HOURS 28.8 88.5 796.6 I
SHUTDOMS SCHEDULED OVER NEIT S!! MONTHS (TYPE, DATE, AND DURATION OF EACHl..............
t N/A l
IF CURRENTLY SHUTDONN, ESTIMATED STARTUP DATE......N/A l
f Yf B70512O207 870508 1/I l
PDR ADOCK 05000424 R
pop
1 AVERA6E DAILY-UNIT. POWER LEVEL
~ DOCKET NO.
58-423_,
' UNIT Millstone Unit 3 DATE 85-06-1987
~ COMPLETED BY A. L. ELMS (2831444 5388 MONTH APRIL DAY AVERAGE DAILY POWER LEVEL DAY AVERA6E DAILY POWER LEVEL (MWE-NET)
(MWE-NET) 1 8
16 1.113 2
8 17 1.143 3
8 18 1.141 4
8
.19-1.145 5
8 28 1.141 6
8 21 1.144
.7 8
22 1.141 8
8 23 1.142 9
8 24 1.147 18 8
25 1.145 11.
88 26 1.142 12 92 27 1.131 13 154 28 1.121 14 833 29 1.125 15 938 38 1.148
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-423 UNIT Millstone Unit No. 3 DATE May 5, 1987 COMPLETED BY A. Elms TELEPHONE (203) 444-5388 REPORT MONTH April 1987 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No.
Date Type (1)
(Hours)
Reason (2)
Down Reactor (3)
Report #
Code Code Prevent Recurrence 87-05 4/1/87 S
253.4 8
4 N/A N/A N/A Continuation from previous month.
Manual reactor scram for testing.
Shutdown for surveillance requirements.
87-06 4/12/87 F
28.8 A
3 87-020-00 JB FCV Reactor trip on D S/G low level caused by low feed header pressure due to a-turbine driven feed pump.
oscillations and the in-ability of the master speed controller to raise the speed in manual. The D feedwater regulating control valve failed to open to compensate for low feed header pressure due to a control air leak.
The air leak was repaired.
1 2
3 4
-F:
Forced Reason:
Method:
~ Exhibit G - Instructions S:
Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Sheets for C - Refueling 3 - Automatic Scram Licensed Event Report D - Regulatory Restriction 4 - Continued from (LER) File (NUREG-0161)
E - Operator Training & License previous month Examination 5 - Power Reduction 5 F - Administrative (Duration = 0)
Exhibit 1 - Same Source G - Operational Error (Explain) 9 - Other (Explain)
H - Other (Explain)
/
NORTHEAST UTILITIES o nor.i Orr,c... seio n sir..t. Beriin. connecticui
. (o cr<v,twea= =.cw=,
9
.w..
- m at ac c"*'
P.O. BOX 270 sn...ua o a c"**
HARTFORD. CONNECTICUT 06141-0270 C32 (($N,Ic.*',
(203) 665-5000 k
k May 8, 1987 MP-10355 Re:
U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555
Reference:
Facility Operating License No. NPF-49 Docket No. 50-423
Dear Sir:
In accordance with reporting requirements of Technical Specifications Section 6.9.1.5, the Millstone Nuclear Power Station - Unit 3 Monthly Operating Report 87-05 covering operations for the month of April is l
hereby forwarded.
Yours truly NORTHEAST NUCLEAR ENERGY COMPANY J W1-Step en E. Scace Station Superintendent Millstone Nuclear Power Station i
{
SES/AE: Jim l
Attachment cc:
Regional Administrator, Office of Inspection and Enforcement, Region I l
Director, Office of Inspection and Enforcement, Washington, D.C. (10) l Director, Office of Resource Management l
T. Shedlosky, Sr. Resident Inspector l
l
.