ML20215L357

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1987
ML20215L357
Person / Time
Site: Millstone 
Issue date: 04/30/1987
From: Elms A, Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
MP-10355, NUDOCS 8705120207
Download: ML20215L357 (4)


Text

r

              • NRC QPERATING STATUS REPORT COMPLETED BY REACTOR EN61NEERING etteete
1. 00CKET....58-423 OPERATING STATUS
2. REPORTING PERIOD... APRIL 1987 OUTAGE + ONLINE HOURS... 282.2 + 436.8 = 719
3. UTILITY CONTACT.................A. L. ELMS 283-444-5388
                • eesee
4. LICENSED THERMAL P0NER.........................................

3411 e MILLSTONE e

5. NAMEPLA TE R AT I N6 (6ROSS ME)................................... 1,253 M e UNIT 3
6. DES 16N ELECTRICAL RATING (NET ME)..............................

1153.61 He**********

7. MA!! MUM DEPENDABLE CAPACITY (6ROSS MEl........................

1197

8. MAllMUM DEPENDABLE CAP ACITY ( NET MEl........................... 1141.93 9.

IF CHAN6ES DCCUR A80VE SINCE LAST REPORT, REASONS ARE...........

N/A II. PONER LEVEL TO NHICH RESTRICTED, IF ANY (NET M E)...............N/A

11. REASON FOR RESTRICTION, IF ANY....N/A MONTH YEAR TO DATE CUMULATIVE TO DATE 33333 333333333333 333333333333333333
12. HOURS IN REPORTING PERIOD 719.I 2079.I 9951.8
13. NUMBER OF HOURS THE REACTOR NAS CRITICAL 488.6 2171.9 7583.7
14. REACTOR RESERVE SHUTDONN HOURS I.I I.I 83.2
15. HOURS 6ENERATOR ONLINE 436.8 2116.2 7462.1
16. UNIT RESERVE SHUTDO M HOURS I.I I.I I.I
17. GROSS THERMAL ENERGY 6ENERATED (MH) 1398883.1 6934117.2 24674041.4
18. GROSS ELECTRICAL ENER6Y 6ENERATED (MH) 482683.5 2398323.I B531487.5
19. NET ELECTRICAL ENER6Y GENERATED (MH) 453732.I 2283256.I 8145818.7
28. UNIT SERVICE FACTOR 68.8 73.2 83.4
21. UNIT AVAILABILITY FACTOR 68.8 73.2 83.4 i
22. UNIT CAPACITY FACTOR (dSING MDC NET) 55.3 69.5 79.4

(

23. UNIT CAPACITY FACTOR (USING DER NET) 54.7 68.7 78.9 l
24. UNIT FORCED OUTAGE RATE 6.2 3.7 9.6
25. UNIT FORCED OUTA6E HOURS 28.8 88.5 796.6 I

SHUTDOMS SCHEDULED OVER NEIT S!! MONTHS (TYPE, DATE, AND DURATION OF EACHl..............

t N/A l

IF CURRENTLY SHUTDONN, ESTIMATED STARTUP DATE......N/A l

f Yf B70512O207 870508 1/I l

PDR ADOCK 05000424 R

pop

1 AVERA6E DAILY-UNIT. POWER LEVEL

~ DOCKET NO.

58-423_,

' UNIT Millstone Unit 3 DATE 85-06-1987

~ COMPLETED BY A. L. ELMS (2831444 5388 MONTH APRIL DAY AVERAGE DAILY POWER LEVEL DAY AVERA6E DAILY POWER LEVEL (MWE-NET)

(MWE-NET) 1 8

16 1.113 2

8 17 1.143 3

8 18 1.141 4

8

.19-1.145 5

8 28 1.141 6

8 21 1.144

.7 8

22 1.141 8

8 23 1.142 9

8 24 1.147 18 8

25 1.145 11.

88 26 1.142 12 92 27 1.131 13 154 28 1.121 14 833 29 1.125 15 938 38 1.148

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-423 UNIT Millstone Unit No. 3 DATE May 5, 1987 COMPLETED BY A. Elms TELEPHONE (203) 444-5388 REPORT MONTH April 1987 Method of Licensee Cause & Corrective Duration Shutting Event System Component Action to No.

Date Type (1)

(Hours)

Reason (2)

Down Reactor (3)

Report #

Code Code Prevent Recurrence 87-05 4/1/87 S

253.4 8

4 N/A N/A N/A Continuation from previous month.

Manual reactor scram for testing.

Shutdown for surveillance requirements.

87-06 4/12/87 F

28.8 A

3 87-020-00 JB FCV Reactor trip on D S/G low level caused by low feed header pressure due to a-turbine driven feed pump.

oscillations and the in-ability of the master speed controller to raise the speed in manual. The D feedwater regulating control valve failed to open to compensate for low feed header pressure due to a control air leak.

The air leak was repaired.

1 2

3 4

-F:

Forced Reason:

Method:

~ Exhibit G - Instructions S:

Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram Entry Sheets for C - Refueling 3 - Automatic Scram Licensed Event Report D - Regulatory Restriction 4 - Continued from (LER) File (NUREG-0161)

E - Operator Training & License previous month Examination 5 - Power Reduction 5 F - Administrative (Duration = 0)

Exhibit 1 - Same Source G - Operational Error (Explain) 9 - Other (Explain)

H - Other (Explain)

/

NORTHEAST UTILITIES o nor.i Orr,c... seio n sir..t. Beriin. connecticui

. (o cr<v,twea= =.cw=,

9

.w..

- m at ac c"*'

P.O. BOX 270 sn...ua o a c"**

HARTFORD. CONNECTICUT 06141-0270 C32 (($N,Ic.*',

(203) 665-5000 k

k May 8, 1987 MP-10355 Re:

10CFR50.71(a)

U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555

Reference:

Facility Operating License No. NPF-49 Docket No. 50-423

Dear Sir:

In accordance with reporting requirements of Technical Specifications Section 6.9.1.5, the Millstone Nuclear Power Station - Unit 3 Monthly Operating Report 87-05 covering operations for the month of April is l

hereby forwarded.

Yours truly NORTHEAST NUCLEAR ENERGY COMPANY J W1-Step en E. Scace Station Superintendent Millstone Nuclear Power Station i

{

SES/AE: Jim l

Attachment cc:

Regional Administrator, Office of Inspection and Enforcement, Region I l

Director, Office of Inspection and Enforcement, Washington, D.C. (10) l Director, Office of Resource Management l

T. Shedlosky, Sr. Resident Inspector l

l

.