Telephone (412) 393-6000 Nuclear Group P O Box 4 Shippingport, PA 15077-0004 October 9, 1986 Director of Nuclear Reactor Regulation U.
S. Nuclear Regulatory Commission Attn:
Mr. Peter S. Tam, Project Manager Project Directorate No. 2 Division of PWR Licensing - A Washington, DC 20555
- Mail Stop 340 -
Reference:
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Proposed Operating License Change Request No. 126 Gentlemen:
Enclosed are 1.
Three (3) originals and thirty-seven (37) copies of an Application for knendment to our operating license to revise the Control Room Emergency Habitability System requirements.
The changes are proposed to account for the increased capacity of the system due to the planned removal of the wall between the Unit 1 and Unit 2
control rooms.
The proposed knendment reflects the increased capacity of the Control Room Emergency Bottled Air Pressurization System (CREBAPS) and the Control Room Emergency Ventilation System (CREVS),
and updates the operability and surveillance requirements for these systems accordingly.
In
- addition, the amendment would lower the maximum control room air temperature requirements for consistency with Unit 2 Technical
(
Specifications and remove the Unit 2
control room area fire detection instrumentation from the Unit 1
Technical j
Specifications.
l Since this amendment is necessary to allow removal of the wall between the Unit 1
and Unit 2 control rooms, we would like to negotiate with the Project Manager the effective date of this license amendment to coincide with removal of the wall.
In
- addition, the deletion of Unit 2
control room area fire detection instrumentation from Unit 1 Technical Specifications should occur when Unit 2 Technical specifications are effective.
This will ensure that there will be no lapse in the fire detector surveillance requirements.
Therefore, we would like to negotiate the timing of the effective date for this particular change as well.
8610280587 861009 0
DR ADOCK 05000334 h0 PDR
\\
p 3i '
y) pa icaw
B avar Valley Powar Station, Unit No. 1.
Dockst No. 50-334, Licenso No. DPR-66 Proposed Operating License Change Request No. 130' Page 2 These changes have been reviewed in(
the OSC and ORC and determined to be safe and do not involve an unreviewed safety question.
2.
Forty (40) copies of documents designated Attachm.nts A and B which set forth the change in technical specifications and its no significant hazards determination.
A check in the amount of $150.00 is attached as payment of the the license amendment application fee in accordance with 10 CFR 170.
Very truly yours, J. D. Sieber i
Vice President Nuclear Operations Enclosure I
i cc: Mr. W. M. Troskoski, Resident Inspector i
U.
S. Nuclear Regulatory Commission l
Beaver Valley Power Station l
Shippingport, PA 15077 U.
S. Nuclear Regulatory Commission-c/o Document Management Branch Washington, DC 20555 i
Director, Safety Evaluation & Control Virginia Electric & Power Company P.O. Box 26666 One James River Plaza Richmond, VA 23261 l
l Mr. Thomas M. Gerusky, Director Bureau of Radiation Protection Pennsylvania Dept. of Environmental Resources P.O. Box 2063 Harrisburg, PA 17120 l
l