ML20215L332

From kanterella
Jump to navigation Jump to search
Application for Amend to License NPF-43,eliminating Actuation Signal from Radwaste & Turbine Bldg Radiation Monitors That Are Neither Necessary Nor Desirable in Demonstrating Functional Performance of Control Ctr HVAC
ML20215L332
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/24/1986
From: Agosti F
DETROIT EDISON CO.
To: Adensam E
Office of Nuclear Reactor Regulation
Shared Package
ML20215L337 List:
References
VP-86-0132, VP-86-132, NUDOCS 8610280583
Download: ML20215L332 (3)


Text

  • Frank E. Agosti b ., Vice President Nuclear Operations DelrOil rem *

. 6400 North Dme Highway Newport. M+chigan 48166 Nuclear 1 pis,5

  • 4 iso operauons October 24, 198G VP-86-0132 Director of Nuclear Reactor Regulation Ms. Elinor G. Adencam, Director Project Directorate !!o. 3 U. S. Nuclear Regulatory Commission Uachington, D. C. 20555

Dear Ms. Adensam:

Reference:

Fermi - 2 URC Docket No. 50-341 URC Licence No. UPF-43

Subject:

Proposed Technical Specification-Control Room Emerggpcv Filtration System 3/4.7.2.

Pursuant to 10CFR50.90, Detroit Edison Company hereby proposes to amend Operating License UPF-43 for the Fermi 2 plant by incorporating the enclosed change into the Plant Technical Specification 3/4 7.2, titled, " Control Room Emergency Filtration System". The Fermi 2 Control Center Heating, Ventilation and Air Conditioning System (CCHVAC) is an Engineered Safety Feature which ic designed to maintain operator habitability requirements during normal operating and post accident conditions.

The proposed technical specification change will i eliminate the actuation signal from the Radwaste and Turbine building radiation monitors that are neither

( nececcary nor desirable in demonstrating functional l performance of the CCUVAC.

1 i

Detroit Edicon has evaluated the proposed technical specification againct the criteria of 10CFR50.59 and 10CFR50.92 and determined that no unrevieued safety

, quection nor significant hazards considerations is j involved.

! The Fermi 2 Cnsite Review Organization hac approved and the Muclear Safety Review Group has reviewed thic proposed technical specification and concurred with the enclosed determinationc.

1

Pursuant to 10CFR170.12 (c) , enclosed with this amendment requect is a fee of one hundred fifty dollarc ($150.00) .

\

l 8610280583 861024 PDR ADOCK 05000341 Y \

\

P PDR

_ hL c WIl hl$ 3f

Ms. Elinor G. Adensan October 24, 1986 VP-86-0132 Page 2 In accordance with 10CFR50.91, Detroit Edison han provided a copy of this letter to the State of Michigan.

If you have any quectionc, plence contact Mr. Steven Frost at (313) 586-4210.

Sincerely, TkS E cc: Mr . J . J. Stefano Mr. U. G. Rogers Supervisor, Advance Planning and Review Section Michigan Public Service Commiccion USNRC Document Control Deck Washington, D. C. 20555

fin . Elinor G. Adensam October 24, 1986 VP-86-0132 Page 3 I, FRA!'K E . AGOSTI, do hereby affirm that the foregoing statemento are buced on f acts and circumstancec which are true and accurate to the best of my knowledge and belief.

Wc -

FRANK E. 5GOSTI Vice President Nuclear Operations On thic day of M , 1986, before me perconally appeared Frank E. Agosti, being firct duly sworn and says that he executed the foregoing as hin free act and deed.

hw Notary Public MAXCIA EUCK Notary Public. Washtenaw County, MI My Commission Expires Dec.28,IS87 cb y NMW dud 7, W

m-a - _ --- *- _ _ J __ __ _., .,, , , .______,- , _ , _, ._.._ ._,, ,,u_

t 0 8 l

l J

l a

j l

i l

1 3

1 a

2 f

ENCLOSURE 4

i j

i t

i i

l l

l l

I I

l l

i I

l i

f I

f 6

I, l

t


r -..,,,- .... - - - - - , ..m._ _

-_z -m. -