ML20215K327

From kanterella
Jump to navigation Jump to search
Special Rept:On 860624,Channel 5 (Steam Generator a) of Loose Parts Monitoring Sys Declared Inoperable.Work Request Submitted to Repair Accelerometer.Repair Will Be Made During Current Outage
ML20215K327
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 09/05/1986
From: Tucker H
DUKE POWER CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8610280124
Download: ML20215K327 (2)


Text

,

  • =-

DuxE POWER GOMPANY P.O. box 33189 C

HL TTE, N.C. 28242 IIAL II. TUCKER TELEPHONE vMa reesment 86 SEP 8 All : 1 S September 5, 1986 Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Re: Catawba Nuclear Station, Unit 2 Docket No. 50-414 i

Dear Dr. Grace:

Pursuant to Technical Specification 3.3.3.9 and 6.9.2, please find attached a Special Report concerning the inoperability of a channel of the Loose Parts Monitoring System.

Very truly yours, MaC/'W Hal B. Tucker RWO/17/slb Attachment xc: Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 NRC Resident Inspector Catawba Nuclear Station Od coM 8610280124 860905 ADOCK 05000414 PDR' PDR~

S

[

f "n

e.a 1

e f

SPECIAL REPORT CATAWBA NUCLEAR STATION 6

i On June 24, 1986 Channel 5 (Steam Generator A) of the Loose Parts Monitoring System l

was declared inoperable. A Work Reg. rest was submitted to repair the accelerometer, j

The repair will be made during the current Unit 2 outage, j

6 r

?

l t

r i

^~

f P

b t

i i

l I

'I

[

a i

1 s

-....