ML20215K190

From kanterella
Jump to navigation Jump to search
Responds to Insp Rept 50-220/85-06 Indicating Sept 1986 Completion Date for Consolidation of safety-related Support Info Into One Set of as-built Drawings.Drawings Updated But Engineering Review Will Not Be Completed Until 861231
ML20215K190
Person / Time
Site: Nine Mile Point 
Issue date: 09/30/1986
From: Lempges T
NIAGARA MOHAWK POWER CORP.
To: Ebneter S
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NMP1L-0100, NMP1L-100, NUDOCS 8610280018
Download: ML20215K190 (1)


Text

_ _ _

L o

M Y NIAGARA I

RUMOHAWK aHAGARA MOHAWK POWER CORPORATl0N/300 ERLE BOULEVARD WEST, SYRACUSE. N.Y.132.02/ TELEPHONE (315) 4741511 i

i i

i i

I i

i t

j-September 30, 1986 l

l NMP1L 0100 Mr. Stuart D. Ebneter, Director a

Division of Reactor Safety U.S. Nuclear Regulatory Commission Region I 631 Park Avenue

)

King of Prussia, PA 19406

)

5 i

Re: Nine Mile Point Unit 1 l

Docket No. 50-220 j

DPR-63 l

I i

Dear Mr. Ebneter:

i i

i In your Inspection Report No. 50-220/85-06 it was indicated that the i

i consolidation of information associated with each (safety related) support l

onto one as-built drawings would be completed by September 1986. Although all i

1 of the drawings have been updated, approximately 2,000 of the approximately i

3,900 safety related support drawings have not been reviewed and accepted by l

Niagara Mohawk Engineering. The review and approval of the as-built drawings i

will be completed by December 31, 1986.

l Ve y truly yours, i

b b

.Lem!

j T.

l Vice President j

Nuclear Generation TEL:bd 1