ML20215J944
| ML20215J944 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 06/16/1987 |
| From: | Lazarus W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mroczka E NORTHEAST NUCLEAR ENERGY CO. |
| References | |
| NUDOCS 8706250159 | |
| Download: ML20215J944 (3) | |
Text
,
i v
i
[
JUN 16 1987 Docket Nos. 50-245 50-336 50-423 Northeast Nuclear Energy Company ATTH: Mr. E. J. Mroczka Senior Vice President - Nuclear Engineering and Operations Group
]
P. O. Box 270 Hartford, Connecticut 06141-0270 Gentlemen:
In order for the Region to fully support the Millstone partial-scale emergency exercise scheduled for the week of October 5, 1987, an adequate review of the exercise objectives and scenario is essential.
The guidelines 1dentified below will be used for the submittal and review of the objectives and scenario packages prior to the exercise.
You will note that the schedule is similar to the least restrictive submittal schedule noted in FEMA Guidance Memorandum No.
17, Revision 1, for comparable milestones.
Region I has found that licensees i
generally comply with these guidelines, however, we recognize the need to l
stress the importance of both completeness and timeliness.
The following schedule should be used for all exercises:
Days in Advance Information to be Submitted 75 Days Description and scope of exercise, and the objectives to be fulfilled should be received in the Region I office. The objectives should include specific objectives to demonstrate, where appropriate, the effectiveness of corrective actions taken in regard to problem areas which have been previously identified during NRC inspections, emergency exercises and drills and your internal evaluation process.
l 60 Days NRC will provide comments in writing, based on our review of your submittal.
45 Days Complete exercise scenario package with modified objectives, schedules, exercise rules, all controller, contingency and simulation informa-tion, all data, including plant data, radiation level and release rate data, and samples of the data to be presented should be received in the Region I office.
pW2M BW$p g ((p /
5 i
F t
- k j
r q
Northeast Nuclear Energy Company 2
1 1
30 Days NRC will provide comments in writing, based on our (and our contractor's) review of your submittal.
In order to protect the scenario from disclosure to participants, please send two copies to the Chief, Emergency Preparedness Section at the Letterhead address, marked, " EMERGENCY EXERCISE SCENARIO /0BJECTIVES."
In addition, please send two copies directly to Battelle Pacific Northwest Laboratory, Attention:
Mr. James' Jamison, Emergency Preparedness Group, Health Physics Department, 2955 George Washington Way, Richland, WA 99352, in order to i
expedite the review process.
If you anticipate that the deadline will not be met, we recommend you use overnight mail.
The NRC emergency preparedness specialist responsible for evaluation of your exercise is Mr. Walter V. Thomas.
Please identify the name, address and phone number of the individual on your staff with whom we should interface.
l Your continued cooperation in this matter is greatly appreciated.
If you have any concerns or questions, please contact Mr. Thomas at 215-337-5043.
Sincerely, Originni Signea By:
b (l. hClMY%dur)
,ldL4lilliam J. Lazarus, Chief V Emergency Preparedness Section Division of Radiation Safety and Safeguards cc:
W. D. Romberg, Vice Fresident, Nuclear Operations S. E. Scace, Station Superintendent D. O. Nordquist, Manager of Quality Assurance R. M. Kacich, Manager, Generation Facilities Licensing Gerald Garfield, Esquire Edward Malloy, Supervisor, Emergency Preparedness Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector State of Connecticut i
1 l
l l
1
)
r;-
r,7
- q nt
.W h-
.:s s
^~
North' east Nuclear Energy.~ Company 3
j s
e bec': -
Region lliDocket. Room (withconcurrences).
DRP Section Chief Robert J. Bores, DRSS L
o.
p,.. Gaul fW.? Thomas >
'J;.Schumacher-M. McBride, RI, Pilgrim.
'P. Swetland, SRI, Haddam hck.
'J. Shedlosky, SRI', Millstone:3 J. Shea, LPM, NRR D. Jaffe, LPM,.NRR'
-L.lPrividy,'RI,BeaverValley. Unit 2 T.:Rebelowski, SRI, Millstone 1&2 B. Doolittle, LPM, NRR' 1
. 1 -
1
- RI"iDRS
[ RI:DRSS 1:DRSS R: R 6//g/87%, Schumacher Thoma Ga Lazarus 6//f/87 6//5/87 6/
8 0FFICIAL RECORD COPY
.