Requests Specific Info as Part of Supplemental Summary Rept on Dcrdr License Condition 2.C(7)c to Be Submitted by 880301.Info Requirements Encl
ML20215J899
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 05/04/1987
From: Mark Miller
Office of Nuclear Reactor Regulation
To: James O'Reilly
GEORGIA POWER CO.
References
NUDOCS 8705080320
Download: ML20215J899 (3)


Text

p Docket No.: 424-3gg7 Mr; James'P. O'Reilly.

Senior Vice President -

Nuclear Operations

-Georgia Power Company P. O. Box 4545 Atlanta,' Georgia 30302

Dear Mr. 0'Reilly:

I

Subject:

Control Room Preliminary Environmental Survey l

By letter dated April 10, 1987, Georgia Power Company (GPC) provided information regarding a control room preliminary environmental (heating, ventilation and air conditioning) survey. Based on our review of this, it appears as if the control room may be too cool. Accordingly, we are requesting that GPC provide some spe-cific information as part of its Supplemental Summary) Report on the detailed control room design review (license condition 2.C(7)c to be submitted by March 1, 1988. The infonnation requirements are presented in the enclosure.

I f

If there are any questions en this matter, please contact me at (301)492-7357.

Sincerely, Melan e L. Miller, Project Manager Project Directorate II-3 Division of Reactor Projects-I/II f

Enclosure:

As stated cc: See next page i

Distribution:

Q ocket Ffle 3 NRC~PDR Local PDR PRC System PD#II-3 Reading M0uncan l

MMiller BJYoungblood Reading I

AD/ Region II EJordan l

JPartlow 8705000320 E7o5o4 OGC-Bethesda PDR ADOCK c5000424 P

PDR l

ACRS(10)

/

l Glapinsky J

WRegan kDRP-I/II PD#g'-3fb P-I/II J d P-I/II LHFB LFF PD#

/mac Gla y

WFe an Ndu 'ah BJYo biled 0Qy87 05/

/87 05/y/87 05/ -/87 05/

/87 l

l t

Mr. J. P. O'Reilly Georgia Power Company Vogtle Electric Generating Plant cc:

Mr. L. T. Gucwa Resident Inspector Chief Nuclear Engineer Nuclear Regulatory Comission Georgia Power Company P. O. Box 572 P.O. Box 4545 Waynesboro, Georgia 30830 Atlanta, Georgia 30302 Mr. Ruble A. Thomas Deopish Kirkland. III, Counsel Vice President - Licensing Office of the Consumers' Utility Vogtle Project Council Georgia Power Company /

Suite 225 Southern Company Services, Inc.

32 Peachtree Street, N.W.

P.O. Box 2625 Atlanta, Georgia 30303 Birmingham, Alabama 35202 James E. Joiner Mr. Paul D. Rice Troutman, Sanders, Lockerman, Vice President & Project Director

& Ashmore Georgia Power Company Candler Building Post Office Box 299A, Route 2 127 Peachtree Street, N.E.

Waynesboro, Georgia 30830 Atlanta, Georgia 30303 Danny Feig Mr. J. A. Bailey 1130 Alta Avenue Project Licensing Manager Atlanta, Georgia 30307 Southern Company Services, Inc.

P.O. Box 2625 Carol Stangler Binningham, Alabama 35202 Georgians Against Nuclear Energy 425 Euclid Terrace Ernest L. Blake, Jr.

Atlanta, Georgia 30307 Bruce W. Churchill, Esq.

Shaw, Pittman, Potts and Trowbridge 2300 N Street, N.W.

Washington, D. C.

20037 Mr. G. Bockhold, Jr.

Vogtle Plant Manager Georgia Power Company Route 2, Box 299-A Waynesboro, Georgia 30830 Regional Administrator, Region II U.S. Nuclear Regulatory Comission 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 Mr. R. E. Conway Senior Vice President and Project Director Georgia Power Company Rt. 2, P. O. Box 299A Waynesboro, Georgia 30830

ENCLOSURE Information Required as Part of DCRDR Supplemental Summary Report (License Condition 2.C(7)c) 1.

Conduct the final control room environmental survey under both heating and air conditioning environments.

2.

Perform humidity and temperature readings at floor level and at the 6 foot level as part of the final survey.

3.

Obtain subjective readings on the control room environment (humidity, temperature and air velocity) under both heating and air conditioning environments from each crew member over a period of several days by pro-viding each individual with a brief survey soliciting opinion on their comfort level. Summarize and discuss these findings in the summary report.

4 In the supplemental report, clarify whether temperatures are we t bulb or dry bulb.

l

_ _ _ - - _ _ _ _ _ _ _ _ _ _