Advises That Once-Through Steam Generator a Had 21 Tubes Plugged & Generator B Had 2 Tubes Plugged,Per Tech Spec 4.17.6(a)
ML20215J876
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 09/02/1986
From: Tucker H
DUKE POWER CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8610270225
Download: ML20215J876 (1)


Text

  • ~

r DUKE POWER GOMPANY P.O. BOX 33189 CHARLOTTE, N.C. 28242 HALH. TUCKER TELEPHOME g\\\\. p goy om.um g

September 2, 1986 Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Re: Oconee Nuclear Station, Unit 1 Docket No. 50-269

Dear Dr. Grace:

Pursuant to Oconee Nuclear Station Technical Specification 4.~17.6(a), Duke Power Company (Duke) is providing the following information concerning the Oconee Unit 1 steam generators. The following steam generator tubes were plugged during a recent Unit 1 maintenance outage. The "A" OTSG had a total of 21 tubes plugged while the "B" OTSG had 2 tubes plugged.

Very truly yours,

')h/RL/49"t. -

Hal B. Tucker WHM/13/slb Attachments xc:

Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Ms. Helen Pastis Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Mr. J. C. Bryant

.Oggg, con NRC Resident Inspector Oconee Nuclear Station

~

. LEO \\

go2;ggg gygge

)o P

-