ML20215J601

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec Section 3.5.1,allowing Unit to Remain in Hot Standby W/Rcs Pressure Less than or Equal to 1,000 Psig W/One Accumulator Inoperable
ML20215J601
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 06/19/1987
From:
WOLF CREEK NUCLEAR OPERATING CORP.
To:
Shared Package
ML20215J577 List:
References
NUDOCS 8706250054
Download: ML20215J601 (2)


Text

',

1

. s: _

j b Br t cM, 2 *

^

1 : 3.-

- La-:

+

e

-x gmym. ;

-f[

4 4

P v..

tls

+ 1

[

, - 4. 9:

,,, j' '

'l in9 S fi+

(i!

.y J

I

' h,' r.'f,',h

'  ? <

,' l a

v

~...kn

,.\\

-l

.m

?

1 i

k i s.

A g +ii f

-il r re h

/

.r t

s

'-k'.

...g-

"lJj ;jt})(-

< :!, - y :..

ATTACHMENT-'III i

PROPOSED TECHNICAL SPECIFICATION CHANGES-f.s. ;

-. g, h

s c :; d :

.':] },

1

/

F\\

1' T.

g f

--y

.i

.]

i

!a i

t.

i l

8706250054 870619 l

PDR ADOCK 05000482 r.

P PDR i

.I e

,1,.

I

p;ma 3; We",IAYtachmentill tsiEl 8/-0220 (Page '1. ot:f1:

i T

M Jyne L19,31987;

.,'y' l[. l*L '

s dI.

'3/4.5'~EMERGENCYCORECOOLINGSYSTEMS-3/4.5.'l--ACCUMULATORS iLIMITING CONDITION FOR OPERATION--

n 4.3. 5; 1 Each ' Reactor. Coolant System accumulator-shall be OPERNBLE w'ith:

+

1

.a.

'The11 solation' valve open and' power removed,.

6 b'.

',A contained borated water volume-of between 6122 and 6594: gallons,-

+

c.

A boron concentration of between 1900'and 2100 ppm, and E d.

A nitrogen; cover pressure'of.between 585 and 665 psig.-

ivu APPLIC BILITY: lM0'0ESil,.2, an'd 3*,

g

ACTION:

a.

With one accumuldtor inoperable, except"as.'a result' of a closed-

isolation valve, restore the inoperable
accumulator to OPERABLE

! status within:1 hour or-be. in at least HOT STANDBY within the next 1

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in ll0T :llUT00WN within the followin 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

educ_e RCS ress e to less tflan L000mst

'b.

. With one accumulator sino eraDTe aue7o-t.ne 1so sauorr valve being, closed, either immediately.open'the. isolation. valve or be in'at J1 east HOT STANDBY within 6' hours "and in ll0T 0llUT00WN 'wi.hin the r ue C re to ess t an

following 6' hours, iO00. psig. p es r

l SURVEILLANCE REQUIREMENTS-i sm

.. j

'4.5.1.1 Each accumulator _shall be demonstrated OPERABLE:

a, At'least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> by:

1 1)

Verifying, by the ' absence of alarms, the contained borated water volume and nitrogen cover pressure in the tanks, and j

l 2)

Verifying that each accumulator isolation valve is open.

.l 1

  • Pressurizer pressure above 1000 psig.

1 1

WOLF CREEK - UNIT 1 3/4 5-1 D

.