ML20215J580
| ML20215J580 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 10/17/1986 |
| From: | Harrison J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20215J583 | List: |
| References | |
| NUDOCS 8610270096 | |
| Download: ML20215J580 (2) | |
See also: IR 05000456/1986038
Text
=
.
OCT 171986
Docket No. 50-456
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. T. E. Vandel,
N. C. Choules, and R. N. Sutphin of this office on August 18, 19, 21, 25-27
and September 8-11, 16, 18, 1986, of activities at Braidwood Station, Unit 1,
authorized by Construction Permit No. CPPR-132 and to the discussion of our
findings with Messrs. E. E. Fitzpatrick, C. W. Schroeder and others of your
staff at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures arid representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Original signed by J. W. Muffett (for)
J. J. Harrison, Chief
Engineering Branch
Enclosure:
Inspection Report
No. 50-456/86038(DRS)
See Attached Distribution
R
RI
"II
RII
RIl
RIII
,
d
JwM t
el/Is
C
es
Sutphin
Jalonski
Gdr
1e
HarrisonT D
/gi7/#6
8610270096 861017
,b
ic/d[6 l'
DR
ADOCK 0500
6
-
..
Commonwealth Edison Company
2
GCT 171986
Distribution
cc w/ enclosure:
D. L. Farrar, Director
of Nuclear Licensing
M. Wallace, Project Manager
D. Shamblin, Construction
Superintendent
E. E. Fitzpatrick, Station
Manager
P. L. Barnes, Regulatory
Assurance Supervisor
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
Phyllis Dunton, Attorney
General's Office, Environmental
Control Division
D. W. Cassel, Jr. , Esq.
J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
Division
E. Chan, ELD
J. Moore, ELD
G. Berry, ELD
J. Stevens, NRR
The Honorable Herbert Grossman, ASLB
The Honorable A. Dixon Callihan, ASLB
The Honorable Richard F. Cole, ASLB