Text
-
~
A
v.
(...
7 APPENDIX A s
j =
~
LobisianaP'ower&LightCompany Docket: '50-382/87-05 4
. Waterford 3 License: NPF-38
~
'During an NRC' inspection conducted on February 9-13, 1987, a violation of NRC requirements was identified. The violations involved a failure to identify and take corrective. action in regards' to valve operators for which acceptance criteria had been exceeded.. In accordance with the " General Statement of
.PolicyLand Procedure for NRC Enforcement Actions," 10 CFR Part 2 Appendix C (1986), the. violation is listed below:
Critierion' XI of 10 CFR 50 Appendix B, as implemented by paragraphs 17.2.15 1
-and 17.2.16 of the FSAR, dated December 18, 1986, states, in part, "A test program shall be established to assure that all testing required to demonstrate that structures, systems, and components will perform
- V satisfactorily in service ~is identified and performed in accordance with written test procedures which incorporate the requirements and acceptance limits contained in applicable design documents. The test program shall include, as appropriate... operational tests during nuclear power.
plant... operation, of.. _. components... Test results shall be documented and evaluated to assure that test requirements have been satisfied."
Contrary to the above, during operational testing of. safety-related Limitorque valve operators certain acceptance limits permitted by the test procedures'had been exceeded and an_ evaluation had not been performed to assure that test requirements had been satisfied and that the operators would perform satisfactorily during service.
i This is a Severity Level IV violation.
(Supplement I)(50-382/8705-01)-
i.
Pursuant to the provisions of 10 CFR 2.201, Louisiana Power & Light Company is hereby required to submit to this office within 30 days of the date of the letter. transmitting this Notice, a written statement or explanation in reply, including for each violation:
(1) the reason for the violation if admitted, (2) the corrective steps which have been taken and the results achieved, (3) the corrective steps which will be taken to avoid further violations, and (4) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.
1 Dated at Arlington,' Texas this 4th day of May 1987 i