ML20215J336
| ML20215J336 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 09/10/1986 |
| From: | Tucker H DUKE POWER CO. |
| To: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| NUDOCS 8610240396 | |
| Download: ML20215J336 (1) | |
Text
_ _ _ _ _ _
9 9
DUKE POWER GOMPANY P.O. DOx 33180 CIEAHLOTTE, N.C. 20242 IIAL H. TUCKER g
43
[g**[7f n
,g 3ty g September 10, 1986 Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900
/tlanta, Georgia 30323 I
Subject:
Catawba Nuclear Station, Unit 1 Docket No. 50-413 Steam Generator Inspection
Dear Dr. Grace:
l Pursuant to Technical Specifications 4.4.5.5 and 6.9.2, Duke Power reports that a routine inspection of all four steam generators was completed at Catawba Unit 1 on August 31, 1986. As the result of this inspection, zero tubes were plugged.
Furthermore, no results fell into Category C-3.
Very truly yours.
4 /k r' O
Hal B. Tucker ROS/18/slb xc:
NRC Resident Inspector Catawba Nuclear Station Dr. K. Jabbour Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555
['t p....,
'M l
$YO *,Qj g
y
~.0FFICIAL, copy 8610240396 860710
~~'
PDR ADOCK 05000413 G
PDR I)Q
_-