ML20215J220

From kanterella
Jump to navigation Jump to search
Safety Evaluation Approving post-irradiation Fuel Surveillance Program
ML20215J220
Person / Time
Site: Limerick Constellation icon.png
Issue date: 05/04/1987
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20215J208 List:
References
NUDOCS 8705070291
Download: ML20215J220 (4)


Text

.

por UNITED STATES

['

g NUCLEAR REGULATORY COMMISSION

] g ['- r y

WASHINGTON, D. C. 20555

\\

1 ENCLOSURE SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO POST-IRRADIATION FUEL SURVEILLANCE PROGRAM OF LIMERICK GENERATING STATION UNIT 1

1.0 INTRODUCTION

By.latter dated September 12, 1986 (Ref. 1) from M. J. Cooney, Philadelphia Electric Company (PECo), to Robert Bernero, Director of Boiling Water Reactor Licensing, NRC, PEco informed NRC that routine visual inspection of representative (usually discharged) fuel will' be -

performed in connection with each refueling outage to comply with Section 4.2.4.3 of the NRC's Safety Evaluation Report (SER)' of the Limerick Unit 1 Station-by using the General Electric (GE) Post Irradiation Surveil-lance Program. The NRC staff has reviewed this letter to confirm that -

the licensee's proposal satisfies the Section 4.2.4.3 condition of approval.

2.0 EVALUATION

{

The General Electric (GE) Post Irradiation Surveillance Program has been f

previously reviewed by the staff and approved based on the use of design methodologies and testing procedures described in References 2, 4, 5,.

6, 7, 8 and 9 in accordance with the Post-Irradiation Surveillance, I

l l

8705070291 870504 PDR ADOCK 05000352 P

PDR

I Section II.D.3 of Standard Review Plan (SRP) 4.2 (Ref. 3). Therefore, we conclude that the Post-Irradiation Surveillance Program of the Spent Fuel Assembly of Limerick Generating Station Unit 1 is acceptable.

The licensee has proposed that the routine visual inspection of representative (usually discharged) fuel will be performed in conrection with each refueling outage by using the GE Post-Irradiation Surveillance Program. The staff finds that the licensee proposal is acceptable and appropriate.

3.0 CONCLUSION

S The staff has concluded, based on the considerations discussed above, that the Post-Irradia+. ion Fuel Surveillance has been correctly based on the results of the pre-approved staff analyses and the commitment made by PECo during the Limerick license review has been satisfied.

Principal Cpntributer:

U. Cheh 4

Date: May 4, 1937

4.0 REFERENCES

1.

Letter from M. J. Cooney, Philedelphia Electric Company to Robert Bernero, NRC, " Limerick Generating Station Unit 1, Fuel Surveillance Program" dated Septenher 12, 1986.

2.

Section 4.2.4.3, Post-Irradiation Surveillance, Safety Evaluation.

Report (SER) related to tha Operation of Limerick Generating' Station Units 1 and 2, Docket Nos. 50-352 and 50-353, Philadelphia Electric Company, dated August 1983.

3.

Section II.D.3, Post-Irradiation Surveillarce of 4.2 Fuel System Design, Standard Review Plan (SRP), Revision 2, dated July 1981.

4.

NEDE-24343-P, " Experience with BWR Fuel through January 1981,"

dated May 1981.

5.

Letter from J. S. Charnley, GE to C. H. Berlinger, NRC, " Post-Irradia-tion Fuel Surveillance Program," dated November 23, 1983.

6.

Letter from L. S. Rubenstein, NPC, to R. L. Gridley, GE, " Post-Irradia-tion Fuel Surveillance," dated January 18, 1984.

7.

Letter from J. S. Charnley, GE to L. S. Rubenstein, NRC, " Fuel Surveillance Program," dated February 29, 1984.

8.

Letter from J. S. Charnley, GE to L. S. Rubenstein, NRC, " Additional Details Pegarding Fuel Surveillance Program," dated May 25, 1984.

b

g-,

9.

Letter from L. S. Rubenstein, NRC to R. L. Gridley, GE, " Acceptance I

of GE Proposed Fuel Surveillance Procram," dated June ~27, 1984 I,

i i

l.

I i

I 1

i 2

t i

i

'I J

i 1

i t

J I'

i s

1 i

.n,._

, -, ~,