Dunn Powen Go>mm 18.0. ISOX 331(lO CIEAltLOTTE. N.C. 28242 retmenoxx HAL II. TUCKER (704) 373-4S31 vtt F PAFSIDFWT met iF AR Pietapt CTIO!.
October 13, 1986 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.
20555 ATTENTION:
B.J. Youngblood, Director PWR Project Directorate #4
Subject:
McGuire Nuclear Station Docket Nos. 50-369 and 50-370 Proposed Technical Specification Changes Reload Fuel Enrichment Upgrade
Dear Mr. Denton:
Attached are proposed license amendments (pursuant to 10CFR50.90) to facility operating licenses NPF-9 and NPF-17 for McGuire Nuclear Station Units 1 and 2, respectively. The proposed amendments seek to allow use of higher enrichment (up to 4.0 w/o U-235) fuel for future core reloads on both units. contains the proposed Technical Specification changes, and Attachment 2 discusses the Justification and Safety Analysis to support the proposed changes.
Included in Attachment 2 is A) New Fuel Vault Criticality Analysis Summary.
Pursuant to 10CFR50.91, Attachment 3 provides an analysis performed in accordance with the standards contained in 10CFR5G.92 which concludes that the proposed amendments do not involve a significant hazards consideration, and Duke is forwarding a copy of this amendment request application and no significant hazards consideration analysis to the North Carolina Department of Human Resources. The proposed amendments have been reviewed and have been determined to have no adverse safety or environmental impact.
Pursuant to 10CFR170.3(y), 170.12(c), and 170.21, Duke Power proposes that this application contains license amendments for McGuire Units 1 and 2 subject to fees based on the full cost of the review (to be calculated using the applicable professional staff rates shown in 10CFR170.20) and must be accompanied by an application fee of $150.00, with the NRC to bill Duke Power at six-month intervals for all accumulated costs for the application or when review is completed, whichever is earlier. Accordingly, please find enclosed a check in the amount of
$150.00.
h 40 I
gM "fo8M SU8$r
?,f
it f
Harold R. Denton October 13, 1986 Page 2 It is requested that the proposed amendments receive timely review and approval in view of currently planned reload designs / schedules.
This technical specification change is desired for the receipt of McGuire Unit 1 Batch 7 fuel (for the McGuire 1/ Cycle 5 reload) which will have assemblies enriched to greater than the current limits. The Batch 7 assemblies should start arriving on April 1,1987.
Fu ture Unit 2 reloads are also anticipated to use fuel enriched to greater than the current limits (although this will not be the case for Unit 2/ Cycle 4).
The McGuire FSAR will be appropriately revised to reflect this enrichment upgrade in the applicable annual FSAR update following approval. Should there be any questions in this matter or if additional information is required, please advise.
Very truly yours, c
_ gk
/
Hal B. Tucker PBN/34/jgm Attachments Enclosure xc: w/ attachments Dr. J. Nelson Grace Mr. Dayne Browne, Chief Regional Administrator Radiation Protection Branch U.S. Nuclear Regulatory Commission Div. of Facility Services 101 Marietta Street, NW, Suite 2,J0 Dept. of Human Resources Atlanta, Georgia 30323 P.O. Box 12200 Raleigh, North Carolina 27605 Mr. Darl Hood, Project Manager Office of Nuclear Reactor Regulation Mr. W.T. Orders U.S. Nuclear Regulatory Commission NRC Resident Inspector Washington, D.C.
20555 McGuire Nuclear Station
Mr. Harold R. Denton, Director October 13, 1986 Page 3 HAL B. TUCKER, being duly sworn, states that he is Vice President of Duke Power Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission this revision to the McGuire Nuclear Station License Nos. NPF-9 and NPF-17 and that all statements and matters set forth therein are true and correct to the best of his knowledge.
'H l B. Tucker, Vice President a
Subscribed and sworn to before me this 13th day of October 1986.
w }
o"'L. "Kt J
g',,...".."'.
.'s 4
tiry Public W ' f j
p 9y My Commission Expires:
[g ** g 0 T A r, y *g Ee.
~
i a.; =
_b4
,/
"4MQ7g;ffy M
- O e e still a
to y
-r._,
+..,_m.
O PROPOSED McGUIRE UNIT 1 AND 2 TECHNICAL SPECIFICATION CifANGES O
_ _ _ _ - _