Forwards Insp Repts 50-498/87-36 & 50-499/87-36 on 870518-22.No Violations Noted.Unresolved Items Identified Should Be Reviewed
ML20215J175
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 06/16/1987
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20215J177 List:
References
IEIN-86-053, IEIN-86-53, NUDOCS 8706240348
Download: ML20215J175 (2)


See also: IR 05000498/1987036

Text

-

-_

_ _ _ _ _ - -.

-__ ___ _ - _ - _ - _ - _ _ _ _ - _ - -

-..

.

' <JUN 161967

s

,.

,

ts

'I'n Reply Refer To: .

Dockets: ' .50-498/87-36

' -

.50-499/87-36.

Houston Lighting & Power company

ATTN:. J. H. Goldberg, Group Vice

.

President,. Nuclear

4

'

P. O. Box 1700

Houston, Texas

77001-

i

Gentlemen:

This r'efers to the inspection conducted by Mr. D. E. Norman 'of this office

,

'during the period.May 18-22, 1987,- ofl activities authorized by NRC Construction"

q

. Permits CPPR-128 and CPPR-129 for the South Texas Project, Units 1 and.2, and

,

.to the discussion'of'our findings with members of your staff at.the conclusion-

l

of the inspection.

d

. Areas' examined during the inspection included your program for inspection and

rework of electrical splices using Raychem heat shrinkable. tubing.

The'

. inspection included your action relative to IE Information Notice 86-53

L(improper installation of heat shrinkable tubing)','previously. identified NRC

1

findings, and your 10 CFR 50.55(e)' identified by Incident Review Committee (IRC)

j

number 364.

j

,

l

Within these areas, the inspection consisted of selective examination of

I

procedures and representative records, interviews with personnel, and

-observations by'the NRC inspector.

The inspection findings are documented in-

.the-enclosed-inspection report.

3

!

Within the scope of the inspection,.no violations or deviations were

' identified.

Two unresolved items are identified in paragraphs 2.a.(3)(a) and 2.a(3)(b) of

'the enclosed report.

You should review these: items so that followup NRC review

i

'can be done in the near future.

Should you have any. questions concerning this inspection, we will be pleased to

l discuss them with you.

Sincerely,

,

l'

m.o onai tened t:n

n.c.HAus

t[J. E. Gagliardo, Chief

,

i

l

\\

Reactor Projects Branch

!

\\

>

I

-Enclosu e p next page)

j

RIV:

C:ES k

C: PB

C: RSB

C:

B

\\

]p(pl Norman /dp

E

lREIreland

GL

stable

TFWester n

pEGagliardo

0

p^

>

g2 /87

4 //i/87

(,/I)/87

4 ll2./87

/

4 g /87

'

8706240348 870616

.~

l

PDR

ADOCK 05000498

G

PDR

1

- _ _ _ _ _ _ _ _ _ _

",

a ,-

1-

.

^f6

-

s

,

n

,

t

i

.;

i 4 .. , ..

o

-

k.

'

,

o

3

.

,

-Houston Lighting and Power Company

-2--

,,

f

,

^

'

! Enclosure": .

<

.

.*

.-Appe'ndix - NRC" Inspection Report-

'

S0-498/87-36

50-499/87j36

cc w/ enclosure:

-Houston Lighting & Power Company _

IATTN:

M. Wisenberg, Manager,

i

Nuclear Licensing

"

P. D. Box 1700

,

"

. Houston,_ Texas" '77001'

1

Houston Lighting & Power Company

LATTN:

Gerald E.-Vaughn, Vice President

i

<

- Nuclear Operations

_

.

Pis0. Box'1700

3

Houston, Texas

77001'

'

,-Texas Radiation Control Program Director

bcic' to DMB (IE01)-

' bec distrib. by RIV:

. DRSP

-

_

  • RPB-

'

  • RRI-0PS

R. D. Martin, RA

. .-

  • RRI-CONST.
  • Section Chief (RPB/C)

.RPSB

  • MIS System
  • RIV: File
  • D. Weiss, RM/ALF
  • RSTS Operator

R. Pirfo, OGC

  • R . G .1 Taylor,-RPB/C
  • RSB

-

  • Project' Inspector,RPB
  • R. Hall

r

NRR Project Manager

  • Section Chief (RSB/ES)
  • D.

Norman-

  • w/766

l

>

!

.

,

7

>

e.

~c

.

-

.l

'

l