Forwards Safety Insp Repts 50-456/87-07 & 50-457/87-06 on 870215-0411 & Notice of Violation.Nrc Understanding of Corrective Actions Taken Re Item a in Notice of Violation Described in Rept
ML20215H815
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 04/29/1987
From: Little W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20215H818 List:
References
NUDOCS 8705070075
Download: ML20215H815 (2)


See also: IR 05000456/1987007

Text

I

b& b

~

t

.

.

,

taf*o9;E

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Messrs.

T. M. Tongue, W. J. Kropp, and T. E. Taylor of this office and

Messrs. K. Phillips, J. B. Moncur, and R. Storck of EG&G Idaho, Inc.

on February 15 through April 11, 1987, of activities at the Braidwood

Station, Units 1 and 2, authorized by NRC Operating Permit No. NPF-59

and Construction Permit No. CPPR-133 and to the discussion of our

findings with Mr. K. Kofron and others of your staff at the conclusion

of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as described in the enclosed Notice.

With respect to

Item a. the inspection showed that action had been taken to correct the

identified violation and to prevent recurrence.

Our understanding of your

corrective actions are described in Paragraph 2.b of the enclosed inspection

report.

Consequently, no reply to the violation is required and we have no

further questions regarding this matter at this time.

Regarding the remaining items, a written response is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC's Public Document Room.

The responses directed by this letter and the accompanying Notice are not

subject to the clearance procedures of the Office of Management and Budget

as required by the Paperwork Reduction Act of 1980, PL 96-511.

%

8705070075 870429

3 [g /

DR

ADOCK 0500

6

'

. . .

. , -

4

'APR 2 91987

' Commonwealth Edison Company

2

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

William S. Little, Director

Braidwood Project

Enclosures:

1.

Appendix, Notice of

Violation

2.

Inspection Reports

No.-50-456/87007(DRP);

No. 50-457/87006(DRP)

.

cc w/ enclosures:

D. L. Farrar,-Director

of Nuclear Licensing

M. Walla'ce, Project Manager

W.'Vahle, Construction

Superintendent

E. E. Fitzpatrick, Station

Manager

P. L. Barnes, Regulatory.

DCS/RSB (RIDS)pervisor

Assurance Su

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector,.RIII Byron

D. W. Cassel, Jr., Esq.

Richard Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, OGC

J. Moore, OGC

G. Berry, OGC

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

RIII

RII

J

g

l

e

e

/ jaw

Holmes

Li

Rft41

-.

._- _

-

.