ML20215H468
| ML20215H468 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 04/15/1987 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Trevors G NEBRASKA PUBLIC POWER DISTRICT |
| References | |
| NUDOCS 8704200332 | |
| Download: ML20215H468 (2) | |
Text
'
APR I 51987 SAFEGUARDS INFORMAT10N c
- 8 Nebraska Public Power District ATTN:
George A. Trevors Division Manager - Nuclear Support P. O. Box 499 Columbus, NE 68601
Dear Mr. Trevors:
This is in response to your letter of December 5,1986, regarding changes to the Cooper Nuclear Station Physical Security Plan.
We have reviewed the information contained in the security plan revision and have determined that portions of that plan are consistent with the provisions of 10 CFR 50.54(p) and are therefore acceptable.
However, as indicated in the attachment, certain other portions decrease plan effectiveness and are therefore inconsistent with the provisions of 50.54(p).
Accordingly, you are to follow your previously approved plan in regard to these items.
Resubmit corrected plan pages as necessary to maintain plan continuity.
Should you want to pursue changing the security plan with respect to the changes set forth in the attachment, you should resubmit under the provisions of 10 CFR 50.90.
The material enclosed contains Safeguards Information as defined by 10 CFR 73.21 and its disclosure to unauthorized individuals is prohibited by Section 147 of the Atomic Energy Act of 1954, as amended.
Therefore, the enclosed Safeguards Attachment will not be placed in the Public Document Room.
If you have any questions concerning this matter, please contact A. B. Earnest at (817) 860-8146.
Sincerely, ORIGINAL SIGNED BY:
J. E. Gagliardo, Chief Reactor Projects Branch
Attachment:
As stated cc w/o attachment:
(see next page)
RIV PS C:EP&S S C: R&SP
. P /A C:RPB
&/13/f7[rdo- )h JEGagli,a AB e
tw LAYan WLFisher J audon
.5/9987 b h,/87 y/W/87 i /rf'/87 Casework Number:
50-298/12-XA ENCtOSURE CONTAINS SAFEGUARDS INFORMATION.
I UPON SEPARATION THIS CNcilARM lilFORMATION.
excE is occOmRotteo*
8704200332 870415 4
DR ADOCK 05000290 PDR
LNebraska Public Power District cc w/o attachment:
y Guy Horn, Division Manager.
of Nuclear Operations Cooper Nuclear Station P. O. Box 98 Brownville, Nebraska 68321 Kansas Radiation Control Program Director Nebraska Radiation Control Program Director bcc w/ copy of licensee's response w/ safeguards:
RIV Security File P..A. Starchcr, RSGB/NRR Resident Inspector R. D. Martin, RA R. L. Bangart, DRS&S Security Inspector Chief, EP&SPS bec w/ copy of licensee's response w/o safeguards:
-DMB RG01 RPB D. Weiss, RM/ALF Section Chief (RPB/A)
RIV File MIS RITS Operator W. L. Fisher, R&SPB R&SPB E. H. Johnson, DRS63 R. E. Hall, DRS&P Project Inspector, RPB 50.54(p) Book ENCLOSURE CONTAINS SAFEGUARDS INFORMATION.
UPON SEPARATION THIS PAGE IS DECONTROLLED.
i
,.4.
Nebraska Public Power District
"'" *h$h55bb$f!!b CNSS864460 December 5, 1986 RDSIhogffON Mr. Robert D. Martin Regional Administrator k@$@@h U.S. Nuc1 car Pegulatory Commission Region IV 611 Ryan Plaza Drive DEC 2 2 l986 Suite 1000
.)
Arlington, Texas 76011 s
Subject:
Cooper Nuclear Station Safeguards Plan; Report of Change-Revision Number Seventeen
Dear Mr. Martin:
Changes to the Physical Security Plan and Contingency Plan (Volumes I and II of the Safeguards Plan) are being submittad to reflect recent changes at.
Cooper Nuclear Station. These changes include organizational restructuring, clarification of Quality Assurance Auditing requirements and the availability of on duty armed guard personnel. These changes are annotated by sidebars.
Accordingly, Nebraska Public Power District is submitting, in accordance with the provisions of 10CFR Part 50.54(p), a Report of Change to the Cooper Nuclear Station Safeguards Plan, Revision Sixteen. Upon incorporation of this change, the current Safeguards Plan becomes Revision Seventeen. We believe the enclosed change does not decrease the safeguards effectiveness of the plan.
The material enclosed herewith contains Safeguards Information as defined by 10CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited. Therefore, we request the material, with the exception of j
the cover letter, to be withheld from public disclosure.
l
/>
L. G. Kunci Vice President - Nuclear LGK:HTH:bs
\\
D M 0II p g N D
M When separated from Exlosures, i
Handle this Doniment as Decont l
December 5, 1986 ApACHMENT SAFEGu g [
hr. Robert D. Martin IN Page 2
Enclosures:
(6 copies of Plan, Volume I and Volume II title pages; pages 1, 8, and 53, Attachment A, page 1 of 1 of Volume I; page 28 of Volume II.
cc: Director Office of Nuclear Reactor Regulation Attention: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555 w/o encl.
5 t
l 2
I s
l l
- atammta
_