Forwards Engineering Rept ERPT-E0214, Electrical Termination Insp & Upgrade Program Resulting from 851226 Integrated Control Sys Power Failure
ML20215H456
Person / Time
Site: Rancho Seco
Issue date: 06/17/1987
From: Andognini G
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Miraglia F
NRC
Shared Package
ML20215H460 List:
References
GCA-87-094, GCA-87-94, NUDOCS 8706240108
Download: ML20215H456 (2)


Text

,

e -

t (g;SMUD SACRAMENTO MUNICIPAL UTILITY DISTRICT C P. O. Box 15830, Sacramento CA 95852-1830,(916) 452 3211 AN ELECTRIC SYSTEM SERVING THE iiEART OF CALIFORNIA GCA 87-094

.JUN 171987 U. S. Nuclear Regulatory Commission Attn:

Frank J. Miraglia, Jr.

Associate Director for Projects Philips Building 7920 Norfolk Avenue Bethesda, MD 20014 DOCKET 50-312 RANCHO SECO NUCLEAR GENERATING STATION UNIT 1 LICENSE NO. DPR-54 ELECTRICAL TERMINATION INSPECTION PROGRAM FINAL REPORT An Electrical Termination Inspection Program was initiated as a result of i

the December 26, 1985 trip in which a faulty compression lug termination caused the loss of the Integrated Control System (ICS) control power.

This program was implemented to provide assurance that potential lug failures were identified and corrected. As a result of this program over 44,000 terminations have been subjected to inspection.

The attached report provides the results of the work performed under the Electrical Termination Inspection Program.

If there are any questions, please contact John Atwell at Rancho Seco extension 3906.

Sincerely, f /$

PN G. Carl'Ando 'ini Chief Executive Officer, Nuclear cc w/atch:

G. Kalman, NRC, Bethesda (2)

A. D'Angelo, NRC, Rancho Seco 8706240100 870617 h

PDR ADOCK 05000312 l

l G

PDR RANCt:0 SECO NUCLEAR GENERATING ST ATioN O 1444o Twin Cities Road, Herald, CA 95638 9'/99;(2o9) 333 2935

l C

41

'(

)

2 1

i i

i I

ATTACHMENT Electrical Termination Inspection Program Final Report I

i i

l

-