ML20215H244
| ML20215H244 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 04/15/1987 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20215H248 | List: |
| References | |
| NUDOCS 8704200223 | |
| Download: ML20215H244 (2) | |
See also: IR 05000498/1986038
Text
F
M
APR 151987
In Reply Refer To:
Dockets:
50-498/86-38
50-499/86-38
Houston Lighting & Power Company
'
ATTN:
J. H. Goldberg, Group Vice
President, Nuclear
P.:0. Box 1700
Houston, Texas
77001
Gentlemen:
This refers to the inspection conducted by Mr. R. G. Taylor, other members of
the NRC staff, and NRC consultants during the period November 17, 1986, through
January 30, 1987, of activities authorized by NRC Construction Permits CPPR-128
,
l
and CPPR-129 for the South Texas Project, Units 1 and 2, and to the discussion
of our findings with Mr. S. M. Head and other members of your staff during the
course of the inspection.
Areas examined during the inspection included licensee actions on previous
<
!
inspections findings, review of licensee actions in regard to IE Bulletins and
l
Circulars, followup on licensee reported significant construction deficiencies,
l
inspection of electrical components, and followup on allegations. Within these
areas, the inspection consisted of selective examination of procedures and
l
representative records, interviews with personnel, and observations by the NRC
'
inspectors and NRC consultants.
The inspection findings are documented in the
enclosed inspection report.
Within the scope of the inspection, no violations or deviations were
j
identified.
As noted above, we have examined actions you have taken with regard to
previously identified inspection findings. The status of these items is
identified in paragraph 2 of the enclosed report.
Should you have any questions concerning this inspection, we will be pleased to
j
discuss them with you,
f
'
Sincerely,
l'
l
Ortsinal Slaned By
M. E. Gog!!ardo
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosure:
(see next page)
Y
I
RP h
C WS C
AC \\
RIV: k
/
C:RPB
RGTaylor;df DLKellep
dNeill
G tinlitable MEEmerson
JEGag f/rdo
k/)/M
\\
3 /X /87
3 /p /87
./,%/87
J/d./87
6/Q/87
t
0
l
4
8704200223 870415
/'l
ADOCK 0D000498
G
png
!
-
-
_
-
,
,
I
) O
Houston Lighting & Power Company
-2-
Enclosure:
Appendix - NRC Inspection Report
50-498/86-38
50-499/86-38
cc w/ enclosure:
Houston Lighting & Power Company
ATTN:
M. Wisenberg, Manager,
Nuclear Licensing
P. O. Box 1700
Houston, Texas
77001
Texas Radiation Control Program Director
bec to DMB (IEul)
bcc distrib. by RIV:
- RPB
DRSP
- RRI-0PS
R. D. Martin, RA
- RRI-CONST.
- Section Chief (RPB/C)
- R&SPB
- MIS System
- RIV File
- D. Weiss, RM/ALF
- RSTS Operator
R. Pirfo, ELD
- R. G. Taylor, RPB/C
- RSB
- Project Inspector
- R. Hall
M. Emerson
- W. McNeill
- w/766
-
- -
- - -
- -
-
-
-
-
-
-
-
-
-