MONTHYEARHL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5493, Monthly Operating Repts for Sept 1997 for Ei Hatch Nuclear Plant1997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Ei Hatch Nuclear Plant HL-5475, Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5447, Monthly Operating Repts for July 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-07-31031 July 1997 Monthly Operating Repts for July 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 HL-5416, Monthly Operating Repts for May 1997 for Ei Hatch Nuclear Plant Units 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5393, Monthly Operating Repts for Apr 1997 for Ei Hatch Nuclear Plant Units 1 & 21997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5364, Monthly Operating Repts for Mar 1997 for Ei Hatch Npp,Units 1 & 21997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Ei Hatch Npp,Units 1 & 2 HL-5332, Monthly Operating Repts for Feb 1997 for Ei Hatch Nuclear Plant1997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Ei Hatch Nuclear Plant HL-5314, Monthly Operating Repts for Jan 1997 for Ei Hatch Nuclear Plant1997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Ei Hatch Nuclear Plant HL-5296, Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 21996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5283, Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 21996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Edwin I Hatch Nuclear Plant,Unit 1 & 2 HL-5265, Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5249, Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 21996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Ei Hatch Nuclear Plant Unit 1 & 2 HL-5237, Monthly Operating Repts for Aug 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Ei Hatch Nuclear Plant Units 1 & 2 ML20116J3821996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Ei Hatch Nuclear Plant Units 1 & 2 HL-5202, Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 21996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Ei Hatch Nuclear Plant Units 1 & 2 ML20112J0661996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Ehnp ML20116J3971996-05-31031 May 1996 Revised MOR for May 1996 for Ei Hatch Nuclear Plant Unit 1 ML20112J0691996-04-30030 April 1996 Revised MOR for April 1996 for Ei Hatch Nuclear Plant ML20116J3901996-04-30030 April 1996 Revised MOR for April 1996 for Ei Hatch Nuclear Plant Unit 1 ML20111B0061996-04-30030 April 1996 Monthly Operating Repts for April 1996 for Ei Hatch Nuclear Plant HL-5144, Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant1996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Ei Hatch Nuclear Plant ML20111B0131996-03-31031 March 1996 Revised Pages E2-4 for March 1996 for Ei Hatch Nuclear Plant Unit 2 ML20101B1911996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5111, Monthly Operating Repts for Jan 1996 for Ei Hatch Nuclear Plant1996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Ei Hatch Nuclear Plant ML20101B2001996-01-31031 January 1996 Revised Page E1-2 for Monthly Operating Rept for Jan 1996 for Ei Hatch Unit 1 HL-5098, Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant1995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Ei Hatch Nuclear Plant HL-5085, Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant1995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Ei Hatch Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217D3061999-10-13013 October 1999 SER Accepting Licensee Proposed Changes to Edwin I Hatch Nuclear Plant Emergency Classification Scheme to Add Emergency Action Levels Related to Operation of Independent Spent Fuel Storage Installation HL-5845, Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Ei Hatch Nuclear Plant.With ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20212A6641999-09-13013 September 1999 Safety Evaluation Authorizing Relief Request RR-V-16 for Third 10 Yr Interval Inservice Testing Program HL-5836, Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Edwin I Hatch Nuclear Plant.With ML20210J9631999-08-0202 August 1999 SER Finding That Licensee Established Acceptable Program to Verify Periodically design-basis Capability of safety-related MOVs at Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20210J9271999-08-0202 August 1999 SER Finds That Licensee Performed Appropriate Evaluations of Operational Configurations of safety-related power-operated Gate Valves to Identify Valves at Plant,Susceptible to Pressure Locking or Thermal Binding HL-5818, Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5805, Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207E7631999-06-0303 June 1999 Safety Evaluation Concluding That Licensee Proposed Alternative to Use Code Case N-509 Contained in RR-4 Provides Acceptable Level of Quality & Safety.Considers Rev 2 to RR-4 & RR-6 Acceptable HL-5795, Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Ehnp Units 1 & 2. with ML20206G1691999-05-0404 May 1999 SER Approving Requirements of Istb 4.6.2(b) Pursuant to 10CFR50.55a(a)(3)(ii) HL-5784, Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5766, Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20207M1891999-03-11011 March 1999 SER Accepting Relief Request for Authorization of Alternative Reactor Pressure Vessel Exam for Circumferential Weld HL-5755, Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20206P6981999-01-0707 January 1999 Ehnp Intake Structure Licensing Rept HL-5726, Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20196J4931998-12-0707 December 1998 Safety Evaluation Accepting Proposed Alternatives in Relief Requests RR-V-12,RR-V-15,RR-P-15,RR-V-7,RR-V-12,RR-V-14 & RR-V-15 HL-5714, Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With HL-5706, Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Hatch Nuclear Plant Units 1 & 2.With ML20155B6121998-10-28028 October 1998 Safety Evaluation of TR SNCH-9501, BWR Steady State & Transient Analysis Methods Benchmarking Topical Rept. Rept Acceptable HL-5691, Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Ei Hatch Nuclear Plant,Units 1 & 2.With ML20153G2481998-09-24024 September 1998 SE Concluding That Licensee Implementation Program to Resolve USI A-46 at Plant Adequately Addressed Purpose of 10CFR50.54(f) Request ML20239A2531998-09-0303 September 1998 SER Accepting Licensee Request for Relief Numbers RR-17 & RR-18 for Edwin I Hatch Nuclear Plant,Units 1 & 2.Technical Ltr Rept on Third 10-year Interval ISI Request for Reliefs for Plant,Units 1 & 2 Encl HL-5675, Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20238F7131998-08-31031 August 1998 9,change 2 to QAP 1.0, Organization HL-5667, Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5657, Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures1998-07-30030 July 1998 Ro:On 980626,noted That Pami Channels Had Been Inoperable for More than Thirty Days.Cause Indeterminate.Licensee Will Replace Automatic Function W/Five Other Qualified Pamis of Like Kind in Drywell & Revised Procedures ML20236W3441998-07-30030 July 1998 Safety Evaluation Accepting Relief Requests for Second 10-yr ISI for Plant,Units 1 & 2 ML20236V5191998-07-28028 July 1998 Safety Evaluation Accepting Proposed License Amend Power Uprate Review ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps ML20236L1821998-07-0707 July 1998 Safety Evaluation Accepting 980428 Proposed Alternative to ASME Boiler & Pressure Vessel Code,Section Xi,Repair & Replacement Requirements Under 10CFR50.55a(a)(3) HL-5653, Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5640, Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20248B8651998-05-15015 May 1998 Quadrennial Simulator Certification Rept HL-5628, Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant1998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Ei Hatch Nuclear Plant HL-5604, Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 21998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20216B2711998-02-28028 February 1998 Extended Power Uprate Safety Analysis Rept for Ei Hatch Plant,Units 1 & 2 HL-5585, Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5571, Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 11998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Edwin I Hatch Nuclear Plant,Unit 1 HL-5551, Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 ML20199B0561997-12-31031 December 1997 Rev 0 GE-NE-B13-01869-122, Jet Pump Riser Weld Flaw Evaluation Handbook for Hatch Unit 1 HL-5581, Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 21997-12-31031 December 1997 Annual Operating Rept for 1997, for Ei Hatch Nuclear Plant Units 1 & 2 HL-5533, Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 21997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Ei Hatch Nuclear Plant,Units 1 & 2 HL-5514, Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Edwin I Hatch Nuclear Plant,Units 1 & 2 ML20212A1981997-10-16016 October 1997 Safety Evaluation Denying Licensee Request for Relief from Implementation of 10CFR50.55a Requirements Re Use of 1992 Edition of ASME Code Section XI for ISI of Containments ML20211M6491997-10-0808 October 1997 Addenda 1 to Part 21 Rept Re Weldments on Opposed Piston & Coltec-Pielstick Emergency stand-by Diesel gen-set lube-oil & Jacket Water Piping Sys.Revised List of Potentially Affected Utils to Include Asterisked Utils,Submitted ML20211H5311997-10-0101 October 1997 Rev 2 to Unit 1,Cycle 17 Colr ML20211H5251997-10-0101 October 1997 Rev 3 to Unit 1,Cycle 17 Colr 1999-09-30
[Table view] |
Text
?'
OPERATING DATA REPORT DOCVET NO. 50-321 DATE: APRIL 2, 1987 COMPLETED BY: J. H. RICHARDSON TELEPHONE: (912) 367-7781 x2878 OPERATING STATUS
- 1. UNIT NAME: E. I. HATCH UNIT 1
- 2. REPORT PERIOD: Mar-87
- 3. LICENSED THERMAL POWER (MWt): 2436
- 4. NAMEPLATE RATING (GROSS MWe): 850
- 5. DESIGN ELECTRICAL RATING (NET MWe): 776.3
~6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe): 783
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe): 750
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: NO CHANGES 9 POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWe): NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION, IF ANY: N/A THIS MONTH YR. TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD
- 744 2160 98591
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL: 744.0 2135.8 69783.3
- 13. REACTOR RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0 14 HOURS GENERATOR ON-LINE: 744.0 2093.4 65818.0
- 15. UNIT RESERVE SHUTDOWN HOURS: 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH): 1762080 4750674 141231585 17 GROSS ELEC. ENERGY GENERATED (MWH): 574940 1550300 45617650
- 18. NET ELEC. ENERGY GENERATED (MWH): 550955 1484243 43327153
- 19. UNIT SERVICE FACTOR: 100.0% C 6. 9'/. 66.8%
- 20. UNIT AVAILABILITY FACTOR: 100.0% 96.9% co.8%
- 21. UNIT CAPACITY FACTOR (USING MDC NET): 98.7% 91.6% 58.6%
- 22. UNIT CAPACITY FACTOR (USING DER NET): 95.4% 88.5% 56.2%
- 23. UNIT FORCED OUTAGE RATE: 0.0% 3.1% lo.1%
24 SHUTDOWNS SCHEDULED OVER THE NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
REFUELING OUTAGE, APRIL 22, 1987 45-60 DAYS
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
- 26. UNITS IN TEST STATUS ( PRIOR TO COMMERCIAL OPERATION): N/A 8704200222 870331 PDR R
ADOCK 05000321 PDR
[- '
El-2
e
. l D
UNIT 1 AVERAGE DAILY DOCKET NO. 50-321 i POWER LEVEL DATE: APRIL 2, 1987 COMPLETED BV: J. H. RICHARDSON TELEPHONE: (912) 367-7781 x2878 !
l DAY Net MW 1 ......... 761 2 ......... 762 3 ......... 764 4 ......... 764 5 ......... 764 6 ......... 764 7 ......... 577 8 ......... 743 9 ......... 758 10 ......... 761 11 ......... 760 12 ......... 765 13 ......... 765 14 ......... 762 15 ......... 762 16 ......... 760 17 ......... 760 18 ......... 759 19 ......... 755 20 ......... 759 21 ......... 752 22 ......... 759 23 ......... 757 24 ......... 754 25 ......... 749 26 ......... 754 27 ......... 747 28 ......... 520 29 ......... 658 30 ......... 718 31 ......... 760 El-3
e UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-321 DATE: APRIL 2, 1987 UNIT NAME: E.I. HATCH 1 COMPLETED BY: J.H. RICHARDSON TELEFHONE: (912) 067-7781 (2878)
REPORT MONTH MARCH 1987
! E : E I ! Y : : :
I i 1 1
! A : T lLICENSEEl SC : : :
I I : T I I I l Y : S ! H I EVENT I TO : : CAUSE & CORRECTIVE :
! ! 1 P IDURATIONI O I O I REPORT I E D ! COMPONENT! ACTION TO I l NO. I DATE : E 1(HOURS) i N : D 1 NUMBER ME: CODE : PREVENT RECURRENCE 1 1 : 1 : I ! ! _! I _. . _
l57-007 1870307: F ! O.0 l A : 5 N/A HF : INSTRU "A' Circulating Water Pump 1 I I i 1 : I : : trip. See narrative report, i t i I I ! I : page El-1.
1 i ! ! ! I : I 187-008 18703271 S : 0.0 1 B ! 5 : N/A : RC CONROD : Control rod pattern exchange.:
- i t i : 1 :
1 I I I I i I t : :
-l i I I 1 1 : : :
1 I ! ! : : : 1 I :
I : ! ! ! : 1 ! !
- 1
- I ! ! ! : :
- I
! ! I I ! ! ! ! !
- I : l l !
I : 1 I : : 1
! I ! ! ! I I ! ! ! ! ! : : I
! ! ! : : i i ! :
1 1 I I I ! ! : :
1 I I : : : ! 1 l l ! :
-l I I I 1 I i ! i : :
.I ! ! I I I ! ! 1 I I ! ! ! ! l l t :
1 1 I i l l I i ! I' !
! : i I 1 I I 1 1 l_. _t ! _
.I___ ___: _ ____: __a______ _ _
F: FORCED REASON: METHOD: EVENTS REPORTED INVOLVE
-5: SCHEDULED A-EOUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20*/.
B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 3 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTRICTION 4 - CONTINUATIONS THE PRECEEDING 24 HOURS.
E-OPERATOR TRAINING & LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE o - OTHER (EXPLAIN)
G-OPERATIONAL ERROR (EXPLAIN)
H-0THER (EXPLAIN)
El-4 L
e NARRATIVE REPORT DOCKET NO. 50-366 UNIT 2 DATE: APRIL 2, 1987 COMPLETED BY: J.H. RICHARDSON TELEPHONE: (912) 067-7701 (2878)
'Mrech 1 0000 Reducing load to approximately 750 MWe for performance of weekly turbine valve / auxiliaries testing and control red exercise.
M:rch 1 0155 Unit returned to MDC.
March 7 0000 Reducing load to approximately 650 MWe for performance of weekly turbine valve / auxiliaries testing and rod pattern exchange.
March 8 0520 Unit returned to MDC.
M:rch 15 0002 Reducing load to approximately 720 MWe for performance of weekly turbine valve / auxiliaries testing and control rod enercise.
Mirch 15 0255 Unit returned to MDC.
MIrch 22 0021 Reducing load to approximately 760 MWe fer performance of ,
weekly turbine valve / auxiliaries testing and control rod exercise.
Mrrch 22 0104 Unit returned to MDC.
M rch 29 0220 Reducing load to approximately 740 MWe for performance of weekly turbine valve / auxiliaries testing and control rod exercise.
March 29 0500 Unit returned to MDC.
M:rch 31 2400 Unit operating at 100% power with no operational problems.
1 E2-1 i
I f
.1
a-i hF e
OPERATING DATA REPORT DOCI:ET NO. 50-366 DATE: APRIL 2, 1987 COMPLETED BY: J. H. RICHARDSON TELEPHONE: (912) 067-7781 x2878 OPERATING STATUS:
- 1. UNIT NAME: E. I.' HATCH UNIT 2
- 2. REPORTING PERIOD: Mar-87 2436
- 3. LICENSED THERMAL POWER (MWt):
- 4. NAMEPLATE RATING (GROSS MWe): 850 784
- 5. DESIGN ELECTRICAL RATING (NET MWe): 794
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe):
761
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe):
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:. NO CHANGES
- 9. POWER LEVEL TO WHICH RESRTICTED, IF ANY (NET MWe): NO RESTRICTIONS
- 10. REASONS FOR RESTRICTION, IF ANY: N/A THIS MONTH YR-TO-DATE CUMULATIVE 744 2160 66217
- 11. HOURS IN REPORTING PERIOD: 2141.1 46164.4
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL: 744.0 0.0 0.0 0.0
- 13. REACTOR RESERVE SHUTDOWN HOURS: 44168.5 744.0 2128.7
- 14. HOURS GENERATOR ON LINE: O.O O.O
- 15. UNIT RESERVE SHUTDOWN HOURS: O.O 1799028 5009759 95199694
- 16. GROSS THERMAL ENERGY GENERATED (MWH): 1702590 31297800
- 17. GROSS ELEC. ENERGY GENERATED (MWH): 600490 575896 1632558 29782437
- 18. NET ELEC. ENERGY GENERATED (MWH): 98.5% 66.77.
- 19. UNIT SERVICE FACTOR: 100.0%
100.0% 98.5% 66.7%
- 20. UNIT AVAILABILITY FACTOR: 99.3% 58.9%
- 21. UNIT CAPACITY FACTOR (USING MDC NET): 101.7%
98.7% 96.4% 57.4%
- 22. UNIT CAPACITY FACTOR (USING DER NET): 1.5% 9.1%
- 23. UNIT FORCED OUTAGE RATE: 0.0%
24 SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE, AND DURATION OF EACH): N/A
- 23. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A N/A
- 20. UNITS IN TEST STATUS ( PRIOR TO COMMERCIAL OPERATION ):
E2-2 l
l
1 i
4-t 9
- t. ,
1
.- /.
.t: 6 1
i UNIT 2 AVERAGE DAILY DOCKET NO. <50-366 POWER LEVEL DATE: APRIL 2, 1987 COMPLETED BY: J. H. RICHARDSON TELEPHONE: (912) 367-7701 x2878
- i DAY Net MW 1 ......... 775 '
2 ......... 781 3 ......... 781 4 ......... 781 5 ......... 782 6 ......... 780 7 ......... 681 8 ......... 765
' 9 ......... 776 10 ......... 777 11 ......... 780 12 ......... 780 13 ......... 781 14 ......... 782 15 ......... 765 16 ......... 778 17 ......... 777 18 ......... 776 f 19 ......... 776 20 ......... 781 21 ......... 781 i 22 ......... 777 23 ......... 780 24 ......... 778 25 ......... 773 26 ......... 774 27 ......... 773 28 ......... 774 29 ......... 771 r 30 ......... 776 I
01 ......... 784 i
<3 E2-3 4
1
e n
).
a e
t-f.
/,
i' UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-366 DATE: , APRIL 2, 1987 UNIT NAME: E.I. HATCH 2 COMPLETED BY: J.H. RICHARDSON TELEPHONE: (912) 067-7781 (2878)
REPORT MONTH MARCH 1987 .
- ______ .: -- =
= _ - - - - -- . . _.
l' I I ! I EI E ! l Y l 1 I 1, I I ! 1 T 1 1 A I T ILICENSEEl SC i I I I Y ! I S 1 H I EVENT I TO 1 1 CAUSE & CORRECTIVE I I I I P IDURATIONI O l-O I REPORT I ED ICOMPONENTI ACTION TO !
I NO. I DATE I E I(HOURS) i N I D 1 NUMBER I ME I CODE I PREVENT RECURRENCE I l_______I _.i. -l _______3 __3-__! ! ! -
_I
! ! INo significant power !
I I I i 1 1 ! ,,
! ! ! ! ! reductions in March. !
! I I I !
! I 1 I !
I ! I 1 'l l 1 1
! I 1 1 I I l 1 l ! ! I I I 1 1 I I 1 i ! <l 1 ! I I I I I 1 l I ! I I i ! ! ! I I i !
! I I I l l I I 1
! ! I I I
! ! ! ! I I I I I I I ! 1 I i
~
! ! ! I ! ! I ! ! !
I I I ! I f
! I I I '
I I I l 'l 1 !
I I I I '
I I - ! I l ! 1 I I I I '
l ! !
I J l i I I I !
! ! ! I !
I I I i 1 1 i ! ! ! !
l ! I t I 1
! ! I I I I !
! I I I l l 1 I !
I I I I 1 1 .
I I I I I I I I I I 1
! ._!______I___l l it- 1 1 ! 'l_= -
___ ___ __ _ _ _ . _ __f F: FORCED REASON: METHOD: EVENTS REPORTED INVOLVE S: SCHEDULED A-EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL A GREATER THAN 20%
.B-MAINTENANCE OR TEST 2 - MANUAL SCRAM REDUCTION IN AVERAGE C-REFUELING 0 - AUTO. SCRAM DAILY POWER LEVEL FOR D-REGULATORY RESTPICTION 4 - CONTINUATIONS THE PRECEEDING 24 HOURS.
E-OPERATOR TRAINING L LICENSE 5 - LOAD REDUCTION F-ADMINISTRATIVE 9-- OTHER (EXPLAIN)
G-OPERATIONAL ERR 3R ,.(EXPLAIN)
H-OTHER (EXPLAIN) ,
I ,
? g
/
E2-4 6
Georgia Fbwer Company
, 333 Piedmont Avenue Atlanta, Georgia 30308 Telephone 404 526-6526 Mailing Address:
Post Office Box 4545 Atlanta, Georgia 30302 Georgia Power L T. Gucwa tre souttern sectnc system Manager Nuclear Safety and Ucensing .
SL-2304 0166C April 8,1987 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555
Dear Sir:
Enclosed is the Monthly Operating Report for Hatch Unit 1, Docket Number 50-321, and for Hatch Unit 2, Docket Number 50-366. This report is submitted pursuant to Technical Specifications Section 6.9.1.10.
Sincerely, f f:. _
L. T. Gucwa LGByrnes/lc Enclosure U. S. Nuclear Regulatory Commission c: Geors ia Power Company Dr. J. N. Grace, Regional Administrator Mr. s . P. O'Reilly Mr. P. Holmes-Ray, Senior Resident Mr. J. T. Beckham, Jr.
Mr. H. C. Nix, Jr. Inspector - Hatch Mr. G. Rivenbark, Hatch Licensing GO-NORMS Project Manager i
4 f
4 ij i
a
-e NARRATIVE REPORT DOCKET NO. 50-321 UNIT 1 DATE: APRIL 2, 1987 COMPLETED BY: J.H. RICHARDSON TELEPHONE: (912) 3e7-7781 (2878)
March 1 0000 Unit operating at 100% power with no operational problems.
March 7 0006 'A' Circulating Water Pump trip. Moisture in the discharge valve position limit switch caused an erroneous signal of discharge valve closure to be received by the pump trip logic, thus tripping the pump. Load reduced to 420 MW electric. (r ef . Event 57-007)
March 7 1604 'A' Circulating Water Pump ret'urned to service. Power ascension begun.
March 7 1649 Power ascension stopped for performance of Safety Relief Valve operability surveillance.
March 7 1724 SRV surveillance completed. Power ascension continued.
March 8 1810 Unit returned to Maximum Dependable Capacity (MDC).
March 14 0006 Reducing load to appro::imately 750 MWe to perform weekly turbine valve / auxiliaries testing.
March 14 0100 Unit returned to MDC.
March 27 2240 Reducing load to approximately 450 MWe to perform rod pattern exchange and scram time testing.
March 28 0827 Rod pattern exchange and scram time testing completed.
Power ascension begun.
March 31 0100 Unit returned to MDC.
March 31 2400 Unit operating at 100% power with no operational problems.