APH 131987
.
Docket No. 50-456
Docket No. 50-457
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the special safety inspection conducted by Mr. R. A. Westberg
of this office on July 29 through March 26, 1987, of activities at the
Braidwood Station, Units 1 and 2, authorized by NRC Operating Permit
No. NPF-59 and Construction Permit No. CPPR-133 and to the discussion of our
findings with Mr. E. E. Fitzpatrick and others of your staff at the conclusion
of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room,
'
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Original Signed by J. J. Harrison
J. J. Harrison, Chief
Engineering Branch
Enclosure:
Inspection Reports
No. 50-456/86041(DRS);
No. 50-457/86031(DRS)
See Attached Distribution
/
ic
TJ
RII
R I
RIII
RIII
RIk
n-
u)
ce<
(e
We t erg /nma
G
ner
Li ttle
H
ison
We 1
4 I3
Rac e / (1
&
,.smty)"
s};\\
f)63
iL3
4-
kR 42
56 87o4g3
G
CK 05000456
Ol
~~
l
,
,
,.
.
.
.- ---_-
'
)
Commonwealth Edison Company
2
APR 131987
Distribution
cc w/ enclosure:
D. L. Farrar, Director
of Nuclear Licensing
M. Wallace, Project Manager
W.~Vahle, Construction
Superintendent
E. E. Fitzpatrick, Station
Manager
P. L. Barnes, Regulatory
Assurance Su
DCS/RSB (RIDS)pervisor
Licensing Fee Management Branch
Resident Inspector, RIII
Braidwood
j
Resident Inspector, RIII Byron
D. W. Cassel, Jr., Esq.
Richard Hubbard
J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
Division
E. Chan, OGC
J. Moore, 0GC
G. Berry, 0GC
J. Stevens, NRR
The Honorable Herbert Grossman, ASLB
The Honorable A. Dixon Callihan, ASLB
The !!onorable Richard F. Cole, ASLB