ML20215H106

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-456/86-41 & 50-457/86-31 on 860729-870326.No Violations Noted
ML20215H106
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 04/13/1987
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20215H107 List:
References
NUDOCS 8704200056
Download: ML20215H106 (2)


See also: IR 05000456/1986041

Text

,

_ _ - _ .

1

.

J

APH 131987

.

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the special safety inspection conducted by Mr. R. A. Westberg

of this office on July 29 through March 26, 1987, of activities at the

Braidwood Station, Units 1 and 2, authorized by NRC Operating Permit

No. NPF-59 and Construction Permit No. CPPR-133 and to the discussion of our

findings with Mr. E. E. Fitzpatrick and others of your staff at the conclusion

of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room,

'

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Original Signed by J. J. Harrison

J. J. Harrison, Chief

Engineering Branch

Enclosure:

Inspection Reports

No. 50-456/86041(DRS);

No. 50-457/86031(DRS)

See Attached Distribution

/

ic

TJ

RII

R I

RIII

RIII

RIk

n-

u)

ce<

(e

We t erg /nma

G

ner

Li ttle

H

ison

We 1

4 I3

Rac e / (1

&

,.smty)"

s};\\

f)63

iL3

4-

kR 42

56 87o4g3

G

CK 05000456

Ol

~~

l

PDR

,

,

,.

.

.

.- ---_-

'

)

Commonwealth Edison Company

2

APR 131987

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

W.~Vahle, Construction

Superintendent

E. E. Fitzpatrick, Station

Manager

P. L. Barnes, Regulatory

Assurance Su

DCS/RSB (RIDS)pervisor

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

j

Resident Inspector, RIII Byron

D. W. Cassel, Jr., Esq.

Richard Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, OGC

J. Moore, 0GC

G. Berry, 0GC

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Callihan, ASLB

The !!onorable Richard F. Cole, ASLB

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _