Forwards Safety Insp Rept 50-423/86-27 on 860818-22.No Violations or Deviations Noted.Three Items Requiring Improvement Re NUREG-0737 Noted.Response Required within 30 Days
ML20215H051
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/15/1986
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Opeka J
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20215H054 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8610210393
Download: ML20215H051 (2)


See also: IR 05000423/1986027

Text

v ,

.

OCT 151986

Docket No. 50-423

Northeast Nuclear Energy Company

ATTN: Mr. J. F. Opeka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford,~ Connecticut 06141-0270

Gentlemen:

Subject: Inspection No.- 50-423/86-27

On August 18 - 22, 1986, an announced special safety inspection was conducted

by a team led by Ms. Marie Miller of our office at the Millstone Nuclear Power

Station, Unit 3, for the purpose of reviewing the licensee's implementation of

certain specifications of 'NUREG-0737, Clarification of TMI Action Plan Require-

ments, relative to post-accident sampling and monitoring. Our findings were

discussed with Mr. W. Romberg and others of your staff at the conclusion of the

inspection on August 22, 1986.

~

The areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

<

inspection consisted of selective examination of procedures and representative

records, interviews with personnel and observations by the-inspector.

Within the scope of this inspection, no violations or deviations were noted.

However, certain activities require improvement to be acceptable relative to

NUREG-0737. You are requested to review the three items identified in the

attached report and respond within 30 days of the date of this letter on

actions planned or taken in regard to these items .

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

Or4 inal Sisnod E7

/7 L

Thoma)sT.

7/W

Martin,Di ctor

h N ision of Radiation Safety-

and Safeguards

Enclosure: NRC Region I Inspection Report No. 50-423/86-27

1

' I

0FFICIAL RECORD COPY IR MILL 3 86-27 - 0001.0.0

i 10/08/86

~'

8610210393 861015

PDR [

0 ADOCK 05000423

PDR

- _ _ - . -. . -- , .-. . .

_ _ _ _ _ _ -

. ,

-

.heast Nuclear Energy Company 2

)

cc w/ enc 1:

V. Papadopoli, Construction Quality Assurance Supervisor

E. R. Foster,. Director of Generation Construction

E. J. Mroczka, Vice President, Nuclear Operations

D. 0. Nordquist, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

W. D. Romberg, Station Superintendent

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

State of Connecticut

bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

DRP Section Chief

L. Prividy, RI, BV-2

T. Rebelowski, SRI, Millstone 1&2

B. Doolittle, LPM, NRR

Robert J. Bores, DRSS

,

W11

RI:BRSS % RI:DRSS :DRS < RP

1

S

A44

RI: MSS

Veh

RI:DRSS

MMiller/klm Cioffi jb6c Pasc k Shanbaky Bellamy

I ,o

09/df/86 09/27/86 / /86 h0/@/86 8//N/86 @/if/86

0FFI IAL RECORD COPY IRMIL)L386-27-0002.0.0

'[ 09/26/86

- .. . .- . - - _ . _

_.- .- .. ._ - _ - _ .