_ _ _ _ _ _ _ _ _ _ _ _ _ _
?
DOCKET NO.
50-483 UNIT NAME CALLAWAY UNIT 1 DATE 4/7/87 COMPLETED BY B. W. KEITH TELEPilONE 314/676-8742 PART A OPERATIONS
SUMMARY
The plant operated at approximately 100% power throughout the month with the exception of three periods at reduced power to aid in fuel conservation. The plant was reduced to approximately 80% power on:
- 1) 3/6/87 through 3/8/87
- 2) 3/13/87 through 3/17/87
- 3) 3/20/87 through 3/29/87 PART B PORV AND SAFETY VALVE SUM 1ARY None
[\\..
y CA #804
)
04/10/85 QDP 22 04204 Page 1 of 4 8704200002 870331 DR ADOCK 05000483 PDR
l l
Part C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-483 UNIT NAME CALLAWAY UNIT 1 DATE 4/7/87 COMPLETED BY B. W. KEITH TELEPHONE 314/676-8742 MONTH:
MARCH 1987 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POkTR LEVEL DAY (HWe-Net)
DAY (MWe-Net) 1 1108 17 918 2
1107 18 1091 3
1109 19 1097 4
1107 20 1085 5
1101 21 879 6
1098 22 863 7
894 23 858 8
879 24 864 9
1081 25 866 10 1108 26 864 11 1110 27 866 12 1108 28 864 13 1093 29 881 14 882 30 1058 15 877 31 1072 16 881 CA-#804 04/10/85 QDP-ZZ-04204 Page 2 of 4
Pcrt D OPERATING DATA REPORT DOCKET NO.
50-483 UNIT NAME CALLAWAY UNIT 1 DATE 4/7/87 COMPLETED BY B. W. KEITH TELEPHONE 314/676-8742 OPERATING STATUS (YTD CUM )
1.
REPORTING PERIOD: March 1987 CROSS HOURS IN REPORTING PERIOD:
744 (2160 19982.5)
{
2 CURRENTLY AU1110RIZED POWER LEVEL (MWt):
3411 MAX. DEPEND. CAPACITY (E'e-Net):
1120 DESIGN ELECTRICAL RATING (MWe-Net):
1171*
- At stretch power level which is not currently authorized under tl e Operating License.
3.
POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):
100%
4 REASONS FOR RESTRICTION (IF ANY):
THIS MONTH YR TO DATE CUMULATIVE 5.
NUMBER OF HOURS REACTOR WAS CRITICAL...............
744.0 2138.2 17908.3 6.
REACTOR RESERVE SHUTDOWN HOURS.....................
0 0
0 7
HOURS GENERATOR ON LINE............................
744.0 2133.0 17444.9 8
UNIT RESERVE SHUTDOWN HOURS........................
0 0
0 9.
GROSS THERMAL ENERGY GENERATED (EH)...............
2,310,093 6,898,495 55,468,390
- 10. CROSS ELECTRICAL ENERGY GENERATED (EH)............
774,021 2,336,888 18,730,026
- 11. NET ELECTRICAL ENERGY CENERATED (MWH)..............
736,085 2,227,472 17,795,372
- 12. REACIOR SERVICE FACTOR.............................
100%
99.0%
89.6%
- 13. REACTOR AVAILABILITY FACIDR........................
100%
99.0%
89.6%
14 UNIT SERVICE FACIDR................................
100%
98.8%
87.3%
- 15. UNIT AVAILABILITY FACTOR...........................
100%
98.8%
87.3%
- 16. UNIT CAPACITY FACTOR (Using MDC)...................
88.3%
92.1%
79.5%
- 17. UNIT CAPACITY FACTOR (Using Design %'e) 84.5%
88.1%
76.1%
18.
UNIT FORCED 0"! AGE RATE............................
0.0%
1.3%
4.5%
- 19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
37 day planned maintenance outage starting April 4, 1987 63 day refueling outage starting September 11, 1987 20.
IF SHUT DOWN AT END OF REPORTING PERIOD, ESTIMATED DATE OF STARTUP:
CA-#804 04/10/85 QDP-ZZ-04204 Page 3 of 4 l
Part E UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-483 UNIT NAME CALLAWAY UNIT 1 DATE 4/7/87.
COMPLETED BY B. W. KEITH TELEPHONE 3I4/676-8742 REPORT MONTH: MARCH 1987 EDIOD OF TYPE SHUTTING DOWN F: FORCED DURATION DIE REACTOR OR DATE S: SCHEDULED (HOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS / COP 91ENTS 4.
3/6/87 S
0 H
4 Phel conservation.
5.
3/13/87 S
0 H
4 Fuel conservation.
6.
3/20/87 S
0 H
4 Fuel conservation.
1 l
SUMMARY
)
REASON METHOD A: EQUIPMENT FAILURE (EXPIAIN) 1: MANUAL B: MAINT. OR TEST 2: MANUAL SCRAM C: REFLTLING 3: AUTOMATIC SCRAM D: REGULATORY RESTRICTION 4: OTHER (EXPLAIN)
E: OPERATOR TRAINING AND LICENSE EXAMINATION F: ADMINISTRATIVE G: OPERATIONAL ERROR (EXPLAIN)
CA-#804 H: OTHER (EXPLAIN) 04/10/85 QDP-ZZ-04204 Page 4 of 4
p Eu[ INION ncnuc 33 Callaway Plant April 13, 1987 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 ULNRC-1490
Dear Sir:
DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT MARCH 1987 The enclosed Monthly Operating Report for March 1987 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
J'. D. Blosser Manager, Callaway Plant
(***
Wh$ M60OU$
MET /RDA/TPS/MKD/BWK/drs Enclosure ec: Distribution attached
/gf4
'\\\\
Mailm Acdress-P.O. Box 620, Futicvt MO 65251
V V
cc distribution for ULNRC-1490 with enclosures Mr. W. L. Forney, Chief Project Section IA U. S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 Mr. Paul O'Connor (2 copies)
Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop P-316 7920 Norfolk Avenue Bethesda, MD 20014 NRC Resident Inspector Manager, Electric Department Missouri Public Service Commission P. O. Box 360 Jefferson City, MO 65102 l