w-Alabama Power Company 600 North 18th Street Post Office Box 2641 Birmingham, Alabama 35291-0400 Telephone 205 250-183s AlabamaPower enio V ce r sident October 10, 1986 Docket Nos. 50-348 50-364 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention:
Mr. L. S. Rubenstein Gentlemen:
Joseph M. Farley Nuclear Plant - Units 1 and 2 Status of Licensing Items Attached for your information are the proposed schedules for the completion of licensing items. Attachment 1 contains a listing of license amendment requests and Attachment 2 contains a listing of other NRC related submittals. This letter updates and reschedules items contained in our letter of February 7,1986.
If you have any questions, please advise.
Respect fully
- itted, l-(w' R. P. Mcdonald RPM / JAR: dst Attachments cc: Mr. L. B. Long Dr. J. N. Grace Mr. E. A. Reeves Mr. W. H. Bradford j
B610200373 e61010 i
il DR ADOCK 05 38
m ATTACHMENT 1 STATUS OF LICENSE AMENDMENT REQUESTS PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
DATE DATE REMARKS
- 1. ISI Code Relief 10-14-85 12-27-85 59900 Complete Request for 10 59901 Year Reactor Vessel Examination, FNP-1 and 2 01-27-86 59776 Complete
- 2. Administrative 09-19-85 Change for 59777 Offsite and Onsite Organizational Changes, FNP-1 and 2 (T.S.
Figures 6.2-1 and 6.2-2) 11-27-85 03-14-86 60289 Complete
- 3. Quadrant Power Tilt Ratio 60290 (QPTR),FNP-1 and 2 (T.S.
4.2.3.2 and' Table 3.3-1) 11-22-85 04-15-86 60287 Complete
- 4. Correct Note for Rx Trip 60288 Signal on Turbine Trip for Plant Start-up, FNP-1 and 2(T.S. Table 4.3-1, Item 17.8)
- 5. Clarification 11-27-85 04-16-86 60293 Complete of Dose 60294 Equivalant 1-131 (DEI) 4 Definition, FNP-1 and 2 (T.S. 1.9) 4
,--,...-.--..n------.,,
,,,-..,.--.n,
ATTACHMENT 1 STATUS OF LICENSE l
AMENDMENT REQUESTS PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROYAL TAC ITEM DATE DATE(S)
DATE DATE REMARKS
- 6. Remove Rod Bow 11-27-85 06-16-86 60291 Complete Penalty, FNP-1 04-11-86 60292 and 2 (T.S.
3.2.3 and Bases, Delete Figure 3.2.3)
- 8. Reactor Coolant 02-07-86 09-09-86 60826 Complete Pump 60827 Operability Change for Mode 3, FNP-1 and 2 (T.S. 3/4.4.1.2)
- 9. Maximum Fuel 07-08-86 09-23-86 61949 Complete Rod Uranium (FNP-1)
(FNP-1)
Weight, FNP-1 and 2 (T.S.
04-18-86 04-21-86 61266 Complete 5.3.1)
(FNP-2)
(FNP-2)
- 10. Steam Generator 10-14-86 08-25-86 11-07-86 62283 Potential Tube Plugging critical Limits, FNP-1 outage item and 2 (T.S.
FNP-1; new Figure 2.1-1 and submittal to Section 3.2.2) respond to NRC questions
- 11. Increase RWST 07-03-86 10-31-86 61876 New submittal Boron 08-27-86 61877 Concentration, FNP-1 and 2 (T.S. 3.5.5, 3.5.1)
ATTACHMENT 1 STATUS OF LICENSE AMENDMENT REQUESTS PROPOSED ACTUAL REQUESTED ACTUAL' APCo APCo
-NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC-ITEM DATE DATE(S)
DATE DATE REMARKS 60355 New submittal 12-09-85 11-28-86
'12. Administrative Change to Fire Protection and Miscellaneous Other T.S.,
FNP-1 and 2 62811 New submittal 09-02-86 02-27-87
- 13. Snubber Visual Inspection 62812 Period Adjustment Criteria Change, FNP-1 and 2 (T.S.3/4.7.9) 55354 New submittal 12-16-85 03-02-87
- 14. GL 85-09 Rx Trip Breakers Action 08-01-86 55355 Statement and Surveillance, FNP-1 and 2-(T.S. Table 3/4.3-1) 62187 New submittal 08-11-86 04-03-87
- 15. Extend Operating 62188 License Expiration Date, FNP-1 and l
2 (License) l
- 16. Revised Heatup 60075 New submittals 10-25-85 06-05-87 and Cooldown 06-30-86 (FNP-1) l Curves. Based on 09-29-86 l
Regul atory (FNP-1) i Guide 1.99, 04-21-86 59902 Complete FNP-1 and 2 09-30-85 03-27-86 (FNP-2) l (FNP-2)
New item 06-12-87
- 17. ISI Reliefs for 12-01-86 1st 10-year period, FNP-1 l
l L
ATTACHMENT 1 STATUS OF LICENSE-AMENDMENT REQUESTS PROPOSED
. ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
DATE DATE REMARKS 07-10-87 New item
- 18. Sealed Source, 11-10-86 FNP-1 and 2 (T.S. 3/4.7.10)
- 19. Steam Generator 01-16-87 07-20-87 New item Generic Repair, FNP-1 and 2 (T.S. 3/4.4.6)
- 20. Change AFD 02-13-87 08-14-87 New dates Target Band, FNP-1 and 2 (T.S. 3.2.1 and 4.2.1.4)
New item
- 21. Steam Generator 02-20-87 08-21-87 F*,
FNP-2 (T.S. 3/4.4.6) 09-02-87 New dates
- 22. Deletion of 03-02-87 Appendix B of License, FNP-1 and 2 (E.P.P.)
1 09-18-87 New dates
- 23. Small Diesel 03-20-87 Generator Testing, FNP and 2 (T.S.
3/4.8.1)
- 24. ISI Program and 04-01-87 10-01-87 New item Reliefs for 2nd 10-Year period, FNP-1 New item
- 25. RHR Suction 04-17-87 10-16-87 Valve Auto i
Closure Inter-lock Removal, FNP-1 and 2 (T.S. 3/4.9.8) m,
,y_, _ _ _., _
ATTACHMENT 1 STATUS OF LICENSE AMENDMENT REQUESTS PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
DATE DATE _
REMARKS.
- 26. Deletion of 05-15-87 11-13-87 New dates Na0H Tank, FNP-1 and 2 (T.S.3/4.6.2.2 and-Bases)
- 27. Administrative 01-30-87 12-01-87 New item Change to ISI and Miscellaneous Other T.S.,
FNP-1 and 2 12-18-87 New dates
- 28. Technical 06-19-87 Specification Optimization Program, FNP-1 and 2 (T.S.
3/4.3)
- 29. Deletion of 07-03-87 01-04-88 New item Fire Protection from Technical
. Speci fications, FNP-1 and 2 New item 10-08-86 None
- 30. Corrected Pages for Heatup and Cooldown Curves, FNP-2 New dates;
- 31. Containment 12-05-86 None Purge and Vent formerly TAC Operation,
- 57452 and FNP-1 and 2
- 57453 (T.S. 3/4.6)
ATTACHMENT 1 STATUS OF LICENSE AMENDME!!T REQUESTS PROPOSED ACTUAL REQUESTED ACTUAL APCo APCo' NRC NRC NRC SUBMITTAL SUBMITTAL APPROVAL APPROVAL TAC ITEM DATE DATE(S)
DATE DATE REMARKS
- 32. Fire Protection 03-13-85 11-19-85 57243 Complete Requests, FNP-1 (FNP-2) and 2 05-31-85 09-10-86 57854 Complete (FNP-1) 10-18-85 10-31-86 60030 Revises FNP-1 01-27-86 and shared, (FNP-1) new dates 10-18-85 10-31-86 60031 Revises FNP-2 01-27-86 and shared, (FNP-2) new dates
- 33. Change to TBD TBD New dates Clarify Method of QPTR and AFD Channel Calibrations, FNP-1 and 2 (T.S. 4.2.1.2, 4.2.4.2, Table 4.3-1) y
...-.-,..,-.._r.
._,_m.-,._,r,......,
_,,.,7,,..
r._m.,---,
_. ~.
y,
ATTACHMENT 2 STATUS OF OTHER NRC RELATED SUBMITTALS PROPOSED ACTUAL APCo APCo NRC SUBMITTAL SUBMITTAL
. TAC ITEM DATE DATE(S)
REMARKS 1.= Inservice 05-07-86 N/A Complete Inspection Report of Steam Generator Tube Inspections 2.
Radial Peaking Factor Report a.
Unit 2, Cycle 5 03-19-86 N/A Complete b.
Unit 1, Cycle 8 09-15-86 N/A
_ Complete 03-31-86 N/A Complete 3.
Annual Report of Plant Changes, FNP-1 and 2 05-14-86 N/A Complete 4.
IEB 85-03, Motor Operated Valve 09-18-86 Common Mode Failure During Plant Transients Due to Improper Switch Settings, FNP-1 and 2
06-30-86 48163 Complete 5.
NUREG-0737, II.K.3.31, SBLOCA 48164 Plant-specific Analysis, FNP-1 and 2
N/A Report every 5 years 6.
NUREG-0737, 11-14-86 II.K.3.17, ECCS 3
Outages, FNP-2 06-30-86 N/A Complete 7.
FSAR Update 8.
Startup Reports 08-28-86 N/A Complete a.
Unit 2, Cycle 5 N/A 90 days after startup b.
Unit 1, Cycle 8 02-16-87 i
I l
i
ATTACHMENT 2-STATUS OF OTHER NRC RELATED SUBMITTALS i
PROPOSED ACTUAL APCo APCo NRC SUBMITTAL SUBMITTAL TAC
-ITEM DATE DATE(S)
REMARKS 9.
Generic Letter 82-33, Supplement 1 to NUREG-0737, Requirements for Emergency Response Capability (SECY 82-111) i N/A 4th Quarter 1986 a.
CRDR Summary 12-31-86 Report 03-31-86 N/A Complete b.
SPDS Additional Information i
c.
R.G. 1.97 08-08-86 N/A Complete Additional Information 10.
10CFR50.62, 02-27-87 59092 Raspond to NRC AMSAC Isolation 59093 SER Appendix A Device Information
- 11. Status Updates to Monthly Monthly N/A Verbal reports; new item NRC 09-19-86 N/A New dates;
- 12. NRC Invoice for Review of formerly TAC 10CFR50
- 57452 and Applications,