ML20215G430
| ML20215G430 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 10/16/1986 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Dewease J LOUISIANA POWER & LIGHT CO. |
| Shared Package | |
| ML20215G433 | List: |
| References | |
| NUDOCS 8610200367 | |
| Download: ML20215G430 (2) | |
See also: IR 05000382/1986016
Text
.
_.
.
_ _ _ _ _
--
,1. . t;
l00T 101986 ~
InlReplyReferTo:
-
Docket:
50-382/86-16
<
~
.
.
_
Louisiana Power & Light Company'
.
. ATTN:
J. G. Dewease, Senior Vice President
Nuclear Operations
317 Baronne Street
^
P. O. Box 60340
New Orleans, Louisiana 70160
-
Gentlemen:
-
This refers to the inspection conducted by Messrst J. G.'Luehman, H. F. Bundy,
.
and T. R. Staker of this office during the period August 1-31, 1986, oft
activities authorized by NRC OperaLing License NPF-38 for Waterford Steam
Electric Station, Unit 3, and to the discussion of our findings with Mr.=R. P.
Barkhurst.and other members of youristaff at.the conclusion of the' inspection.
Areas examined'during the inspection included p.lant status;-Licensee Event
Report-(LER) followup; monthly surveillance; monthly maintenance; routine
inspection; IE Bulletins; preparation for refueling; potential generic.
problems; safety injection tanks; and followup of previous inspection items.
Within these areas, the inspection consisted of selective' examination of
procedures and ' representative records, interviews with personnel, and
observations by the inspectors.
The inspection findings are documented in the
encl.osed inspection report.
During this inspection, it:was found that certain of your activities were in
b
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in'accordance with the provisions of.Section 2.201
of the NRC's " Rules of Practice," Part 2,' Title 10, Code of Federal
Regulations.
Your response should be based on the. specifics contained in the
Notice of Violation enclosed with this letter.
We have also examined' actions you have taken with regard to previously
identified inspection findings.- The status of these itcms is identified in
paragraph 12 of the enclosed report.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office' of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
t :R
I
C:EP& S
C PB/
C:RPB
l
[10/c/86 man /rl//
,
JGag[lia
L
er
y
LYand
L
able
o
10/10/86
b/b/86
g0 /q /86
Xylo /86
ja/I /
i
, (/ 1 )
.
/
hO
67 861016
I
G
CK 05000382
1
.
-_
. _ _ _ _ _ _ _ - _ _ _ _ _
.
.
.
Louisiana Power & Light Company
-2-
Should you have any questions'concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosures:
'
.1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-382/86-16
cc w/ enclosures:
'
Louisiana Power & Light Company
ATTH:
R. P. Barkhurst, Plant Manager
P. O. Box B
Killona, Louisiana 70066
Louisiana Power & Light Company
ATTN:
G. E. Wuller, Onsite
Licensing Coordinator
P. O. Box B
Killona, Louisiana 70066
Middle South Services
ATTN: Mr. R. T.1Lally
P. O. Box 6100
New Orleans, Louisiana 70161
Louisiana Power & Light Company
ATTN:
K. W. Cook, Nuclear Support
and Licensing Manager
317 Baronne Street
P. O. Box 60340
New Orleans, Louisiana 70160
Louisiana Radiation Control Program Director
bec to DMB (IE01)
bec distrib. by RIV
- RPB
RSB
D. Crutchfield, NRR
- Resident Inspector
R. D. Martin, RA
- H.
Bundy
- Section Chief (RPB/C)
ORSP
D. Powers
- EP&RPB
- RIV File
L. Yandell
- MIS System
- RSTS Operator
- 766
- __ _ __ _ ______ ____ _________