Forwards Safety Insp Repts 50-456/86-51 & 50-457/86-39 on 860917-19 & 22-23.No Violation Noted
ML20215F901
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 10/09/1986
From: Shafer W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20215F905 List:
References
NUDOCS 8610160412
Download: ML20215F901 (2)


See also: IR 05000456/1986051

Text

-

,

..

1

0CT 091986

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Drs. R. B. Holtzman

and M. J. Destmann of this office on September 17-19, and 22-23, 1986, of

activities at Braidwood Nuclear Power Station, Units 1 and 2, authorized by

NRC Construction Permits No. CPPR-132 and No. CPPR-133 and to the discussion

of our findings with Mr. L. E. Davis and others of your staff at the

conclusion of the inspection on September 23, 1986. Telephone conversations

were held with representatives of your corporate staff on September 24, 1986

and with plant staff on September 29, 1986.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely, ,('

_

  • dridinalsignedbyW.5I5hafor"

W. D. Shafer, Chief

Emergency Preparedness and

Radiological Protection Branch

Enclosure: Inspection Reports

No. 50-456/86051(DRSS); and

No. 50-457/86039(DRSS)

See Attached Distribution

RIII I .. , l RII

R W r lo

Ho&N

ltaman/1s stman 4 umacher I r er A

I

0610160412 861009

hio l9, \O p}\'g u Y

PDR

G

ADOCK 00000456

PDR

s\

3

,

-

..

.

4

Commonwealth Edison Company 2

OCT 0 91986

Distribution

cc w/ enclosure:

D. L. Farrar, Director

of Nuclear Licensing

M. Wallace, Project Manager

D. Shamblin, Construction

Superintendent

E. E. Fitzpatrick, Station

Manager

P. L. Barnes, Regulatory

Assurance Supervisor

DCS/RSB (RIDS)

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

Phyllis Dunton, Attorney

General's Office, Environmental

Control Division

D. W. Cassel , Jr. , Esq.

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, ELD

J. Moore, ELD

G. Berry, ELD

J. Stevens, NRR

The Honorable Herbert Grossman, ASLB

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB