ML20215F731

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-498/86-23 & 50-499/86-21 on 860601- 0830 & Notice of Violation.Actions Taken Re Previously Identified Insp Findings Also Examined
ML20215F731
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 10/08/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20215F735 List:
References
NUDOCS 8610160353
Download: ML20215F731 (3)


See also: IR 05000498/1986023

Text

0

. . ,

,,,

'

-

OCT

8 586

-

In Reply Re'fer-To:

^

' Dockets:

50-498/86-23

50-499/86-21

Houston Lighting & Power Company

ATTN: J. H. Goldberg

>

.

Group Vice President, Nuclear:

P. O. Box'1700

Houston, Texas.77001

Gentlemen:

This refers-to the inspection conducted by Messrs. C. E. Johnson and:

LD.' L. Garrison of this office'during the period' June 1 through August 30, 1986,

of activities authorized by.NRC Construction Permits CPPR-128 and 129 for the

South Texas Project,-Units 1 and 2, and to the discussion of our findings with

. Mr. J. T. Westermeir and other members of your staff at the conclusion of the

-

inspection.

Areas examined during the inspection included site tours, licensee action.on

previous inspection findings, concrete activities, material control, reactor

coolant pressure boundry hydrostatic test,. reactor vessel and-internals,-

mechanical components, safety-related piping,- and safety-related pipe support -

and restraint systems. . Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews with

personnel, and observations by the inspectors. The inspection findings are

-

documented in the enclosed inspection report.

<

During this ' inspection, it was found that-certain of your activities were in

violation of NRC requirements.

Consequently,~you are required to respond to

these violations,~in writing,.in accordance with the provisions of-

~

Section 2.201 of the NRC's " Rules ~of Practice," Part 2, Title 10, Code of

Federal Regulations.

Your response should be based on the specifics contained--

in the Notice of Violation enclosed with this letter.

.

'

We have also examined actions you have taken with regard to previously

identified-inspection findings.

The status of these items is identified in

paragraph 3 of the enclosed report.

l

The. response directed by'this letter and the accompanying Notice is not subject

E

to the clearance procedures of'the Office of Management and Budget as required

-

by the Paperwork Reduction Act of 1980, PL 96-511.

a

RIV:SI

L RPB/C k

RPB/

C PB/

C:RP

CEJohn

DLGarris

RGTa

L

ble

JEG

ardo

9 //#86

9/Af/86

f /g 86

C

(0/]/86

/q/86

/

-

8610160353 861008'

PDR

ADOCK 05000498

Il

G

PDR

my-

-

--m

w

. ._

-

'

,

..

,

I

Houston Lighting & Power Company

-2-

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

~'asnal owned tyi

H. i. IU.:,L"

J. E. Gaglihrdo, Chief

.

Reactor Projects Branch

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

50-498/86-23

50-499/86-21

l

cc w/ enclosures:

l

Houston Lighting & Power Company

ATTN:

M. Wisenberg, Manager,

Nuclear Licensing

P. O. Box 1700

Houston, Texas

77001

Brian Berwick, Esquire

Asst. Attorney General

Environmental Protection Div.

P. O. Box 12548, Capitol Station

I

Austin, Texas 78711

Lanny Alan Sinkin

Citizens Concerned About

Nuclear Power, Inc.

Christic Institute

1324 North Capitol Street

Washington, DC

20002

Charles Bechhoefer, Esquire

Chairman, Atomic Safety & Licensing

Board

U.S. Nuclear Regulatory Commission

Washington, DC

20555

Dr. James C. Lamb, III

313 Woodhaven Road

Chapel Hill, North Carolina

27514

,

_

-_

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . . _ _ .

_

._

_ _

-

.

,

Houston Lighting & Power Company

-3-

Frederick J.'Shon

Administrative Law Judge

Atomic Safety and Licensing Board

U.S. Nuclear Regulatory Commission

Washington, DC-

20555

Alvin H. Gutterman

Newman & Holtzinger, P.C.

1615 L St., N.W., Suite 1000

Washington, DC

.20036

bcc to DMB (IE01)

bcc distrib. by RIV:

  • RPB

DRSP

  • Resident Inspector-0PS .

R. D. Martin, RA

  • Resident Inspector-CONST.
  • Section Chief (RPB/C)
  • R&SPB

'* MIS SYSTEM

  • RIV File
  • D. Weiss, LFMB (AP.-2015)
  • RSTS Operator

R. Pirfo, ELD

  • R. G. Taylor, RPB/C
  • RSB

R. F. Heishman, IE

D. Powers, EO

.

  • w/766

<

f

,

.

,

~ . - - _ . .

. . - , - . .

,,

- , . - , .

.-