ML20215F470
| ML20215F470 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 10/02/1986 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | White S TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML20215F473 | List: |
| References | |
| NUDOCS 8610160228 | |
| Download: ML20215F470 (4) | |
See also: IR 05000327/1986032
Text
.kkbLW
~'
-
.
~r..
,9 -
October 2,
1986
Docket Nos. 50-327, 50-328
'
ennessee Valley Authority
ATTN: Mr. S. A. White
Manager of Nuclear Power
6N 38A Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
Gentlemen:
1 SUBJECT: NRC INSPECTION REPORT NOS. 50-327/86-32 AND 50-328/86-32
This refers to the Nuclear Regulatory Commission (NRC) inspections conducted by
S. D. Stadler on May 19-23, 1986, and by W. K. Poertner on July 7-11, 1986. The
inspections included a review of activities authorized for your Sequoyah facility.
At the conclusion of the inspections, the findings were discussed with those
members of your staff identified in the enclosed inspection report.
NRC concerns relative to the inspection findings were discussed by J. N. Grace,
Regional Administrator, NRC, Region II, with C. C. Mason, Deputy Manager Nuclear
Power, TVA, in an enforcement conference held on August 25, 1986.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The inspection findings indicate that certain activities violated NRC
requirements.
The violation described in the enclosed inspection report is
under consideration for escalated enforcement action.
Accordingly, a Notice of
Violation is not being issued at this time.
No response to this letter is
required.
However, please be advised that the number and characteristics of
violation described in the enclosed report may change as a result of further
NRC review. You will be advised by separate correspondence of the results of our
deliberations on this matter.
Your attention is invited to unresolved items identified in the inspection
report. These matters will be pursued during future inspections.
The enclosed Inspection Report documents an oral commitment made during the
June 23,1986 conference call (see page 28) regarding legibility of Piping and
Instrument Diagrams.
If your understanding of this commitment differs from the
report statements, please inform this office promptly.
8610160228 861002
ADOCK 05000327
G
' t 750/
J
.
~
(t.
.
Tennessee Valley Authority
2
October 2,
1986
- !
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10,' Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Docu;nent Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
.
ORIS: 0. E:G!ED BYI
J. IlELSO.~i CP/45
J. Nelson Grace
Regional Administrator
!
Enclosure:
NRC Inspection Report
,
c w/ encl:
H. L. Abercrombie, Sequoyah Nuclear
j Plant Site Director
v R. L. Gridley, Director, Nuclear
d.SafetyandLicensing
'i
A. Kirkebo, Director, Nuclear
Engineering
'
/M.R. Harding,LicensingSiteManager
. R. Wallace, Plant Manager
Acc w/ encl:
V . N. Grace -
. R. Denton, NRR
. L. Thompson, NRR
i
. M. Taylor, IE
. B. Hayes, 0I
- _
. R. Connelly, OIA
.
. G. Zech
K. P. Barr
/NRCResidentInspector
(
c:
'
.
Document Control Desk
'
State of Tennesee
-
-]
RI
RII
RII
RII
RII
RII
l
SDStadler:er
BWilson
CAJulian
AFGibson
GZech
RD
ker
09/ /86
09/ 86
09/ /86
09/ /86
09/ /86 0/
86
.,
4
RII
&
GRJenkins
09/ /86
. . .
.
.-
.-
.
- . .
.
. .
.
.
. .
.
.
. .
- *
.
'
.
2,.
,,-
Tennessee Valley Authority
2
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
J. Nelson Grace
.
Regional Administrator
Enclosure:
NRC Inspection Report
cc w/ encl:
H. L. Abercrombie, Sequoyah Nuclear
Plant Site Director
P. R. Wallace, Plant Manager
R. L. Gridley, Director, Nuclear
Safety and Licensing
W. C. Drotleff, Director, Nuclear
Engineering
.
M. R. Harding, Licensing Site Manager
bec w/ enc 1:
J. N. Grace
H. R. Denton, NRR
H. L. Thompson, NRR
J. M. Taylor, IE
-
B. B. Hayes, 01
S. R. Connelly, 0IA
G. G. Zech
K. P. Barr
NRC Resident Inspector
Document Control Desk
State of Tennesee
-
II
RII
RI
II
SDStadler:er
BWilson
CAJulian
AFGibson
GZech
er
09/ /86
09/ 86
09/ /86
09/ /86
094ty86 0
RIIe/
GRJen ns
09/
6
3
-
. -
_
- .
. - -
, ' . . -
-
~-
l
'
.a.
..
Tennessee Valley Authority
2
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
>
Sincerely,
J. Nelson Grace
Regional Administrator
Enclosure:
NRC Inspection Report
cc w/ encl:
H. L. Abercrombie, Sequoyah Nuclear Plant
Site Director
P. R. Wallace, Plant Manager
K. W. Whitt, Director, Nuclear
Managers Review Group
D. L. Williams, Jr. , Supervisor
Licensing Section
G. B. Kirk, Compliance Staff Supervisor
J. E. Wills, Project Engineer
bec w/ encl:
J. N. Grace
. ,_ 2 . r
o
n
H. R. Denton, NRR
H. L. Thompson, NRR
J. M. Taylor, IE
B. B. Hayes, 01
S. R. Connelly, 01A
G. G. Zech
S ". '.'a N . O W
NRG. Resident Inspector
r Document: Control Desk
eState of Tennesee
p
56 , lb
9
...
RII
RII
RI
RI
'
d C20"
09/ /86 09/ /86
}
CA u ian
09g/86
09/{/86
9
/8
09
GRJenkins
@/ /SS -
._ -.
-
. - - -
_
_
.- _-_ _
_