Forwards Insp Repts 50-327/86-32 & 50-328/86-32 on 860519-23 & 0707-11.Violation Noted Under Consideration for Escalated Enforcement Action.Notice of Violation Not Being Issued at Present
ML20215F470
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 10/02/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: White S
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20215F473 List:
References
NUDOCS 8610160228
Download: ML20215F470 (4)


See also: IR 05000327/1986032

Text

-

~'

.kkbLW

. ~r..

,9 -

October 2, 1986

Docket Nos. 50-327, 50-328 '

License Nos. DPR-77, DPR-79

ennessee Valley Authority

ATTN: Mr. S. A. White

Manager of Nuclear Power

6N 38A Lookout Place

1101 Market Street

Chattanooga, TN 37402-2801

Gentlemen:

1 SUBJECT: NRC INSPECTION REPORT NOS. 50-327/86-32 AND 50-328/86-32

This refers to the Nuclear Regulatory Commission (NRC) inspections conducted by

S. D. Stadler on May 19-23, 1986, and by W. K. Poertner on July 7-11, 1986. The

inspections included a review of activities authorized for your Sequoyah facility.

At the conclusion of the inspections, the findings were discussed with those

members of your staff identified in the enclosed inspection report.

NRC concerns relative to the inspection findings were discussed by J. N. Grace,

Regional Administrator, NRC, Region II, with C. C. Mason, Deputy Manager Nuclear

Power, TVA, in an enforcement conference held on August 25, 1986.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

The inspection findings indicate that certain activities violated NRC

requirements. The violation described in the enclosed inspection report is

under consideration for escalated enforcement action. Accordingly, a Notice of

Violation is not being issued at this time. No response to this letter is

required. However, please be advised that the number and characteristics of

violation described in the enclosed report may change as a result of further

NRC review. You will be advised by separate correspondence of the results of our

deliberations on this matter.

Your attention is invited to unresolved items identified in the inspection

report. These matters will be pursued during future inspections.

The enclosed Inspection Report documents an oral commitment made during the

June 23,1986 conference call (see page 28) regarding legibility of Piping and

Instrument Diagrams. If your understanding of this commitment differs from the

report statements, please inform this office promptly.

8610160228 861002

PDR ADOCK 05000327

G PDR

' t

750/ J

.

~

.

(t.

Tennessee Valley Authority 2 October 2, 1986

!

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10,' Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Docu;nent Room.

Should you have any questions concerning this letter, please contact us.

. Sincerely,

ORIS: 0. E:G!ED BYI

J. IlELSO.~i CP/45

J. Nelson Grace

Regional Administrator

! Enclosure:

,

NRC Inspection Report

c w/ encl:

H. L. Abercrombie, Sequoyah Nuclear

j Plant Site Director

v R. L. Gridley, Director, Nuclear

'i

d.SafetyandLicensing

A. Kirkebo, Director, Nuclear

'

Engineering

. R. Wallace, Plant Manager

/M.R. Harding,LicensingSiteManager

Acc w/ encl:

V . N. Grace -

. R. Denton, NRR

. L. Thompson, NRR

i . M. Taylor, IE

. B. Hayes, 0I
_ . R. Connelly, OIA .

. G. Zech

K. P. Barr #

. /NRCResidentInspector (

'

c:

'

Document Control Desk

State of Tennesee -

-]

RI RII RII RII RII RII

l SDStadler:er BWilson CAJulian AFGibson GZech RD ker

., 09/ /86 09/ 86 09/ /86 09/ /86 09/ /86 0/ 86

4

RII

&

GRJenkins

09/ /86

_

  • *

.

'

.

2,. ,,-

Tennessee Valley Authority 2

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely,

J. Nelson Grace .

Regional Administrator

Enclosure:

NRC Inspection Report

cc w/ encl:

H. L. Abercrombie, Sequoyah Nuclear

Plant Site Director

P. R. Wallace, Plant Manager

R. L. Gridley, Director, Nuclear

Safety and Licensing

W. C. Drotleff, Director, Nuclear

Engineering .

M. R. Harding, Licensing Site Manager

bec w/ enc 1:

J. N. Grace

H. R. Denton, NRR

H. L. Thompson, NRR

J. M. Taylor, IE -

B. B. Hayes, 01

S. R. Connelly, 0IA

G. G. Zech

K. P. Barr

NRC Resident Inspector

Document Control Desk

State of Tennesee -

II RII PII RI II

SDStadler:er BWilson CAJulian AFGibson GZech RDW er

09/ /86 09/ 86 09/ /86 09/ /86 094ty86 0

RIIe/

GRJen ns

09/ 6

3

. - _ . - -

,'..- -

l ~- '

.a. ..

Tennessee Valley Authority 2

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and its enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this letter, please contact us.

>

Sincerely,

J. Nelson Grace

Regional Administrator

Enclosure:

NRC Inspection Report

cc w/ encl:

H. L. Abercrombie, Sequoyah Nuclear Plant

Site Director

P. R. Wallace, Plant Manager

K. W. Whitt, Director, Nuclear

Managers Review Group

D. L. Williams, Jr. , Supervisor

Licensing Section

G. B. Kirk, Compliance Staff Supervisor

J. E. Wills, Project Engineer

bec w/ encl:

J. N. Grace

o n . ,_ 2 . r

H. R. Denton, NRR

H. L. Thompson, NRR

J. M. Taylor, IE

B. B. Hayes, 01

S. R. Connelly, 01A

G. G. Zech

S ". '.'a N . O W

NRG. Resident Inspector

r Document:

e Control Desk

State of Tennesee p

56 , lb

9 ...

RI RI

RII RII RMF

09/ /86 09/ /86

'

}09 CA u ian d C20"

9 /8 09g/86 09/{/86

GRJenkins

@/ /SS -

._ -. - _ _ _