Forwards SALP Repts 50-424/86-85 & 50-425/86-42 for Jul 1985 - Sept 1986.One Major Weakness Identified in Physical Security Area.Overall Performance of Facility Satisfactory
ML20215F364
Person / Time
Site: Vogtle  
Issue date: 12/12/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20215F366 List:
References
NUDOCS 8612230367
Download: ML20215F364 (3)


See also: IR 05000424/1986085

Text

-

,

__

.

- .

,f~.

Y

u 88

sc

Docket Nos. 50-425, 50-424

License Nos..CPPR-108, CPPR-109

Gforgia Power Company

vATTN:

Mr. J. H. Miller, Jr.

President

P. O. Box 4545

Atlanta, Georgia 30323

Gentlemen:

SUBJECT:

SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE REPORT NOS. 50-424/86-85

AND 50-425/86-42

The NRC Systematic Assessment of Licensee Performance (SALP) Board has completed

a special assessment of your Vogtle facility in anticipation of your receipt of

an Operating License for Unit 1.

The facility was evaluated for the period of

July 1,

1985 through September 30, 1986.

The results of the assessment are

documented in the enclosed SALP Board Report. The report will be discussed with

you at the Region II office on December 19, 1986, at 1:00 p.m.

'

.

The performance of your Vogtle facility was evaluated in the following functional

areas for Units 1 and 2 construction activities: soils and foundations; contain-

ment, safety related structures and major steel supports; piping systems and

supports; auxiliary systems; electrical equipment and cables; instrumentation;

quality programs and administrative controls affecting quality; licensing;

independent design review; and, Drug and Alcohol Abuse Prevention Program and

Employee Concerns Program.

For Unit 1 operational activities, the following

functional areas were evaluated: preoperational testing; operational readiness;

maintenance; fire protection; emergency preparedness; security; quality programs

and administrative controls affecting quality; and training.

The overall performance of your Vogtle facility was satisfactory. Management

attention and involvement were evident in both construction and operating activi-

ties.

This was evidenced by the aggressiveness and initiative demonstrated

by your performance in the areas of Readiness Review, Employee Concerns, and Drug

and Alcohol Prevention Programs which were particularly noteworthy. Significant

strengths were identified in the construction areas of soils and foundations,

,

I

containment and safety related structures, instrumentation, quality programs and

,tuct administrative controls affecting quality, independent design review, and drug

38@ and alcohol abuse program and employee concerns program. Significant strengths

i

gg

were also identified in the preoperational testing and emergency preparedness

areas.

g

g

One major weakness was identified in the physical security area. This weakness

no

primarily involved incomplete design and installation of the physical security

@A

system and was promulgated by the late date of completion of installation and

g

y

testing of the system.

r

a:

$$o Any comments yo'u have concerning our assessment of the performance of your

facility should be submitted to this office within 30 days following the date of

our meeting. Your comments; a summary of our meeting; and my disposition of your i i

comments will be issued as appendices to the enclosed SALP Board Report.

DD/

_.

.

-.

.

.

-

_ - -

--

..

.

-.

--

.

-

.

'

..

.s

,.

1986

DEC 12

Georgia Power Company

2

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

4A

db

Orhod.

c3 n h

J. Nelson Grace

Regional Administrator

Enclosure:

SALP Board Report, Vogtle

pt w/ encl:

vJ. P. O'Reilly, Senice Vice President

/ Nuclear Operations

/ . E. Conway, Senior Vice President &

Project Director

C. Whitney, General Manager Project

f Support

VP. D. Rice, Vice President, Project

Engineering

. H. Pinson, Vice President, Project

Construction

J. T. Beckham, Vice President &

f General Manager - Operations

4 R. A. Thomas, Vice President,

Licensing

  • D. S. Read, General Manager,

Quality Assurance

C. W. Hayes, Vogtle Quality

Assurance Manager

W. C. Ramsey, Manager -

/ Readiness Review

43. B. Bockhold, General Manager,

/

Nuclear Operations

V L. Gucwa, Manager, Nuclear Safety

and Licensing

. Ballflower, Quality Assurance

d.SiteManager-Operations

D. Groover, Quality

Assurance Site Manager -

Construction

. A. Bailey, Project Licensing

Manager

. F. Trowbridge, Esq., Shaw,

jPittman,PottsandTrowbridge

4. W. Churchill, Esq. , Shaw,

/ Pittman, Potts and Trowbridge

,J E. L. Blake, Jr. , Esq. , Shaw,

Pittman, Potts and Trowbridge

(cc w/ enc 1 cont'd

'ee page 3)

s

.

.

.;

  • ,-_ w

DEC 121986

-Georgia Power Company

3

( c w/ encl cont'd)

. E. Joiner, Troutman, Sanders,

f ockerman and Ashmore

l

V . G. Ledbetter, Commissioner,

/ Department of Human Resources

/ C. H. Badger, Office of Planning

j and Budget

VD. Kirkland, III, Counsel,

Office of the Consumer's Utility

/ Council

VD. Feig, Georgians Against

jNuclear Energy

V . B. Margulies, Esq., Chairman,

Atomic Safety and Licensing Board

Panel

Dr. O. H. Paris, Administrative Judge

Atomic Safety and Licensing Board

/ Panel

'

VG. A. Linenberger, Jr. , Administrative Judge

Atomic Safety and Licensing Board

Panel

t;cc w/ encl:

J hairman Zech

,/fommissioner Roberts

-

-

JCommissionerAsselstine

RII

RI

/ Commissioner Bernthal

.gyf

f-

/ Commissioner Carr

EChristnot:cdg

VSinkule

/J. M. Taylor, IE

12//p/86

12/ o/86

f

v4j. R. Denton, NRR

A. J. Heltemes, Jr. , AE00

. G. Davis, NMSS

. E. Murley, RI

II

R

V

. G. Keppler, RIII

\\

/R. D. Martin, RIV

RDW ker

AFGit s n

/J. B. Martin, RV

12/

6

12//g 86

/J.A.Axelrad,IE

decordsCenter,INPO

gion II Distribution List C

. D. Landis

D. Smith, IE

. M. Novak, NRR

. A. Miller, NRR

NRC Resident In'spector - Vogtle

Document Control Desk

State of Georgia

Reyes(?

c

HHLivermore

JRogge

VLBrownlee

g Christnot:cdg

MVSinkule &

4

12/ /t/86

FA-12/ te /86

12/ir/86

12/it/86

12/iv/86

12//p/86

RI !

RII

RII)P

4NR

7

'4

NRR

RII

t

s

ses e

/ DWalk '

AFGibson

JPSnohr

Miller

g0' Conner

MLErnst

12//.2 /86

12/ /86

12/(Zd86

s 12/11/86

12//2./86

12/f Y 86