ML20215F288
| ML20215F288 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 10/03/1986 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | White S TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML20215F291 | List: |
| References | |
| NUDOCS 8610160144 | |
| Download: ML20215F288 (2) | |
See also: IR 05000327/1986026
Text
'u-N;ds.\\
~*
-
....
.
OCT 0 31986
Docket Nos. 50-327, 50-328
ennessee Valley Authority
ATTN:
Mr. S. A. White
,
Manager of Nuclear Power
6N 38A Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
Gentlemen:
SUBJECT: NRC INSPECTION REPORT NOS. 50-327/86-26 AND 50-328/86-26
,
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
M. B. Shymlock on March 19 - May 30,1986.
The inspection included a review of
activities authorized for your Sequoyah facility.
At the conclusion of the
inspection, the findings were discussed with those members of your ctaff
identified in the enclosed inspection report.
NRC concerns relative to the inspection findings were discussed by R. D. Walker,
Acting Deputy Regional Administrator, NRC, Region II, with C. C. Mason. Deputy
Manager, Nuclear Power, TVA, in an Enforcement Conference held on May 30, 1986.
I
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
The violations described in the enclosed Inspection Report and those in
Inspection Reports 50-327, 328/86-32 and 50-327, 328/86-44 are under
2
consideration for escalated enforcement action.
Accordingly, no Notice of
Violation is being issued at this time, and no response to this letter is
required.
However, please be advised that the number and characterization of
violations described in the enclosed Inspection Report may change as a result of
further NRC review.
You will be advised by separate correspondence of the
results of our deliberations on this matter.
Your attention is invited to the unresolved item identified in the inspection
report.
This matter will be pursued during future inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
8610160144 G61003
ADOCK 05000327
G
\\1l
-
.
-
-. .
)
-
-
. .
.
.
Tennessee Valley Authority
2
007 0 3 1986
Should you have any questions concerning this letter, please contact us.
1
,
Sincerely,
Cina.. ;
4
L ll2LI.C.i CRACE
J. Nelson Grace
Regional Administrator
Enclosure:
NRC Inspection Report
/ccw/ enc 1:
H. L. Abercrombie, Sequoyah Nuclear
Plant Site Director
/J. A. Kirkebo, Director
d.NuclearEngineering
L. Gridley, Director Nuclear
j Safety and Licensing
V M. R. Harding, Manager Site
Licensing
P. R. Wallace, Plant Manager
bec w/ enc 1:
-Nr-Gracs
. G. Zech
. R. Denton, NRR
. L. Thompson, NRR
. M. Taylor, IE
. B. Hayes, 01
. R. Connelly, 0IA
.
K. Barr, RII
1RC Resident Inspector
Document Control Room
State of Tennessee
.
4
l
RII
.
RI
RI
,
a roll:him
BDebs
KBarr
d4Zech
GJe . ns
9//f/86
9/g/86
9/ v/86
9fft/86
9/g
6
4
t
m