Partially Withheld Details of Insp Repts 70-0925/82-02 & 70-1193/82-02.No Noncompliance Noted.Major Areas Inspected: Security Organization,Training,Guard Qualification,Physical Barriers,Intrusion & Detection Alarms & Key ControlML20215F169 |
Person / Time |
---|
Site: |
07000925, 07001193 |
---|
Issue date: |
03/31/1982 |
---|
From: |
NRC |
---|
To: |
|
---|
Shared Package |
---|
ML20215F104 |
List: |
---|
References |
---|
FOIA-86-576 70-0925-82-02, 70-1193-82-02, 70-1193-82-2, 70-925-82-2, NUDOCS 8612230290 |
Download: ML20215F169 (15) |
|
|
---|
Category:INSPECTION REPORT
MONTHYEARML24115A2422024-04-25025 April 2024 Cimarron Environmental Response Trust - NRC Inspection Report 07000925/2024001 ML22217A0252022-08-0808 August 2022 Cimarron Inspection Report 2022-001 ML20233B0182020-08-20020 August 2020 Cimarron Uranium Plant - NRC Inspection Report 070-00925/2020-001 ML18352B2572019-01-10010 January 2019 Cimarron Uranium Response Trust Plant C/O Environmental Properties Management, Llc., NRC Inspection Report 070-00925/2018002 ML0422403542004-08-11011 August 2004 IR 07000925-04-001, Cimarron Corporation, 07/12-14/2004, Organization & Management Controls, Radiation Protection, Environmental Protection, and Emergency Preparedness ML0326505552003-09-18018 September 2003 IR 07000925-03-001, on 06/24 - 09/11/2003, Cimarron Corporation ML0226106472002-09-18018 September 2002 IR 07000925-02-001 on 06/24/2002 Through 06/27/2002, Cimarron Corporation (Crescent, Ok) ML0200901592002-01-0909 January 2002 IR 07000925-01-001, Cimarron Corporation (Kerr-McGee Corporation). Acknowledgment of Receipt of Licensee Response to Violation Identified in NRC Inspection Report Dated 11/26/2001 ML0133100722001-11-26026 November 2001 IR 07000925/2001-001 and Notice of Violation; Kerr-McGee Center, Inspection Conducted on 07/30/01 Through 08/02/01 and 08/05-06/01 at Cimarron Site Near Crescent, Oklahoma. on 11/21/01, a Telephonic Exit Interview Was Conducted ML0037714262000-11-24024 November 2000 IR07000925/2000-001 Kerr-McGee Center (Cimarron Corporation) 11/24/2000 ML0036858102000-02-23023 February 2000 IR070-0925/1999-002 of Kerr-McGee Center, Cimarron Site in Crescent, Oklahoma ML20216F2151999-09-14014 September 1999 Insp Rept 70-0925/99-01 on 990709-0817.No Violations Noted. Major Areas Inspected:Reviewing Final Status Survey Records & Collecting Soil Samples from sub-area O,Waste Ponds 1 & 2 to Confirm Compliance with License ML20155H7871998-11-0303 November 1998 Insp Rept 70-0925/98-02 on 980922-1022.No Violations Noted. Major Areas Inspected:Continuation of Confirmatory Survey Process & Review of Program for Control of Equipment & Concrete Released from Restricted Area ML20236R0811998-07-15015 July 1998 Insp Rept 70-0925/98-01 on 980513-0625.No Violations Noted. Major Areas Inspected:Review of Final Status Survey Records & Collecting Soil Samples from Pit 3 Lift 3 to Confirm Compliance W/License & BTP Option 2 Soil Limits ML20216H3751998-03-18018 March 1998 Insp Rept 70-0925/97-03 on 971117-980302.No Violations Noted.Major Areas Inspected:Decommissioning,Closeout Survey & Site Status ML20151L0561997-07-31031 July 1997 Insp Rept 70-0925/97-02 on 970520-21 & 27.No Violations Noted.Major Areas Inspected:Site Status,Radioactive Waste Shipments,Radiation Protection Program,Waste Mgt,Environ Monitoring Program & Followup of Previous Insp Issues ML0926802941997-04-11011 April 1997 IR 07000925-97-001 on 03/26/1997 for Cimarron Corporation ML20135F4951996-12-10010 December 1996 Insp Rept 70-0925/96-02 on 961104-07.No Violations Noted. Major Areas Inspected:Review of Site Status,Management, Organization & Controls,Radiation Protection Program, Environmental Program & Followup of Previous Insp Issues ML0926606751996-03-29029 March 1996 IR 07000925-96-001, on 03/06/1996 - 03/07/1996, for Kerr-McGee Facility. Cover Letter ML0926606761996-03-29029 March 1996 IR 07000925-96-001, on 03/06-07/1996, for Kerr-McGee Facility, Routine, Announced Inspection of the Final Survey Program and Related Activities ML0926602871995-12-11011 December 1995 IR 07000925-95-002, on 10/17/1995 -10/19/1995, for Cimarron Corporation Consisting of Review of the Phase I Final Survey Program and Related Activities, Cover Letter ML0926602881995-12-0707 December 1995 IR 07000925-95-002, on 10/17-19/1995, for Kerr-McGee Corp, Cimarron Uranium Plant, Inspection of the Phase I Final Survey Program and Related Activities ML0926602901995-02-16016 February 1995 IR 07000925-95-001, on 01/30 - 02/01/1995, for Kerr-McGee Corp, Cimarron Uranium Plant ML0926602911995-01-20020 January 1995 IR 07000925-94-001, on 11/17/1994 - 11/18/1994, for Kerr-McGee Corporation, Cover Letter ML0926602921995-01-18018 January 1995 IR 07000925-94-001, on 11/17-18/1994, for Kerr-McGee Corp, Cimarron Uranium Plant ML20246J0861989-05-10010 May 1989 Safety Insp Repts 70-0925/89-01 & 70-1193/89-01 on 890403-04.No Violations Noted.Major Areas Inspected:Mgt & Organization Controls,Radiation Protection,Operations Review & Transportation Activities ML20155K2971988-06-14014 June 1988 Insp Repts 70-0925/88-01 & 70-1193/88-01 on 880509-12,19,24 & 0602 & 06.No Violations Noted.Major Areas Inspected:Mgt & Organization Controls,Radiation Protection Program, Operations Review & Waste Generator Requirements ML20149E2901988-01-0707 January 1988 Safety Insp Repts 70-0925/87-02 & 70-1193/87-03 on 871207-09.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection Program,Operation Review, Transportation & Radwaste Audits & Procedures IR 07100130/20120011987-12-14014 December 1987 Partially Withheld Matl Control & Accountability Insp Rept 70-1193/87-02 on 871130-1201 (Ref 10CFR2.790).Major Areas Inspected:Matl Control & Accountability Insp,Including Shipping & Receiving of Snm,Storage,Inventory & Records ML20236G8811987-07-29029 July 1987 Safety Insp Repts 70-0925/87-01 & 70-1193/87-01 on 870609-12 & 0724.Violation Noted.Major Areas Inspected:Nuclear Criticality Safety,Mgt Organization & Control,Radiation Protection & Radwaste Mgt ML20210H3381986-09-22022 September 1986 Safety Insp Repts 70-0925/86-02 & 70-1193/86-02 on 860818-22.Violation Noted:Failure to Make Timely Submittal of Effluent Monitoring Rept ML20209D1651986-08-15015 August 1986 RO Insp Rept 70-1193/73-03 on 720117-730312.Noncompliances Illegible ML20137U0351986-02-10010 February 1986 Insp Repts 70-0925/86-01 & 70-1193/86-01 on 860106-10.No Violations or Deviations Noted.Major Areas Inspected: Organization,Nuclear Criticality Safety,Radiation Protection Program,Training,Operations Review & Transportation IR 05000624/20070191985-07-26026 July 1985 Insp Repts 70-0925/85-01 & 70-1193/85-01 on 850624-0719.No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Program,Training,Operations Review, Transportation,Radwaste & Audits & Procedures ML20215F1481984-06-29029 June 1984 Partially Withheld Details of Insp Rept 70-1193/84-04 on 840531-0601.Major Areas Inspected:Security Plan & Implementing Procedures,Organization,Physical Barriers & Access Control ML20215F1591984-03-31031 March 1984 Partially Withheld Details of Insp.Major Areas Inspected: Inventory,Records & Repts,Storage & Internal Controls, Measurements & Statistical Controls & Facility Organization ML20215F1561983-05-0606 May 1983 Partially Withheld Details of Insp Repts 70-0925/83-02 & 70-1193/83-03 on 830502-09.No Noncompliance Noted.Major Areas Inspected:Facility Organization,Measurement & Statistical Controls & Storage & Internal Controls ML20215F1431983-02-11011 February 1983 Partially Withheld Details of Insp Rept 70-1193/83-01 on 830117-21.Violation Noted:Portion of Perimeter Fence Not Properly Maintained IA-86-576, Partially Withheld Details of Insp Repts 70-0925/82-02 & 70-1193/82-02.No Noncompliance Noted.Major Areas Inspected: Security Organization,Training,Guard Qualification,Physical Barriers,Intrusion & Detection Alarms & Key Control1982-03-31031 March 1982 Partially Withheld Details of Insp Repts 70-0925/82-02 & 70-1193/82-02.No Noncompliance Noted.Major Areas Inspected: Security Organization,Training,Guard Qualification,Physical Barriers,Intrusion & Detection Alarms & Key Control ML20215F1691982-03-31031 March 1982 Partially Withheld Details of Insp Repts 70-0925/82-02 & 70-1193/82-02.No Noncompliance Noted.Major Areas Inspected: Security Organization,Training,Guard Qualification,Physical Barriers,Intrusion & Detection Alarms & Key Control ML20244B6411981-11-18018 November 1981 IE Insp Rept 70-0925/81-03 on 810715-16.Noncompliance Noted: Failure to Make Suitable Measurement of Airborne Radioactivity ML20215F1341981-06-15015 June 1981 Partially Withheld Insp Repts 70-0925/81-02 & 70-1193/81-02 on 810505-08.No Noncompliance Noted.Major Areas Inspected: Organization,Operations,Internal Audits,Training,Radiation Exposure Control,Security & Physical Barriers ML20215F1211981-02-19019 February 1981 Partially Withheld Details of Insp Repts 70-0925/81-01 & 70-1193/81-01 on 810126-29.Violations Noted:Failure to Measure Stds for NDA Measurements on Pu Wastes & Failure to Use Acceptable tamper-safe Seals on Hand ML19341D2651981-02-19019 February 1981 IE Insp Repts 70-0925/81-01 & 70-1193/81-01 on 810126-29. Noncompliance Noted:Unauthorized Possession of U W/ Enrichment Greater than 5% & Failure to Use Acceptable Tamper Safe Seals.Details Withheld (Ref 10CFR2.790) ML19290G7161980-11-10010 November 1980 IE Insp Repts 70-0925/80-03 & 70-1193/80-05 on 800930-1002. No Noncompliance Noted.Major Areas Inspected:Facility Changes & Mods,Radwaste Mgt & Licensee Actions on Previous Insp Findings ML19264A4221980-07-15015 July 1980 IE Insp Rept 70-1193/80-04 on 800612-13.Cover Sheet, Indicating Correction Encl ML19320B7271980-07-0101 July 1980 IE Insp Rept 70-1193/80-03 on 800612-13.No Noncompliance Noted.Major Areas Inspected:Nuclear Matl Control & Accounting.Details Withheld (Ref 10CFR2.790) ML19329G0551980-06-20020 June 1980 IE Insp Rept 70-0925/80-04 on 800610-12.No Noncompliance Noted.Major Areas Inspected:Facility Organization & Operation,Measurement & Statistical Details & Physical Inventory.Details Withheld (Ref 10CFR2.790) ML19320C5141980-06-12012 June 1980 IE Insp Repts 70-0925/80-02 & 70-1193/80-02 on 800407-08. Noncompliance Noted:Empty,Open 55-gallon Drums Were Found in Waste Shipment Storage Room 121 ML19305E2301980-02-28028 February 1980 IE Insp Repts 70-0925/80-01 & 70-1193/80-01 on 800206-07. Noncompliance Noted:Possession of SNM W/Enrichment Greater than Authorized by License 2024-04-25
[Table view] Category:MANUFACTURER/VENDOR/ENGINEER
MONTHYEARML20246J0861989-05-10010 May 1989 Safety Insp Repts 70-0925/89-01 & 70-1193/89-01 on 890403-04.No Violations Noted.Major Areas Inspected:Mgt & Organization Controls,Radiation Protection,Operations Review & Transportation Activities ML20155K2971988-06-14014 June 1988 Insp Repts 70-0925/88-01 & 70-1193/88-01 on 880509-12,19,24 & 0602 & 06.No Violations Noted.Major Areas Inspected:Mgt & Organization Controls,Radiation Protection Program, Operations Review & Waste Generator Requirements IR 07100130/20120011987-12-14014 December 1987 Partially Withheld Matl Control & Accountability Insp Rept 70-1193/87-02 on 871130-1201 (Ref 10CFR2.790).Major Areas Inspected:Matl Control & Accountability Insp,Including Shipping & Receiving of Snm,Storage,Inventory & Records ML20210H3381986-09-22022 September 1986 Safety Insp Repts 70-0925/86-02 & 70-1193/86-02 on 860818-22.Violation Noted:Failure to Make Timely Submittal of Effluent Monitoring Rept ML20209D1651986-08-15015 August 1986 RO Insp Rept 70-1193/73-03 on 720117-730312.Noncompliances Illegible ML20137U0351986-02-10010 February 1986 Insp Repts 70-0925/86-01 & 70-1193/86-01 on 860106-10.No Violations or Deviations Noted.Major Areas Inspected: Organization,Nuclear Criticality Safety,Radiation Protection Program,Training,Operations Review & Transportation IR 05000624/20070191985-07-26026 July 1985 Insp Repts 70-0925/85-01 & 70-1193/85-01 on 850624-0719.No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Program,Training,Operations Review, Transportation,Radwaste & Audits & Procedures ML20215F1481984-06-29029 June 1984 Partially Withheld Details of Insp Rept 70-1193/84-04 on 840531-0601.Major Areas Inspected:Security Plan & Implementing Procedures,Organization,Physical Barriers & Access Control ML20215F1591984-03-31031 March 1984 Partially Withheld Details of Insp.Major Areas Inspected: Inventory,Records & Repts,Storage & Internal Controls, Measurements & Statistical Controls & Facility Organization ML20215F1561983-05-0606 May 1983 Partially Withheld Details of Insp Repts 70-0925/83-02 & 70-1193/83-03 on 830502-09.No Noncompliance Noted.Major Areas Inspected:Facility Organization,Measurement & Statistical Controls & Storage & Internal Controls ML20215F1431983-02-11011 February 1983 Partially Withheld Details of Insp Rept 70-1193/83-01 on 830117-21.Violation Noted:Portion of Perimeter Fence Not Properly Maintained ML20215F1691982-03-31031 March 1982 Partially Withheld Details of Insp Repts 70-0925/82-02 & 70-1193/82-02.No Noncompliance Noted.Major Areas Inspected: Security Organization,Training,Guard Qualification,Physical Barriers,Intrusion & Detection Alarms & Key Control IA-86-576, Partially Withheld Details of Insp Repts 70-0925/82-02 & 70-1193/82-02.No Noncompliance Noted.Major Areas Inspected: Security Organization,Training,Guard Qualification,Physical Barriers,Intrusion & Detection Alarms & Key Control1982-03-31031 March 1982 Partially Withheld Details of Insp Repts 70-0925/82-02 & 70-1193/82-02.No Noncompliance Noted.Major Areas Inspected: Security Organization,Training,Guard Qualification,Physical Barriers,Intrusion & Detection Alarms & Key Control ML20244B6411981-11-18018 November 1981 IE Insp Rept 70-0925/81-03 on 810715-16.Noncompliance Noted: Failure to Make Suitable Measurement of Airborne Radioactivity ML20215F1341981-06-15015 June 1981 Partially Withheld Insp Repts 70-0925/81-02 & 70-1193/81-02 on 810505-08.No Noncompliance Noted.Major Areas Inspected: Organization,Operations,Internal Audits,Training,Radiation Exposure Control,Security & Physical Barriers ML20215F1211981-02-19019 February 1981 Partially Withheld Details of Insp Repts 70-0925/81-01 & 70-1193/81-01 on 810126-29.Violations Noted:Failure to Measure Stds for NDA Measurements on Pu Wastes & Failure to Use Acceptable tamper-safe Seals on Hand ML19341D2651981-02-19019 February 1981 IE Insp Repts 70-0925/81-01 & 70-1193/81-01 on 810126-29. Noncompliance Noted:Unauthorized Possession of U W/ Enrichment Greater than 5% & Failure to Use Acceptable Tamper Safe Seals.Details Withheld (Ref 10CFR2.790) ML19290G7161980-11-10010 November 1980 IE Insp Repts 70-0925/80-03 & 70-1193/80-05 on 800930-1002. No Noncompliance Noted.Major Areas Inspected:Facility Changes & Mods,Radwaste Mgt & Licensee Actions on Previous Insp Findings ML19264A4221980-07-15015 July 1980 IE Insp Rept 70-1193/80-04 on 800612-13.Cover Sheet, Indicating Correction Encl ML19320B7271980-07-0101 July 1980 IE Insp Rept 70-1193/80-03 on 800612-13.No Noncompliance Noted.Major Areas Inspected:Nuclear Matl Control & Accounting.Details Withheld (Ref 10CFR2.790) ML19329G0551980-06-20020 June 1980 IE Insp Rept 70-0925/80-04 on 800610-12.No Noncompliance Noted.Major Areas Inspected:Facility Organization & Operation,Measurement & Statistical Details & Physical Inventory.Details Withheld (Ref 10CFR2.790) ML19320C5141980-06-12012 June 1980 IE Insp Repts 70-0925/80-02 & 70-1193/80-02 on 800407-08. Noncompliance Noted:Empty,Open 55-gallon Drums Were Found in Waste Shipment Storage Room 121 ML19305E2301980-02-28028 February 1980 IE Insp Repts 70-0925/80-01 & 70-1193/80-01 on 800206-07. Noncompliance Noted:Possession of SNM W/Enrichment Greater than Authorized by License ML19296B6391980-01-0707 January 1980 IE Insp Repts 70-0925/79-05 & 70-1193/79-05 on 791203.No Noncompliance Noted.Major Areas Inspected:Ie Bulletin 79-19, Radiation Protection Aspects of Solvent Extraction Sys Dismantling & Solid Waste Disposal & Shipping Procedures ML19247A7491979-07-0909 July 1979 IE Insp Rpet 70-1193/79-03 on 790614-15.No Noncompliance Noted.Major Areas Inspected:Nuclear Matl Control & Accountability.Details Withheld (Ref 10CFR2.790) ML19289E3471979-03-20020 March 1979 IE Insp Rept 70-925/79-01 on 790307-09.No Noncompliance Noted.Major Areas Inspected:Nuclear Matl Control & Accounting ML19289E0001979-02-16016 February 1979 IE Insp Rept 70-1193/79-01 on 790223-26.Noncompliance Noted: Security Organization & Access Controls.Details Withheld (Ref 10CFR2.790) ML20211L4771978-08-0202 August 1978 Insp Repts 70-0925/78-02 & 70-1193/78-03 on 780710-12.No Noncompliance or Deviation Noted.Major Areas Inspected: Radiation Protection Program Radwaste Mgt,Solid Wastes,Waste Burial & Retention Ponds ML20207N5911975-06-0909 June 1975 Partially Deleted RO Insp Rept 70-1193/75-07 on 750520-22. Violations Noted:Change Made in Approved Security Plan Which Would Decrease Effectiveness & Prior Approval of Change Not Solicited or Received from NRC ML20215L7281975-04-24024 April 1975 Insp Rept 70-1193/75-04 on 750306-12.Noncompliances Noted: Transfers of Pu from Operating Hoods & Boxes Not Observed & Accompanied by Safeguards Clerk or Designated Individual & Entrances to General Lab Not Panic Locked ML20207N6351975-03-18018 March 1975 Partially Deleted Insp Rept 70-1193/75-01 on 750218-22. Noncompliances Noted:Radiotelephone in Transport Tractor Inoperable During Shipment of Matl & Only One of Eight Driver/Guards Requalified within 6-month Requirement ML20198A6861975-01-22022 January 1975 Insp Rept 70-0925/74-06 on 741219-20.No Violation Noted. Major Areas Inspected:Ground Outside Pellet Mfg Bldg within Licensee Perimeter Fence ML20207N6021974-09-30030 September 1974 Partially Deleted RO Insp Rept 70-1193/74-08 on 740911. Violations Noted:Installed Explosive Detector Not Being Maintained & Dock Air Lock Door Not Equipped W/Magnetic Switch Type Intrusion Alarm ML20215L6851974-09-24024 September 1974 RO Insp Rept 70-1193/74-07 on 740821-23.Noncompliances Noted:Implemented Stds Program Not in Full Compliance W/ License Condition Since Required Frequency in Measurements of Radioassay Stds Not Achieved ML20215L6731974-08-21021 August 1974 RO Insp Rept 70-1193/74-06 on 740723-25.Violation Noted:On Three Occasions,When Delayed Measurements Were Made,Licensee Failed to Complete & Rept Measurements on Form AEC-741 within 30 Days ML20207N5641974-05-28028 May 1974 Partially Deleted RO Insp Rept 70-1193/74-04 on 740506-09. Violations Noted:Tv Camera Not Relocated Inside Dock Area to Provide Immediate Visual Capability of Guard Upon Activation of Pu Monitor Alarm ML20215L5261974-04-15015 April 1974 RO Insp Rept 70-1193/74-03 on 740226-27.Major Areas Inspected:Facility Organization & Operation,Measurements & Statistical Controls,Shipping & Receiving,Storage & Internal Transfers,Inventory & Repts & Records ML20207N5321974-03-11011 March 1974 Partially Deleted RO Insp Rept 70-1193/74-02 on 740311-13. Noncompliance Noted:Combination Lock on Matl Storage Vault Broken & Inoperable & Visitor Log Sheet Did Not Provide Purpose of Visit ML20209D2021974-02-13013 February 1974 RO SNM Insp Rept 70-1193/73-08 on 731203-07.Noncompliance Noted:Limit of Error Associated W/Muf Exceeded 1.5 Kg Pu. Supporting Documentation Encl.Portions of Rept Details Illegible ML20207N4731973-02-16016 February 1973 Partially Deleted RO Insp Rept 70-1193/73-01 on 730114-16. Noncompliance Noted:Permanent Cement Structure Housing Transformers & Emergency Power Supply Sys Located within 15 to 20 Ft Inside Perimeter Fence 1989-05-10
[Table view] Category:INSPECTION REPORT
MONTHYEARML24115A2422024-04-25025 April 2024 Cimarron Environmental Response Trust - NRC Inspection Report 07000925/2024001 ML22217A0252022-08-0808 August 2022 Cimarron Inspection Report 2022-001 ML20233B0182020-08-20020 August 2020 Cimarron Uranium Plant - NRC Inspection Report 070-00925/2020-001 ML18352B2572019-01-10010 January 2019 Cimarron Uranium Response Trust Plant C/O Environmental Properties Management, Llc., NRC Inspection Report 070-00925/2018002 ML0422403542004-08-11011 August 2004 IR 07000925-04-001, Cimarron Corporation, 07/12-14/2004, Organization & Management Controls, Radiation Protection, Environmental Protection, and Emergency Preparedness ML0326505552003-09-18018 September 2003 IR 07000925-03-001, on 06/24 - 09/11/2003, Cimarron Corporation ML0226106472002-09-18018 September 2002 IR 07000925-02-001 on 06/24/2002 Through 06/27/2002, Cimarron Corporation (Crescent, Ok) ML0200901592002-01-0909 January 2002 IR 07000925-01-001, Cimarron Corporation (Kerr-McGee Corporation). Acknowledgment of Receipt of Licensee Response to Violation Identified in NRC Inspection Report Dated 11/26/2001 ML0133100722001-11-26026 November 2001 IR 07000925/2001-001 and Notice of Violation; Kerr-McGee Center, Inspection Conducted on 07/30/01 Through 08/02/01 and 08/05-06/01 at Cimarron Site Near Crescent, Oklahoma. on 11/21/01, a Telephonic Exit Interview Was Conducted ML0037714262000-11-24024 November 2000 IR07000925/2000-001 Kerr-McGee Center (Cimarron Corporation) 11/24/2000 ML0036858102000-02-23023 February 2000 IR070-0925/1999-002 of Kerr-McGee Center, Cimarron Site in Crescent, Oklahoma ML20216F2151999-09-14014 September 1999 Insp Rept 70-0925/99-01 on 990709-0817.No Violations Noted. Major Areas Inspected:Reviewing Final Status Survey Records & Collecting Soil Samples from sub-area O,Waste Ponds 1 & 2 to Confirm Compliance with License ML20155H7871998-11-0303 November 1998 Insp Rept 70-0925/98-02 on 980922-1022.No Violations Noted. Major Areas Inspected:Continuation of Confirmatory Survey Process & Review of Program for Control of Equipment & Concrete Released from Restricted Area ML20236R0811998-07-15015 July 1998 Insp Rept 70-0925/98-01 on 980513-0625.No Violations Noted. Major Areas Inspected:Review of Final Status Survey Records & Collecting Soil Samples from Pit 3 Lift 3 to Confirm Compliance W/License & BTP Option 2 Soil Limits ML20216H3751998-03-18018 March 1998 Insp Rept 70-0925/97-03 on 971117-980302.No Violations Noted.Major Areas Inspected:Decommissioning,Closeout Survey & Site Status ML20151L0561997-07-31031 July 1997 Insp Rept 70-0925/97-02 on 970520-21 & 27.No Violations Noted.Major Areas Inspected:Site Status,Radioactive Waste Shipments,Radiation Protection Program,Waste Mgt,Environ Monitoring Program & Followup of Previous Insp Issues ML0926802941997-04-11011 April 1997 IR 07000925-97-001 on 03/26/1997 for Cimarron Corporation ML20135F4951996-12-10010 December 1996 Insp Rept 70-0925/96-02 on 961104-07.No Violations Noted. Major Areas Inspected:Review of Site Status,Management, Organization & Controls,Radiation Protection Program, Environmental Program & Followup of Previous Insp Issues ML0926606751996-03-29029 March 1996 IR 07000925-96-001, on 03/06/1996 - 03/07/1996, for Kerr-McGee Facility. Cover Letter ML0926606761996-03-29029 March 1996 IR 07000925-96-001, on 03/06-07/1996, for Kerr-McGee Facility, Routine, Announced Inspection of the Final Survey Program and Related Activities ML0926602871995-12-11011 December 1995 IR 07000925-95-002, on 10/17/1995 -10/19/1995, for Cimarron Corporation Consisting of Review of the Phase I Final Survey Program and Related Activities, Cover Letter ML0926602881995-12-0707 December 1995 IR 07000925-95-002, on 10/17-19/1995, for Kerr-McGee Corp, Cimarron Uranium Plant, Inspection of the Phase I Final Survey Program and Related Activities ML0926602901995-02-16016 February 1995 IR 07000925-95-001, on 01/30 - 02/01/1995, for Kerr-McGee Corp, Cimarron Uranium Plant ML0926602911995-01-20020 January 1995 IR 07000925-94-001, on 11/17/1994 - 11/18/1994, for Kerr-McGee Corporation, Cover Letter ML0926602921995-01-18018 January 1995 IR 07000925-94-001, on 11/17-18/1994, for Kerr-McGee Corp, Cimarron Uranium Plant ML20246J0861989-05-10010 May 1989 Safety Insp Repts 70-0925/89-01 & 70-1193/89-01 on 890403-04.No Violations Noted.Major Areas Inspected:Mgt & Organization Controls,Radiation Protection,Operations Review & Transportation Activities ML20155K2971988-06-14014 June 1988 Insp Repts 70-0925/88-01 & 70-1193/88-01 on 880509-12,19,24 & 0602 & 06.No Violations Noted.Major Areas Inspected:Mgt & Organization Controls,Radiation Protection Program, Operations Review & Waste Generator Requirements ML20149E2901988-01-0707 January 1988 Safety Insp Repts 70-0925/87-02 & 70-1193/87-03 on 871207-09.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection Program,Operation Review, Transportation & Radwaste Audits & Procedures IR 07100130/20120011987-12-14014 December 1987 Partially Withheld Matl Control & Accountability Insp Rept 70-1193/87-02 on 871130-1201 (Ref 10CFR2.790).Major Areas Inspected:Matl Control & Accountability Insp,Including Shipping & Receiving of Snm,Storage,Inventory & Records ML20236G8811987-07-29029 July 1987 Safety Insp Repts 70-0925/87-01 & 70-1193/87-01 on 870609-12 & 0724.Violation Noted.Major Areas Inspected:Nuclear Criticality Safety,Mgt Organization & Control,Radiation Protection & Radwaste Mgt ML20210H3381986-09-22022 September 1986 Safety Insp Repts 70-0925/86-02 & 70-1193/86-02 on 860818-22.Violation Noted:Failure to Make Timely Submittal of Effluent Monitoring Rept ML20209D1651986-08-15015 August 1986 RO Insp Rept 70-1193/73-03 on 720117-730312.Noncompliances Illegible ML20137U0351986-02-10010 February 1986 Insp Repts 70-0925/86-01 & 70-1193/86-01 on 860106-10.No Violations or Deviations Noted.Major Areas Inspected: Organization,Nuclear Criticality Safety,Radiation Protection Program,Training,Operations Review & Transportation IR 05000624/20070191985-07-26026 July 1985 Insp Repts 70-0925/85-01 & 70-1193/85-01 on 850624-0719.No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Program,Training,Operations Review, Transportation,Radwaste & Audits & Procedures ML20215F1481984-06-29029 June 1984 Partially Withheld Details of Insp Rept 70-1193/84-04 on 840531-0601.Major Areas Inspected:Security Plan & Implementing Procedures,Organization,Physical Barriers & Access Control ML20215F1591984-03-31031 March 1984 Partially Withheld Details of Insp.Major Areas Inspected: Inventory,Records & Repts,Storage & Internal Controls, Measurements & Statistical Controls & Facility Organization ML20215F1561983-05-0606 May 1983 Partially Withheld Details of Insp Repts 70-0925/83-02 & 70-1193/83-03 on 830502-09.No Noncompliance Noted.Major Areas Inspected:Facility Organization,Measurement & Statistical Controls & Storage & Internal Controls ML20215F1431983-02-11011 February 1983 Partially Withheld Details of Insp Rept 70-1193/83-01 on 830117-21.Violation Noted:Portion of Perimeter Fence Not Properly Maintained IA-86-576, Partially Withheld Details of Insp Repts 70-0925/82-02 & 70-1193/82-02.No Noncompliance Noted.Major Areas Inspected: Security Organization,Training,Guard Qualification,Physical Barriers,Intrusion & Detection Alarms & Key Control1982-03-31031 March 1982 Partially Withheld Details of Insp Repts 70-0925/82-02 & 70-1193/82-02.No Noncompliance Noted.Major Areas Inspected: Security Organization,Training,Guard Qualification,Physical Barriers,Intrusion & Detection Alarms & Key Control ML20215F1691982-03-31031 March 1982 Partially Withheld Details of Insp Repts 70-0925/82-02 & 70-1193/82-02.No Noncompliance Noted.Major Areas Inspected: Security Organization,Training,Guard Qualification,Physical Barriers,Intrusion & Detection Alarms & Key Control ML20244B6411981-11-18018 November 1981 IE Insp Rept 70-0925/81-03 on 810715-16.Noncompliance Noted: Failure to Make Suitable Measurement of Airborne Radioactivity ML20215F1341981-06-15015 June 1981 Partially Withheld Insp Repts 70-0925/81-02 & 70-1193/81-02 on 810505-08.No Noncompliance Noted.Major Areas Inspected: Organization,Operations,Internal Audits,Training,Radiation Exposure Control,Security & Physical Barriers ML20215F1211981-02-19019 February 1981 Partially Withheld Details of Insp Repts 70-0925/81-01 & 70-1193/81-01 on 810126-29.Violations Noted:Failure to Measure Stds for NDA Measurements on Pu Wastes & Failure to Use Acceptable tamper-safe Seals on Hand ML19341D2651981-02-19019 February 1981 IE Insp Repts 70-0925/81-01 & 70-1193/81-01 on 810126-29. Noncompliance Noted:Unauthorized Possession of U W/ Enrichment Greater than 5% & Failure to Use Acceptable Tamper Safe Seals.Details Withheld (Ref 10CFR2.790) ML19290G7161980-11-10010 November 1980 IE Insp Repts 70-0925/80-03 & 70-1193/80-05 on 800930-1002. No Noncompliance Noted.Major Areas Inspected:Facility Changes & Mods,Radwaste Mgt & Licensee Actions on Previous Insp Findings ML19264A4221980-07-15015 July 1980 IE Insp Rept 70-1193/80-04 on 800612-13.Cover Sheet, Indicating Correction Encl ML19320B7271980-07-0101 July 1980 IE Insp Rept 70-1193/80-03 on 800612-13.No Noncompliance Noted.Major Areas Inspected:Nuclear Matl Control & Accounting.Details Withheld (Ref 10CFR2.790) ML19329G0551980-06-20020 June 1980 IE Insp Rept 70-0925/80-04 on 800610-12.No Noncompliance Noted.Major Areas Inspected:Facility Organization & Operation,Measurement & Statistical Details & Physical Inventory.Details Withheld (Ref 10CFR2.790) ML19320C5141980-06-12012 June 1980 IE Insp Repts 70-0925/80-02 & 70-1193/80-02 on 800407-08. Noncompliance Noted:Empty,Open 55-gallon Drums Were Found in Waste Shipment Storage Room 121 ML19305E2301980-02-28028 February 1980 IE Insp Repts 70-0925/80-01 & 70-1193/80-01 on 800206-07. Noncompliance Noted:Possession of SNM W/Enrichment Greater than Authorized by License 2024-04-25
[Table view] Category:NRC-GENERATED
MONTHYEARML20216F2151999-09-14014 September 1999 Insp Rept 70-0925/99-01 on 990709-0817.No Violations Noted. Major Areas Inspected:Reviewing Final Status Survey Records & Collecting Soil Samples from sub-area O,Waste Ponds 1 & 2 to Confirm Compliance with License ML20155H7871998-11-0303 November 1998 Insp Rept 70-0925/98-02 on 980922-1022.No Violations Noted. Major Areas Inspected:Continuation of Confirmatory Survey Process & Review of Program for Control of Equipment & Concrete Released from Restricted Area ML20236R0811998-07-15015 July 1998 Insp Rept 70-0925/98-01 on 980513-0625.No Violations Noted. Major Areas Inspected:Review of Final Status Survey Records & Collecting Soil Samples from Pit 3 Lift 3 to Confirm Compliance W/License & BTP Option 2 Soil Limits ML20216H3751998-03-18018 March 1998 Insp Rept 70-0925/97-03 on 971117-980302.No Violations Noted.Major Areas Inspected:Decommissioning,Closeout Survey & Site Status ML20151L0561997-07-31031 July 1997 Insp Rept 70-0925/97-02 on 970520-21 & 27.No Violations Noted.Major Areas Inspected:Site Status,Radioactive Waste Shipments,Radiation Protection Program,Waste Mgt,Environ Monitoring Program & Followup of Previous Insp Issues ML20135F4951996-12-10010 December 1996 Insp Rept 70-0925/96-02 on 961104-07.No Violations Noted. Major Areas Inspected:Review of Site Status,Management, Organization & Controls,Radiation Protection Program, Environmental Program & Followup of Previous Insp Issues ML20246J0861989-05-10010 May 1989 Safety Insp Repts 70-0925/89-01 & 70-1193/89-01 on 890403-04.No Violations Noted.Major Areas Inspected:Mgt & Organization Controls,Radiation Protection,Operations Review & Transportation Activities ML20155K2971988-06-14014 June 1988 Insp Repts 70-0925/88-01 & 70-1193/88-01 on 880509-12,19,24 & 0602 & 06.No Violations Noted.Major Areas Inspected:Mgt & Organization Controls,Radiation Protection Program, Operations Review & Waste Generator Requirements ML20149E2901988-01-0707 January 1988 Safety Insp Repts 70-0925/87-02 & 70-1193/87-03 on 871207-09.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection Program,Operation Review, Transportation & Radwaste Audits & Procedures IR 07100130/20120011987-12-14014 December 1987 Partially Withheld Matl Control & Accountability Insp Rept 70-1193/87-02 on 871130-1201 (Ref 10CFR2.790).Major Areas Inspected:Matl Control & Accountability Insp,Including Shipping & Receiving of Snm,Storage,Inventory & Records ML20236G8811987-07-29029 July 1987 Safety Insp Repts 70-0925/87-01 & 70-1193/87-01 on 870609-12 & 0724.Violation Noted.Major Areas Inspected:Nuclear Criticality Safety,Mgt Organization & Control,Radiation Protection & Radwaste Mgt ML20210H3381986-09-22022 September 1986 Safety Insp Repts 70-0925/86-02 & 70-1193/86-02 on 860818-22.Violation Noted:Failure to Make Timely Submittal of Effluent Monitoring Rept ML20209D1651986-08-15015 August 1986 RO Insp Rept 70-1193/73-03 on 720117-730312.Noncompliances Illegible ML20137U0351986-02-10010 February 1986 Insp Repts 70-0925/86-01 & 70-1193/86-01 on 860106-10.No Violations or Deviations Noted.Major Areas Inspected: Organization,Nuclear Criticality Safety,Radiation Protection Program,Training,Operations Review & Transportation IR 05000624/20070191985-07-26026 July 1985 Insp Repts 70-0925/85-01 & 70-1193/85-01 on 850624-0719.No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Program,Training,Operations Review, Transportation,Radwaste & Audits & Procedures ML20215F1481984-06-29029 June 1984 Partially Withheld Details of Insp Rept 70-1193/84-04 on 840531-0601.Major Areas Inspected:Security Plan & Implementing Procedures,Organization,Physical Barriers & Access Control ML20215F1591984-03-31031 March 1984 Partially Withheld Details of Insp.Major Areas Inspected: Inventory,Records & Repts,Storage & Internal Controls, Measurements & Statistical Controls & Facility Organization ML20215F1561983-05-0606 May 1983 Partially Withheld Details of Insp Repts 70-0925/83-02 & 70-1193/83-03 on 830502-09.No Noncompliance Noted.Major Areas Inspected:Facility Organization,Measurement & Statistical Controls & Storage & Internal Controls ML20215F1431983-02-11011 February 1983 Partially Withheld Details of Insp Rept 70-1193/83-01 on 830117-21.Violation Noted:Portion of Perimeter Fence Not Properly Maintained ML20215F1691982-03-31031 March 1982 Partially Withheld Details of Insp Repts 70-0925/82-02 & 70-1193/82-02.No Noncompliance Noted.Major Areas Inspected: Security Organization,Training,Guard Qualification,Physical Barriers,Intrusion & Detection Alarms & Key Control IA-86-576, Partially Withheld Details of Insp Repts 70-0925/82-02 & 70-1193/82-02.No Noncompliance Noted.Major Areas Inspected: Security Organization,Training,Guard Qualification,Physical Barriers,Intrusion & Detection Alarms & Key Control1982-03-31031 March 1982 Partially Withheld Details of Insp Repts 70-0925/82-02 & 70-1193/82-02.No Noncompliance Noted.Major Areas Inspected: Security Organization,Training,Guard Qualification,Physical Barriers,Intrusion & Detection Alarms & Key Control ML20244B6411981-11-18018 November 1981 IE Insp Rept 70-0925/81-03 on 810715-16.Noncompliance Noted: Failure to Make Suitable Measurement of Airborne Radioactivity ML20215F1341981-06-15015 June 1981 Partially Withheld Insp Repts 70-0925/81-02 & 70-1193/81-02 on 810505-08.No Noncompliance Noted.Major Areas Inspected: Organization,Operations,Internal Audits,Training,Radiation Exposure Control,Security & Physical Barriers ML20215F1211981-02-19019 February 1981 Partially Withheld Details of Insp Repts 70-0925/81-01 & 70-1193/81-01 on 810126-29.Violations Noted:Failure to Measure Stds for NDA Measurements on Pu Wastes & Failure to Use Acceptable tamper-safe Seals on Hand ML19341D2651981-02-19019 February 1981 IE Insp Repts 70-0925/81-01 & 70-1193/81-01 on 810126-29. Noncompliance Noted:Unauthorized Possession of U W/ Enrichment Greater than 5% & Failure to Use Acceptable Tamper Safe Seals.Details Withheld (Ref 10CFR2.790) ML19290G7161980-11-10010 November 1980 IE Insp Repts 70-0925/80-03 & 70-1193/80-05 on 800930-1002. No Noncompliance Noted.Major Areas Inspected:Facility Changes & Mods,Radwaste Mgt & Licensee Actions on Previous Insp Findings ML19264A4221980-07-15015 July 1980 IE Insp Rept 70-1193/80-04 on 800612-13.Cover Sheet, Indicating Correction Encl ML19320B7271980-07-0101 July 1980 IE Insp Rept 70-1193/80-03 on 800612-13.No Noncompliance Noted.Major Areas Inspected:Nuclear Matl Control & Accounting.Details Withheld (Ref 10CFR2.790) ML19329G0551980-06-20020 June 1980 IE Insp Rept 70-0925/80-04 on 800610-12.No Noncompliance Noted.Major Areas Inspected:Facility Organization & Operation,Measurement & Statistical Details & Physical Inventory.Details Withheld (Ref 10CFR2.790) ML19320C5141980-06-12012 June 1980 IE Insp Repts 70-0925/80-02 & 70-1193/80-02 on 800407-08. Noncompliance Noted:Empty,Open 55-gallon Drums Were Found in Waste Shipment Storage Room 121 ML19305E2301980-02-28028 February 1980 IE Insp Repts 70-0925/80-01 & 70-1193/80-01 on 800206-07. Noncompliance Noted:Possession of SNM W/Enrichment Greater than Authorized by License ML19296B6391980-01-0707 January 1980 IE Insp Repts 70-0925/79-05 & 70-1193/79-05 on 791203.No Noncompliance Noted.Major Areas Inspected:Ie Bulletin 79-19, Radiation Protection Aspects of Solvent Extraction Sys Dismantling & Solid Waste Disposal & Shipping Procedures ML19247A7491979-07-0909 July 1979 IE Insp Rpet 70-1193/79-03 on 790614-15.No Noncompliance Noted.Major Areas Inspected:Nuclear Matl Control & Accountability.Details Withheld (Ref 10CFR2.790) ML19289E3471979-03-20020 March 1979 IE Insp Rept 70-925/79-01 on 790307-09.No Noncompliance Noted.Major Areas Inspected:Nuclear Matl Control & Accounting ML19289E0001979-02-16016 February 1979 IE Insp Rept 70-1193/79-01 on 790223-26.Noncompliance Noted: Security Organization & Access Controls.Details Withheld (Ref 10CFR2.790) ML20211L4771978-08-0202 August 1978 Insp Repts 70-0925/78-02 & 70-1193/78-03 on 780710-12.No Noncompliance or Deviation Noted.Major Areas Inspected: Radiation Protection Program Radwaste Mgt,Solid Wastes,Waste Burial & Retention Ponds ML20207N5911975-06-0909 June 1975 Partially Deleted RO Insp Rept 70-1193/75-07 on 750520-22. Violations Noted:Change Made in Approved Security Plan Which Would Decrease Effectiveness & Prior Approval of Change Not Solicited or Received from NRC ML20215L7281975-04-24024 April 1975 Insp Rept 70-1193/75-04 on 750306-12.Noncompliances Noted: Transfers of Pu from Operating Hoods & Boxes Not Observed & Accompanied by Safeguards Clerk or Designated Individual & Entrances to General Lab Not Panic Locked ML20207N6351975-03-18018 March 1975 Partially Deleted Insp Rept 70-1193/75-01 on 750218-22. Noncompliances Noted:Radiotelephone in Transport Tractor Inoperable During Shipment of Matl & Only One of Eight Driver/Guards Requalified within 6-month Requirement ML20198A6861975-01-22022 January 1975 Insp Rept 70-0925/74-06 on 741219-20.No Violation Noted. Major Areas Inspected:Ground Outside Pellet Mfg Bldg within Licensee Perimeter Fence ML20207N6021974-09-30030 September 1974 Partially Deleted RO Insp Rept 70-1193/74-08 on 740911. Violations Noted:Installed Explosive Detector Not Being Maintained & Dock Air Lock Door Not Equipped W/Magnetic Switch Type Intrusion Alarm ML20215L6851974-09-24024 September 1974 RO Insp Rept 70-1193/74-07 on 740821-23.Noncompliances Noted:Implemented Stds Program Not in Full Compliance W/ License Condition Since Required Frequency in Measurements of Radioassay Stds Not Achieved ML20215L6731974-08-21021 August 1974 RO Insp Rept 70-1193/74-06 on 740723-25.Violation Noted:On Three Occasions,When Delayed Measurements Were Made,Licensee Failed to Complete & Rept Measurements on Form AEC-741 within 30 Days ML20215L5501974-05-31031 May 1974 Discusses Insp 70-1193/74-04 on 740506-09 & Forwards Notice of Violation ML20207N5641974-05-28028 May 1974 Partially Deleted RO Insp Rept 70-1193/74-04 on 740506-09. Violations Noted:Tv Camera Not Relocated Inside Dock Area to Provide Immediate Visual Capability of Guard Upon Activation of Pu Monitor Alarm ML20215L5261974-04-15015 April 1974 RO Insp Rept 70-1193/74-03 on 740226-27.Major Areas Inspected:Facility Organization & Operation,Measurements & Statistical Controls,Shipping & Receiving,Storage & Internal Transfers,Inventory & Repts & Records ML20207N5321974-03-11011 March 1974 Partially Deleted RO Insp Rept 70-1193/74-02 on 740311-13. Noncompliance Noted:Combination Lock on Matl Storage Vault Broken & Inoperable & Visitor Log Sheet Did Not Provide Purpose of Visit ML20209D2021974-02-13013 February 1974 RO SNM Insp Rept 70-1193/73-08 on 731203-07.Noncompliance Noted:Limit of Error Associated W/Muf Exceeded 1.5 Kg Pu. Supporting Documentation Encl.Portions of Rept Details Illegible ML20207N4731973-02-16016 February 1973 Partially Deleted RO Insp Rept 70-1193/73-01 on 730114-16. Noncompliance Noted:Permanent Cement Structure Housing Transformers & Emergency Power Supply Sys Located within 15 to 20 Ft Inside Perimeter Fence 1999-09-14
[Table view] Category:TEXT-INSPECTION & AUDIT & I&E CIRCULARS
MONTHYEARML20216F2151999-09-14014 September 1999 Insp Rept 70-0925/99-01 on 990709-0817.No Violations Noted. Major Areas Inspected:Reviewing Final Status Survey Records & Collecting Soil Samples from sub-area O,Waste Ponds 1 & 2 to Confirm Compliance with License ML20155H7871998-11-0303 November 1998 Insp Rept 70-0925/98-02 on 980922-1022.No Violations Noted. Major Areas Inspected:Continuation of Confirmatory Survey Process & Review of Program for Control of Equipment & Concrete Released from Restricted Area ML20236R0811998-07-15015 July 1998 Insp Rept 70-0925/98-01 on 980513-0625.No Violations Noted. Major Areas Inspected:Review of Final Status Survey Records & Collecting Soil Samples from Pit 3 Lift 3 to Confirm Compliance W/License & BTP Option 2 Soil Limits ML20216H3751998-03-18018 March 1998 Insp Rept 70-0925/97-03 on 971117-980302.No Violations Noted.Major Areas Inspected:Decommissioning,Closeout Survey & Site Status ML20151L0561997-07-31031 July 1997 Insp Rept 70-0925/97-02 on 970520-21 & 27.No Violations Noted.Major Areas Inspected:Site Status,Radioactive Waste Shipments,Radiation Protection Program,Waste Mgt,Environ Monitoring Program & Followup of Previous Insp Issues ML20135F4951996-12-10010 December 1996 Insp Rept 70-0925/96-02 on 961104-07.No Violations Noted. Major Areas Inspected:Review of Site Status,Management, Organization & Controls,Radiation Protection Program, Environmental Program & Followup of Previous Insp Issues ML20246J0861989-05-10010 May 1989 Safety Insp Repts 70-0925/89-01 & 70-1193/89-01 on 890403-04.No Violations Noted.Major Areas Inspected:Mgt & Organization Controls,Radiation Protection,Operations Review & Transportation Activities ML20155K2971988-06-14014 June 1988 Insp Repts 70-0925/88-01 & 70-1193/88-01 on 880509-12,19,24 & 0602 & 06.No Violations Noted.Major Areas Inspected:Mgt & Organization Controls,Radiation Protection Program, Operations Review & Waste Generator Requirements ML20149E2901988-01-0707 January 1988 Safety Insp Repts 70-0925/87-02 & 70-1193/87-03 on 871207-09.No Violations or Deviations Noted.Major Areas Inspected:Radiation Protection Program,Operation Review, Transportation & Radwaste Audits & Procedures IR 07100130/20120011987-12-14014 December 1987 Partially Withheld Matl Control & Accountability Insp Rept 70-1193/87-02 on 871130-1201 (Ref 10CFR2.790).Major Areas Inspected:Matl Control & Accountability Insp,Including Shipping & Receiving of Snm,Storage,Inventory & Records ML20236G8811987-07-29029 July 1987 Safety Insp Repts 70-0925/87-01 & 70-1193/87-01 on 870609-12 & 0724.Violation Noted.Major Areas Inspected:Nuclear Criticality Safety,Mgt Organization & Control,Radiation Protection & Radwaste Mgt ML20236G8701987-07-29029 July 1987 Notice of Violation from Insp on 870609-12.Violation Noted: Radiological Surveys Not Conducted in Personnel Change Rooms in U Plant During Mar-Apr 1987,contrary to License Condition 16 ML20210H3271986-09-22022 September 1986 Notice of Violation from Insp on 860818-22 ML20210H3381986-09-22022 September 1986 Safety Insp Repts 70-0925/86-02 & 70-1193/86-02 on 860818-22.Violation Noted:Failure to Make Timely Submittal of Effluent Monitoring Rept ML20209D1651986-08-15015 August 1986 RO Insp Rept 70-1193/73-03 on 720117-730312.Noncompliances Illegible ML20137U0351986-02-10010 February 1986 Insp Repts 70-0925/86-01 & 70-1193/86-01 on 860106-10.No Violations or Deviations Noted.Major Areas Inspected: Organization,Nuclear Criticality Safety,Radiation Protection Program,Training,Operations Review & Transportation IR 05000624/20070191985-07-26026 July 1985 Insp Repts 70-0925/85-01 & 70-1193/85-01 on 850624-0719.No Violations or Deviations Noted.Major Areas Inspected: Radiation Protection Program,Training,Operations Review, Transportation,Radwaste & Audits & Procedures ML20215F1481984-06-29029 June 1984 Partially Withheld Details of Insp Rept 70-1193/84-04 on 840531-0601.Major Areas Inspected:Security Plan & Implementing Procedures,Organization,Physical Barriers & Access Control ML20215F1591984-03-31031 March 1984 Partially Withheld Details of Insp.Major Areas Inspected: Inventory,Records & Repts,Storage & Internal Controls, Measurements & Statistical Controls & Facility Organization ML20215F1561983-05-0606 May 1983 Partially Withheld Details of Insp Repts 70-0925/83-02 & 70-1193/83-03 on 830502-09.No Noncompliance Noted.Major Areas Inspected:Facility Organization,Measurement & Statistical Controls & Storage & Internal Controls ML20215F1431983-02-11011 February 1983 Partially Withheld Details of Insp Rept 70-1193/83-01 on 830117-21.Violation Noted:Portion of Perimeter Fence Not Properly Maintained ML20215F1371983-02-11011 February 1983 Partially Withheld Notice of Violation from Insp on 830117- 21 ML20215F1691982-03-31031 March 1982 Partially Withheld Details of Insp Repts 70-0925/82-02 & 70-1193/82-02.No Noncompliance Noted.Major Areas Inspected: Security Organization,Training,Guard Qualification,Physical Barriers,Intrusion & Detection Alarms & Key Control IA-86-576, Partially Withheld Details of Insp Repts 70-0925/82-02 & 70-1193/82-02.No Noncompliance Noted.Major Areas Inspected: Security Organization,Training,Guard Qualification,Physical Barriers,Intrusion & Detection Alarms & Key Control1982-03-31031 March 1982 Partially Withheld Details of Insp Repts 70-0925/82-02 & 70-1193/82-02.No Noncompliance Noted.Major Areas Inspected: Security Organization,Training,Guard Qualification,Physical Barriers,Intrusion & Detection Alarms & Key Control ML20244B6381981-11-19019 November 1981 Notice of Violation from Insp on 810715-16 ML20244B6411981-11-18018 November 1981 IE Insp Rept 70-0925/81-03 on 810715-16.Noncompliance Noted: Failure to Make Suitable Measurement of Airborne Radioactivity ML20215F1341981-06-15015 June 1981 Partially Withheld Insp Repts 70-0925/81-02 & 70-1193/81-02 on 810505-08.No Noncompliance Noted.Major Areas Inspected: Organization,Operations,Internal Audits,Training,Radiation Exposure Control,Security & Physical Barriers ML19341D2651981-02-19019 February 1981 IE Insp Repts 70-0925/81-01 & 70-1193/81-01 on 810126-29. Noncompliance Noted:Unauthorized Possession of U W/ Enrichment Greater than 5% & Failure to Use Acceptable Tamper Safe Seals.Details Withheld (Ref 10CFR2.790) ML19341D2541981-02-19019 February 1981 Notice of Violation from Insp on 810126-29 ML20215F1211981-02-19019 February 1981 Partially Withheld Details of Insp Repts 70-0925/81-01 & 70-1193/81-01 on 810126-29.Violations Noted:Failure to Measure Stds for NDA Measurements on Pu Wastes & Failure to Use Acceptable tamper-safe Seals on Hand ML19290G7161980-11-10010 November 1980 IE Insp Repts 70-0925/80-03 & 70-1193/80-05 on 800930-1002. No Noncompliance Noted.Major Areas Inspected:Facility Changes & Mods,Radwaste Mgt & Licensee Actions on Previous Insp Findings ML19264A4221980-07-15015 July 1980 IE Insp Rept 70-1193/80-04 on 800612-13.Cover Sheet, Indicating Correction Encl ML19320B7271980-07-0101 July 1980 IE Insp Rept 70-1193/80-03 on 800612-13.No Noncompliance Noted.Major Areas Inspected:Nuclear Matl Control & Accounting.Details Withheld (Ref 10CFR2.790) ML19329G0551980-06-20020 June 1980 IE Insp Rept 70-0925/80-04 on 800610-12.No Noncompliance Noted.Major Areas Inspected:Facility Organization & Operation,Measurement & Statistical Details & Physical Inventory.Details Withheld (Ref 10CFR2.790) ML19320C5141980-06-12012 June 1980 IE Insp Repts 70-0925/80-02 & 70-1193/80-02 on 800407-08. Noncompliance Noted:Empty,Open 55-gallon Drums Were Found in Waste Shipment Storage Room 121 ML19320C5111980-06-12012 June 1980 Notice of Violation from Insp on 800407-08 PNO-III-80-062A, on 800107 & 08,per Request,Employee Was Examined to Determine Whether He Received Intake of Pu While Employed from 1969-1972 at Plant.Exam Detected Neither Pu Nor Am1980-04-0202 April 1980 PNO-III-80-062A:on 800107 & 08,per Request,Employee Was Examined to Determine Whether He Received Intake of Pu While Employed from 1969-1972 at Plant.Exam Detected Neither Pu Nor Am ML19305E2301980-02-28028 February 1980 IE Insp Repts 70-0925/80-01 & 70-1193/80-01 on 800206-07. Noncompliance Noted:Possession of SNM W/Enrichment Greater than Authorized by License ML19296B6391980-01-0707 January 1980 IE Insp Repts 70-0925/79-05 & 70-1193/79-05 on 791203.No Noncompliance Noted.Major Areas Inspected:Ie Bulletin 79-19, Radiation Protection Aspects of Solvent Extraction Sys Dismantling & Solid Waste Disposal & Shipping Procedures PNO-III-79-062, on 791207,atty for Former Kerr-Mcgee Nuclear Corp Employee Requested Examination to Determine Whether Client Received Significant Intake of Pu During 1969-1972 at Cimarron Plant1979-12-14014 December 1979 PNO-III-79-062:on 791207,atty for Former Kerr-Mcgee Nuclear Corp Employee Requested Examination to Determine Whether Client Received Significant Intake of Pu During 1969-1972 at Cimarron Plant ML19210E2001979-10-30030 October 1979 Notice of Violation from Insp on 790827-29 & 0926-27 ML19247A7491979-07-0909 July 1979 IE Insp Rpet 70-1193/79-03 on 790614-15.No Noncompliance Noted.Major Areas Inspected:Nuclear Matl Control & Accountability.Details Withheld (Ref 10CFR2.790) ML19289E3471979-03-20020 March 1979 IE Insp Rept 70-925/79-01 on 790307-09.No Noncompliance Noted.Major Areas Inspected:Nuclear Matl Control & Accounting ML19289E0001979-02-16016 February 1979 IE Insp Rept 70-1193/79-01 on 790223-26.Noncompliance Noted: Security Organization & Access Controls.Details Withheld (Ref 10CFR2.790) ML20211L4771978-08-0202 August 1978 Insp Repts 70-0925/78-02 & 70-1193/78-03 on 780710-12.No Noncompliance or Deviation Noted.Major Areas Inspected: Radiation Protection Program Radwaste Mgt,Solid Wastes,Waste Burial & Retention Ponds ML20136E4461975-08-14014 August 1975 Investigation Rept 70-1193/75-09 on 750714-15.Noncompliance Noted:Packaging Matls Not Compatible W/Contents Per 10CFR71.12(b) & 71.31(a) ML20207N5911975-06-0909 June 1975 Partially Deleted RO Insp Rept 70-1193/75-07 on 750520-22. Violations Noted:Change Made in Approved Security Plan Which Would Decrease Effectiveness & Prior Approval of Change Not Solicited or Received from NRC ML20209D3311975-04-24024 April 1975 Notice of Noncompliance from Insp on 750306-12.Infractions Noted:Transfer of Pu from Operating Hoods & Boxes Not Observed & Accompanied by Safeguards Clerk & Two Entrances Into Lab Not Panic Locked ML20215L7281975-04-24024 April 1975 Insp Rept 70-1193/75-04 on 750306-12.Noncompliances Noted: Transfers of Pu from Operating Hoods & Boxes Not Observed & Accompanied by Safeguards Clerk or Designated Individual & Entrances to General Lab Not Panic Locked IA-86-281, Notice of Violation from Insp on 750218-22.Infraction Noted: During Shipment on 740720-24,radiotelephone in Transport Tractor Inoperable for Outboard Portion of Round Trip1975-03-19019 March 1975 Notice of Violation from Insp on 750218-22.Infraction Noted: During Shipment on 740720-24,radiotelephone in Transport Tractor Inoperable for Outboard Portion of Round Trip 1999-09-14
[Table view] |
Text
< mr i
]! f hI O
DETAILS 1.
Persons Contacted
- A. W. Norwood, Standby Plant Manager
- R. Fine, Health and Safety Supervisor
- M. Hodo, Administration and Accountability Clerk
- V. Richards, Decontamination Supervisor and Custodian
- J. L. Kegin, Maintenance and Utility Supervisor
- R. Borgmier, Decontamination Supervisor
- W. Rhodes, Decontamination Supervisor
- Denotes those present at the exit interview.
2.
Licensee Action on Previous Inspection Findings (Closed) Noncompliance - Severity Level VI (70-1193/81-01): Failure to measure { standards 3uring the week NDA measurements were made on lutonium wastes. Status: Once per month'(each standard is sampled
~
0 times with higher and lower limits)to establish control charts, standard] The inspector's review of th(is documentation indicated-ver compliance. Also, the review of the Plutonium Plant Shift Routine form documented the completion of(five counts per standard)n each Monday and Wednesday.
(Closed) Noncompliance - Severity Level V (70-925/81-01): Unauthorized possession of enriched uranium greater than@ercent enrichment.
Status: Amendment No. 5 to SNM-928 dated June 9, 1981, includes condi-tien No. 17 which permits, if during decontamination of the uranium plant and equipment, uranium solutions compounds are generated that have U-235 isotope content greater tha 5 ercent, prompt action shall betakentodegradethesematerialsbelow5)ercentU-235. The licensee was found in compliance with this requirement.
(Closed) Noncompliance - Severity Level VI (70-1193/81-01): Failure todocumenttransfersfromMBA50toMBA12(Vault) Status: Vaste cards are prepared for the transfer of material from HBA50 to MBA12 which reflect a description of the material, NDA values, date of trans-fer, and signed by the MBA50 custodian. These waste cards stay with each drum and are inserted into each waste drum packaged. In addition, a listing of waste card material is maintained in the NDA log by the Health and Safety Supervisor and provides traceability for each item in the drums stored ir(room 121)for subsequent shipment.
(Closed) Noncompliance - Severity Level VI (70-1193/81-01): Failure to use acceptable (tamper-safe seals 3 Nonco 11ance with Licerg e Condition 7.4 of MPP-3.
Status: All drums ealed in room 12 y and S-F3 # #I 2
Cop M of 6 copie THIS E ' b i'T IS Z'? TC REPRODUCED WITHOUT SPECI 8612230290 B W 19 APPROVAL OF RIII hLE
--576 PDR
(
(
containersinthe,hault}ith0.53gramsormorewerebaled3Rith ofHPP-3.{ypeEmetalseals acceptable o comply with License Condition 7.4 3.
Exit Interview The inspector met with licensee representatives (denoted in paragraph
- 1) at the conclusion of the inspection on April 8,1982. The inspector summarized the reviews conducted, scope and findings of the inspection, and status of the previous items of noncompliance (70-925/81-01; 70-1193/81-01), and noted that no items of noncompliance were revealed as a result of this inspection. The inspector did suggest, however, that the material control and accounting procedures be revised to include a description for the use of waste cards in transferring material from MBA 50(drum waste storage) to MBA 12{ Vault 3for packaging. Licensee representatives noted suggestion.
4.
Facility Organization No items of noncompliance were noted.
The inspection results were attained through review of uranium and plutonium procedures, and discussions with licensee personnel.
There have been no major changes in the site organization as it pertains to the Standby Operation.
About 13 new employees have been hired and five lost to other Kerr McGee divisions which resulted in a net increase of eight employees.
A Decontamination Supervisor position has been created.
At present, the number of employees including the Standby Operation Manager, Supervisors, and Guards is 38.
On the Corporate level, Mr. B. E. Brown, General Manager, Nuclear Manufacturing, to whom the Standby Operations Manager reported, was transferred in September 1981 to the position of Manager of the Southwest Refining Corporation, Corpus Christi, Texas (a subsidiary of Kerr McGee). From September 1981 to January 1981, the Standby Manager reported to Mr. R. P. Luke, Executive Vice President of the Kerr McGee Nuclear Corporation.
Effective in January 1982, Mr. M. H. Binstock, Director, Contract Manage =ent and Cimarron Opera-tions became the responsible individual to whom the Standby Operations Manager reports.
Other than plutonium plant MBA custodians, the primary responsibility for material control and accountability still rests with the Standby Operations Manager, Health and Safety Supervisor, and Administration and Accountability Clerk.
5.
Facility Operations No items of nonccmpliance were noted. The inspection results were attained through a review and observation of uranium and plutonium 3
(
f plant operations, review of internal procedures, and interviews with key personnel.
Uranium Plant Decontamination and cleanup of the uranium plant continues. Most equipment from the Wet Ceramic Process Area has been removed and all the equipment from ceramic line two has either been sold, transferred to other Kerr McGee facilities, or if not usable, shipped to waste.
Most of ceramic line one equipment has been removed but the licensee has a 20 foot calciner that has not yet been decontaminated.
In the pellet area, one grinder and one pellet press has been decontaminated, but most pellet area equipment,is still on hand and this area is currently being worked as time permits.
"Ihe pellet process area has about one year's cleanup and decontamination to be completed.
The remainder of the scrap processing and storage areas will also require about a year's cleanup and decontamination work. About 50 percent of the equipment in this area has been removed in order to provide space for decontamination. The uranium plant could be finished by the end of 1984.
Escalated transportation and burial costs may result in usable equipment (decontaminated, if possible) being sold as scrap metal if it cannot otherwise be disposed. At least another year could be required for the decontamination of usable equipment that has been removed.
Plutonium Plant The licensee is currently engaged in Project III (removal of the solvent extraction system) of its Termination Plan dated November 29, 1978. All equipeent has been removed with glovebox 27A about 75 percent removed; this project should be finished by July or August 1982.
Project IV, as described by the Termination Plan dated January 8,1980, involves the removal of remaining plant equip =ent.
All equipment has been removed fromgoom 12} (rod loading, welding, testing, and x-ray).
hoom 1233 presently being utililized for equipment decontamination, is being planned for thehurt@iBA for waste shipment storage. Pro-jected date for completion of Project IV is the end of 1984.
koom 123)as been approved for a storage MBA for packaged waste material awaiting shipment as indicated in the SNM-1174 Termination Plan approved by letter dated October 8, 1980, from Advanced Fuel and Spent Fuel Licensing Branch, Division of Fuel Cycle and Material Safety. Procedures are bein revised to include this MBA and installa-pg, 3 tion of
}S'f)
H g
An amendment for reactivation of the ion exchange system for removal
, u r *.
of plutonium from decontamination solutions was submitted to NRC by the Corporate office on March 24, 1982. On March 29, 1982, a sub-4
(
mittal was made for the renewal of License SNM-1174 and SNM-928 which were due to expire June 30, 1982.
A tentative date of January 1, 1985 is projected for completing the Termination Plan so that the plutonium building can be used for other purposes.
- ;dyL Measurements and Statistical Controls i
No items of noncocpliance were noted.
The inspection results were attained through a review of the NDA methods used in both the uranium and plutonium plants, review of internal records, and discussions with the Health and Safety Supervisor who has measurement responsi-bilities for NDA in both plants.
S.' ' *
- g.. i *. M Uranium Plant
, f, e.* p Uranium measurements are by gamma count'; and when necessary, isotopic analyses for percent U-235 are contracted out to Isotopic Analysis, Incorporated of Tulsa, Oklahoma.
During plant cleanup any uranium foundenrichedgreaterthan(5}ercent is immediately mixed with depleteduraniumanddegradatedtobelo(Shercentenrichment, this is authorized if the licens does not exceed its present authoriza-tion (after degradation) o kilograms)-23',enrichedtolessthan
]
(5 percent in the isotope U-235.
Good material degradated to natural as a liquid can be shipped to the Kerr McGee Sequoyah Plant as
" feed".
Nonusable material resulting from plant cleanup is picked up as an inventory gain and removed as a egg,syred discard (offsite burial). During the inspection perio
't?Ugrams of uranium and ha t;46f tgrams U-235 were removed to of fsite burial which involved
. C seveYshipments to Beatty, Nevada, and-six-shipments tr Harnwell, SoutlE-Es rol fra.
-J T
- c.._ ; < -
.e The application for use of the ion exchange system for separation of uranium should result in decreasing large waste accumulation and more timely measurement results.
limited measurement control i:The licensee is a Safeguards Group V with equirements with an authorization ofdwe noo.,:,-
Mkgram@-235 enriched to belowMpercent in the isotope U-235.
Limits of error (L.E. 's) were calculated and reported for thMkfsite waste shipments for the inspection period., -
w e.. s r, e,
1S.r' M.
,:s
- . e
.~
e Plutonium Plant is by NDA using ahudlum Gram determination in the plutonium lant Model25Scaledanda(y,aI(th)Crysta Standards in matrices and witQigher/ lower limits 3to establish control cha(rts.
geometrics appropriate for operations are sampled 20 times 3each month Each standard' is counted {five timepn both Monday and Wednesday of each week.
5 k
cM(
fOfthek,592gramh 59 rojected to be in the solvent extraction
, p f.;
ksystem,asofMarch4,Q77.792gramQU-235.$v1982,Q 214.208 gram a remaining balance of
~~
Non-transuranic material, previously known as non-line material, has a plutonium content limitation of(0003 grams)and each package for shipment to waste burial sites is limited to, ten nanocuries per gram in low specific activity (LSA) waste, p'rtheinspectionperiod,the licensee had shipped to waste buria
- drums f solid non-transuranic waste. As of the inspection, the licensee ha ackaged and sealed drumsofnon-transuranicwasteinfrees121(wsstestorageg WA Transuranic waste is waste with a plutonium content of greater than
[0003 grams)materialingloveboxes,andgloveboxitems.
The waste b@
resulting from the dismantling of the solvent extraction system is primiarily transuranic in excess of the LSA limit of ten nanocuries per gram. 'Ihe transuranic gram limit per package is grams h U for metal, glass, etc., and@ gramsjfor hydrogenous [ material such As of the inspection period, the licensee hadhhadaQd h as oil.
and sealed drums of transuranic waste in, men 121 (waste storage)dc
'A3A Shipping and Receiving. f;r No items of noncompliance were noted.
Inspection results were attained g
f,., q,. '
by review of records and Forms NRC-741.
.The licensee in its present standby status has had no external receipts.
9 ' 'A # ',' " ~ ".
Holdings in uranium are increased as a result of uranium plant cleanup
- y.. I.k ^" reported as an inve tgry difference gain. This recovered material is degradated if abov SJpercent enrichment and if usable,j liquid form,
,g~,
it is shipped as feed to the Sequoyah Plant.
If below5 ercent enrich-p ment and not usable, the material is drumged, for subse uent shipment to burial. During the inspectiong[eriod, 4-3 ship [ments of uranium were
'M d made to waste burial sites 80 075 gram totalri 3
waste comprising negative quantities $46 drum #o'f 'nos' transuranic grams U-235.
For the plutonium plant
~
(less than 1 gram) were shipped to U. S. Ecology, Beatty, Nevada.
8.
Storage and Internal Controls No items of noncompliance were noted. The inspection results were were attained by reviev of internal transfer documents and seal accountability in the plutonium plant.
ne entire uranium plant isconsidered(oneMB "Iherefore, internal transfers are not required. (amper-safe seals re controlled by the Administrative and Accountability Clerk (AAC) and stored in a fire resistant combination lock file cabinet for the uranium lant. 19eals3 are applied by the AAC and posted to the{ampersafe seal og and use is verified by the Health and Safety Supervisor. {ype C paper sea 1Q' are used in the uranium plant.
6
, _ ~
(
(
hamper-safeseals)intheplutoniumplantarecontrolledbytheHealth and Safety Supervisor and storage Custodians.
11 seals"%ppliedto containers are cross referenced on the interna transfer form and the drumisassignedthesamenumberasthehpliedseal) Signature on theinternaltransferformsignifyproperapplicationofthepea}
and witness by shipper and receiver signatures.
,hetaltypeEseal) pre-numberedfromnumberonetoonethousandwere accountedforasf89used{ealgand611unusegals],
Material resulting from dismantling in MBA50 oldup Plutonium and fieneral Laboratory and transferred to MBA1 Vaulthistransferred on waste cards whi accompany the drums.
en the drum is packaged each waste card representing items is inserted into the drum.
In addition, a listing of waste card material is maintained in the NDA Log by the Health and Safety Supervisor which allows for traceability of each item in the drums stored irhoom 121 (Waste Storage}for subsequent shipment.
Movement of SNM into and out of MBAs is based on measurement.
Losses can be localized, and discrete item control is on an MBA basis, 9.
Inventory No items of noncompliance were noted.
The inspection results were attained by physically accounting for all items in both the uranium and plutonium plants and review of inventory procedure.
Uranium Plant Physical inventories are being performed every six months as required by 10 CFR 70.51 and licensee procedure, KM-NU-15-8.
SNM Inventory Reports are submitted to NRC Region III within 30 days after the start of each ending physical inventory as required.
Except for the soda ash solution contained in tanks, the inspector physically verified the 14 drums of solids, 30 drums of drummed waste and 8 standards in storage at the uranium plant. The uranium inventory as of March 31, 1982, was (4,513 grams}uraniumandkS1 grams)-235describedasfollows:
.U.
U-235 a.
Solids 11,2227 I 302
~
b.
Soda Ash Solution 29,295 258
<262 c.
Drummed Waste 13,092 s
- (
v
(
d.
Standards 904 29 i
r Total L,,,513s(
82 54 i
l 77/b$
u
(
Plutonium Plant Physical inventories are being performed every 60 days as required by both 10 CFR 70.51 and licensee procedures. Reports of each inventory are submitted to NRC Region III as required. Except for the plutonium in MBA50{Glovebox holdup plutoniumgall SNM is stored in thehault)(MBA12) andQoom 121}hich consists of SNM packaged for shi ment to burial. The%y,ault)(MBA50) inventory was comprised of hour ' standards, an(ongTPu-238 neutron source.
consisted of g42prums of transuranic waste and(18){ rums of no
'Ihe oom12@BA transuranic waste which were physically verified b the ctor..
The plutonium inventory as of March 31, 1982, was
^'W' plutonium broken down by NBA as follows:
9 //M MBA Plutonium
/
12kault)3 h*
a.
hoom12h(WasteStorage) b.
50,hloveboxholdup) c.
Total 3
g Records and Reports No items of noncompliance were noted.
The inspection results were attained through review of licensee authorizations, licensee journal entries used to post uranium gains, blending and degradation resulting from cleanup, and Forms NRC-741 and NRC-742.
Amendment No. 5 to License SNM-928 dated June 9, 1981, from Uranium Fuel Licensing Branch, Division of Fuel Cycle and Material Safety allows for prompt action to degrade material greater tha(5)ercent enrichment generated as a result of plant decontamination. This change was needed to avoid a continuous state of noncoepliance for possessing enriched uranium enriched greater thadS)ercent.
Such material has been recovered and probably will continue since the f acility once processed high enriched uranium (above both(5 and 203 percent enrichments).
The only plutonium activity for the inspection period was the shipment of non-reportable SNM as.aon-transuranic material comprised of 16 3 jlO drums to waste burial and a deduction for plutonium,241 decay s
j(f0 I
Forms NRC-741 for the 13 uranium offsite burial shipments were traced tri to supporting data and agreed to the Facility Uranium Ledgers. Forms NRC-741 were prepared and distributed as required by 10 CFR 70.54 and related instructions.
8
CW(
All ledger entr,ies for enriched uranium for the period of inspection except for the 13 shipments to offsite burial, resulted from jourrial entries, a form provided as a source document to support ledger entries.
All journal entries were prepared to account for inventory difference gains due to plant cleanup, blending with depleted uranium, All journal entries were supported and traced to the facility (m
, percent.
agreed to Forms NRC-742 for periods ending March 1981, September 1981, and March 1982, signed by the Administration and Accountability Clerk, and approved by the Standby Operations Manager.
Recovery of enriched uranium greater tharhercent in the isotope U-235, resulting f rom plant cleanup, requires that it be promptly degradated to less thar{hpercent enrichment. This activity results Form NRC-742, the above@p[er] cent activity for the period o in a reopening of the above 5 percent uranium ledger and a separate is documented in Exhibit B of this report.
License No. SNM-Il74 authorizes possession of 11.475 kilograms of plutonium and.240 kilograms plutonium as samples and sealed sources for a total of 11.715 kilograms.
The licensee possesses a plutonium AseparateFormNRC-742ispr(eparedtoreport.0 grams)1utonium and(
238 neutron source containing this material type.
License N. SNM-928 authorizes possession of two kilograms U-235 not to exceed ercent enrichment in the isotope U-235.
Exhibits A and B document, respectively thelessthan(5)percentenricheduraniumand the greater thanhercen,t enriched uranium activity for the period of inspection (January 27, 1981 to March 31, 1982). Exhibit C reflects the plutonium activity for the same period.
Attachments:
1.
Exhibit A - Kerr McGee Nuclear Corporation Enriched Uranium Material Balance Statement Below 5 Percent 2.
Exhibit B - Kerr McGee Nuclear Corporation Enriched Uranium Above 5 Percent - Material Balance Statement 3.
Exhibit C - Kerr McGee Nuclear Corporation Plutonium Material Balance Statement 9
,,, _ _ _,. _, w.,.. _ g.
(
(
l l
Addendum 1 to Report 70-1193/82-02; 70-925/82-02 Kerr McGee Nuclear Corporation Docket No. 70-1193 1.
General i
During the routine MC&A inspection, the inspector reviewed and observed the physical security system including security organiza-tion, guard training and qualification, physical barriers, intrusion l
i detection alarms, records of events, access controls, and key control.
No items of noncompliance were noted.
2.
Security Organization The Corporate Security Director is located in the Corporate Office in Oklahoma City. The Standby Operations Manager acts as the onsite
%curityDirector.
Se
'!he site security organization is comprised of Kerr McGee employees categorized as follows:
supervisors (includes Site Manager) a.
b.
guards health physics personnel c.
[/
d.
utility operators.
1
/
The licensee maintains security seven days a week, 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> a day, and operates on three shifts.
In order to maintain three shifts,
% guards are required. The site security program rotation is divided into four shif ts (A., S., C., and D.), on each shift ish health physics employee, and M utility operator.
These employees are trained to relieve the guards as necessary.
The licensee facility has on1 1 ot er s within the MAAs except the aterial Access areas include the rocessing area an orator ndthegault (room 126h The primary central alarm station is located in the A second central a arm station is established at The on t e oorways, th a the isolation zone, and the en ce metal ctor alarm annunica visually and audibly at both alare stations.
e testing of the alarms at the Cimarron Facility, t e nspector verified that the alare station responded to this unannounced testing.
- -~.n w u gp:n r1.um o,,co
(emanutemammew (
3.
Training ne inspector's review of training records revealed that training had been accomplished for supervisors, guards, and security organization employees as follows:
June 1981 - The annual rity qualification test including guards guard relief personnel supervisors g and employees Third Quarter 1981 - Review of physical securit frements of Amendment MPP-3 of License Sh?! 1174 attended by
- guards, supervisors, and % facility employees.
First Quarter 1982 - Training conducted by the Standby Operations Manager on March 29 and 30, 1982, on the following topics.
Demonstration and trespasses a.
b.
Emergency building lights and gates through fence to coal yard area c.
Tour of plutonium plant to observe and discuss vaste shipment loadout operations and security alare systees.
This class was attended by % guards, supervisors,.
relief g
personnel ghealth physics andgati ity operator), an facility employees.
i 4.
Guard Physical Examinations Annual physical examinations for the guards were dated as follows:
guard 3/31/80, 3/18/81, and 3/26/82.
a.
b.
guard 9/22/80 and 8/28/81.
guard 6/26/81 (new employee) c.
d.
guard 12/4/80 - 2/19/82 (December 1981 physical delay ecause of illness).
There were no noted physical impairments which would preclude carrying out of job requirements.
5.
Guard Qualification An employee from the Oklahoma City Police Department (OCPD), Assistant Gun Range Master is hired by the licensee to conduct qualification requirements for th guards at the licensee's range (built in the Tall of 1978). All guards qualified twice from the period 10/5/80 to 4/4/82. n inspector reviewed the targets used, which were signed by both the instructor and participant, the scores ranged from 82 to 98, and the average for the eight qualifications was 93.5.
6.
Physical Barriers:
The inspector noted that the perimeter fence was in good repair and no openings due to damage or erosion were observed. ne isolation zone was clear of objects to prevent concealment and to aid in observing entrance into the protected area. Entrance to the vital area and material access areas requires passage through more than one physical barrier.
7.
Intrusion and Detection Alarms:
Operating Sh3 detectors are located at the personnel and material exits of the plutonium lant buildings. The ere checked and determined operable by the inspector.
I Using the securit guard weekly check sheet, the ins ector tested the alarms on the the the the the and tests.
arms were ound operable.
tempts i
to approach the vehicle gate and the perimeter fence Alarms were tested for opera 1 aty at least each seven days as required.
The inspector reviewed the security guard daily check lists which included tests of the ShH detectors (entrance and dock area), metal detector, explosive detector, plutonium plant fence, isolation zone seals on plutonium plant emergency gate, condition of uranium plant fence, seals on the uranium plant emergency gate, outer fence area for damage, and the condition of the perimeter fence.
In addition, the shift check lists included checks on the ano t 8.
Records of Events i
Host of the unusual incident reports re riewed by the inspector involved only weather and electronic failures and minor trespassing j
problems with remedial action noted.
In July 1981, some temporary communication problems existed for about one week because the tel hone company converted their tele-phone system which resulted in a temporary loss of the communication system
~
1981, the telephone company converte o the to correct the communication problem.
9.
Access Controls All yees (including coal liquification employees) have a E or entrance to the protected area. He inclusion 1
3 1
v, b o ll. tr i l
o I
- serr.
.~.
area is controlled by guard access.
Visitors a Corporate personnel l
i i
All 38 employees have plant access to all vital areas and MAAs.
New employees are escorted until training is completed.
Visitors, including j
Corporate personnel, require escort. Nine employees are allowed access j
without escort at any time, and no escort is required for the other i
29 employees during normal duty hours.
Escort is required for these employees during off-duty hours.
r i
The vital area is and a log for access is maintained documenting date, time, individual, r
badge number, and reason for entry.
i Photo-identification badges are required for unescor the protected area.
Personnel and packa e search
)
i is performed on a
)
The is conducted 10.
Key Control j
Issuance and control of keys is the responsibility of the Standby Operations Manager.
Key control is maintained by security, and receivers sign for keys. Keys for security locks were maintained a
in a locked cabinet in the Combinations are issued on a need-to know basis and supervisory personnel are I
authorized to issue combinations.
In a letter from Division of Safeguards, h3SS, dated August 21, 1980, the licensee was granted an exemption to the requirement of the i
l
" Upgrade Rule" to submit a revised " Category I" physical security plan.
This exempted the licensee f rom the requirements of Sections 73.20, 1
1 73.45, and 73.46, as pertains to the submittal of a revised physical security plan.
1 i
l l
4
.. -~
(
~
Kerr lear Corporation - YEC Enriched Uranium Material Balance Statement Beloyhh For Period 1/28/71 - 3/31/82 Enriched Uranium In Grams U
__U-235 Beginning Inventory 1/27/81 Receipts Total to Account For j
p-
) '
Shipments Degradation (to natural) 26,803 620
- ~'
e; Measured Discards (of f site burials) 80,075 2,788 3? S Inventory Discrepancy (141,903)
(3,725) 1 3'
i Ending Inventory 3/31/82 y
P.
Total Accounted For l
l l
w,fLoll by ehe}
rud s las r N sed ky p re, m,,,),. Q 3g l
$ b F FG vbe% lWO.
l t
EX111 BIT A
_ ~ -
n_
=x
(
Kerr McGee Nuclear Corporation - YEC - SNH - 928 EnrichedUraniumAbove{$%)-MaterialBalanceStatement For Period 1/27/81 - 3/31/82 Enriched Uranium In Crams U
U-235 F~
Beginning Inventory 1/28/81 -0~
From Other SS Haterial (Depleted)
Total to Account For 3
Inventory Dif ferences (AboveQ1)j
},.
(11,336)
(1,178)
T I
To Other SS Material (Below5%) g 26,136 1,208 Ending Inventory 3/31/82 Total Accounted For 3
.A i
Wi% \\oN hfet.
Tw "2
as yev4eh hj pNa m n hi, os wtGunnos NFo.
1 i
EXHIBIT B
__m_
_g Kerr McGee Nuclear Corporation Plutonium Material Balance Statement For Period 1/27/81 - 3/31/82 Plutonium In Crams Pu _
Isotope Beginning Inventory 1/27/81 Pu-241 Decay (-)
E Ending Inventory 3/31/82 Summary MBA-50$(eHoldup)]
Vaulth MBA - 12 MBA - Room 121' Waste Storage)
Total
\\
- M
'gic e
viog t,)) #5 g t) f O l
l l
AI Includes a one gram Pu-2 EXHIBIT C
- -