Text
oFF1ctal
..
,
.-
.
DEC 111986
Docket Nos. 50-424
License Nos. CPPR-108
Georgi
ower Company
ATTN: Mr. J. H. Miller, Jr.
President
P. O. Box'4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: NRC REVIEW 0F V0GTLE READINESS REVIEW MODULE N0. 9A, RADIOLOGICAL
PROTECTION, REPORT NO. 50-424/86-34
The NRC has completed a detailed review, inspection, and verification of the
subject module which you submitted to the NRC on March 25, 1986.
Periodic
inspections were conducted at the Vogtle site and the resultant findings were
discussed with members of your staff at the conclusion of these inspections.
Areas contained in the module which were reviewed, examined, and verified are
identified in the enclosed report.
Within these areas, the inspection and
verification consisted of selected examinations of procedures and representative
records, discussions with personnel, and review of your licensing commitments.
The results of Module No. 9A reviews and inspections are provided in the Summary
and Conclusion Sections of the enclosed report.
!
Based upon the NRC review and inspection of those activities identified in the
'
module, we have determined that those portions of your radiological protection
program which have been completed and reviewed in your readiness review
activities, are acceptable with the exception of those items or areas identified
in our report.
As noted in the report, the full implementation of the
radiological protection program remains to be completed.
The conclusions within the report are based upon information currently available
to the inspectors and reviewers.
Should information subsequently become
available which was not considered during this review or which conflicts with
earlier information, it will be evaluated to determine what effects it may have
on the above conclusion.
8612230256 861211
ADOCK 05000424
Q
_
%\\
p/
~
..~
.
,
Georgia Power Company
2
Should you have any questions concerning this letter, please contact us.
Sincerely,
Original Signed by
Roger D. Walker /for
J. Nelson Grace
Regional Administrator
Enclosure:
Inspection Report
w/ encl:
. P. O'Reilly, Senior Vice President
/ Nuclear Operations
@.E.Conway,SeniorVicePresident&
f roject Director
LD. O. Foster, Vice President, Project
fSupport
>
vP. D. Rice, Vice President, Project
jEngineering
A 'H. Pinson, Vice President, Project
Construction
. T. Beckham, Vice President &
/ General Manager - Operations
4 . A. Thomas, Vice President,
icensing
. S. Read, General Manager,
/.QualityAssurance
C
W. Hayes, Vogtle Quality
/ ssurance Manager
A
VW. C. Ramsey, Manager -
/ Readiness Review
@
B. Bockhold, General Manager,
Nuclear Operations
. Gucwa, Manager, Nuclear Safety
and Licensing
J . H. Googe, Project
/ Construction Manager
VE. D. Groover, Quality
Assurance Site Manager -
/ Construction
p/ Manager
. A. Bailey, Project Licensing
vti. F. Trowbridge, Esq. , Shaw,
Pittman, Potts and Trowbridge
. W. Churchill, Esq., Shaw,
Pittman, Potts and Trowbridge
cc w/ encl:
(Continued on page 3)
_. _
_ - _ _
_
. .
. -
__
_
_
, .
,
.
Georgia Power Company
3
c w/ encl:
vE. L. Blake, Jr. , Esq. , Shaw,-
f ittman, Potts and Trowbridge
/.
. Joiner, Troutman, Sanders,
ockerman and Ashmore
. G. Ledbetter, Commissioner,
Department of Human Resources
H. Badger, Office of Planning
and Budget
. Kirkland, III, Counsel,
Office of the Consumer's Utility
/ ouncil
C
4. Feig, Georgians Against
clear Energy
. B. Margulies, Esq., Chairman,
Atomic Safety and Licensing Board
.
Ir.anel
P
O. H. Paris, Administrative Judge
Atomic Safety and Licensing Board
Panel
G. A. Linenberger, Jr., Administrative Judge
Atomic Safety and Licensing Board
Panel
c w/ encl:
Reis, GS0
M. Hill, IE
. Miller, NRR
. Brach, ED0
. Sinkule, RII
Christnot, RII
C Resident Inspector
Document Control Desk
JtateofGeorgia
v .' Christenbury, OGC
' Grimes, IE
.
. Novak, NRR
RII
RII
RII
RII
RII
RI
/
{
M45
h
/ )0
!
8 Stohr
MSinkule
VLBrgwnlee
Walker
DCol[lis 10//[/86 MT/g/86
36/g/86
18/6/86
u
CHosey
GT/j /86 10/p/86
10/ /
12
sz
it
M S
d
./
L t)
ESchrist 6 sen
TNov k
MErn t
12/f/86
12/' /86 12//o /86
-
_
-
. - .
.
-.