ML20215E925
| ML20215E925 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 10/06/1986 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Campbell G ARKANSAS POWER & LIGHT CO. |
| Shared Package | |
| ML20215E926 | List: |
| References | |
| NUDOCS 8610160023 | |
| Download: ML20215E925 (2) | |
See also: IR 05000313/1986025
Text
.
..
>
0(,T
6E
-
In Reply Refer To:
Dockets:
50-313/86-25
50-368/86-26
,
Arkansas Power & Light Company
~
ATTN: Mr. Gene Campbell
Vice President, Nuclear
.
Operations
"
,
- -
~
P. O. Box 551
!
Little Rock, Arkansas 72203
'
>
j
Gentlemen:
-
~
This_ refers to the inspection conducted by Messrs. D. M. Hunnicutt,
R. C. Stewart, J. I. Tapia, and G. A. Pick of this office during the period
July 28 through August 1, 1986, of activities authorized by NRC Operating
Licenses DPR-51 and NPF-6 for Arkansas Nuclear One, and to the discussion of
our findings with Mr. E. C. Ewing, and other members of yo.ur staff atTthe
conclusion of the inspection.
Areas examined during the inspection included the installation of an additional
~
condensate storage tank, inservice inspection, local leak rate testing, and
testing of pipe support and restraint systems. Within these, areas, the
inspection consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the inspectors.
The
inspection findings are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you-are required to respond to
these violations, in writing, in accordance with the provisions of
Section-2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations.
Your response should be based on the specifics contained
in the Notice of Violation enclosed with this letter.
Two unresolved items are identified in paragraphs Sa and Sc of the enclosed
inspection report.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragraph 2 of the enclosed report.
l
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
h
PS
RSB
RPB
RIV.
OS
OS
OS
05
RCStewart/tw
JITa ia
GPick DMHunnicutt DRHygtpr TFWesterman JEGagly do,
,
'
$Qpt)86
d\\ /
86 h/H86]/p%/86
Q/1N86
f/13/86
9/3l
i
8610160023 861006
/
l
ADOCK 03000313
/
gI g
i
G
g
l
- - . . .
.
--.
.
- . -
-
---.
. _
- -
- . . . -
.-
-
,
..
-,
.
_
t
Arkansas Power & Light Company
-2-
+
,
'
>
s
Should you have any questions concerning this inspection, we will be~ pleased'to
discuss them with you.
_
,
~
'
'^
Sincerely, '
[' ~ ' ' .
~
+:
s
.
Oridnal Sip $d By-
'
, ,
-:
J. E. Gagliardo, Chief-
ReactorProjectsBranchl
.
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-313/86-25
50-368/86-26
cc w/ enclosures:
J. M. Levine, Director
- ~
Site Nuclear Operations
Arkansas Nuclear One
P. O. Box 608
Russellville, Arkanscs 72801
Arkansas Radiation Control Program Director
bcc to DMB (IE01)
bcc distrib. by RIV:
- RPB
- Resident Inspector
R. D. Martin, RA
- R&SPB
- Section Chief (RPB/B)
- D. Weiss, LFMB (AR-2015)
- RIV File
DRSP
- RSB
- MIS SYSTEM
- RSTS Operator
- R. C. Stewart
- J. I._Tapia
- G. Pick
'
- w/766.
.