Forwards Insp Rept 50-424/86-27 on Detailed Review,Insp & Verification of Readiness Review Module 16, NSSS Submitted on 860109.Attention Invited to Several Deficiencies Identified in Rept
ML20215E829
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 12/12/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20215E832 List:
References
NUDOCS 8612230132
Download: ML20215E829 (3)


See also: IR 05000424/1986027

Text

-

04,%

,mb ?

g ..

7--

W

DEC 12

Georgia

wer Company

-ATTN:

r. J. H. Miller, Jr.

President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

f

'

SUBJECT: NRC REVIEW 0F V0GTLE READINESS REVIEW MODULE NO. 16

NUCLEAR STEAM SUPPLY SYSTEM - REPORT NO. 50-424/86-27

i-

The NRC has completed a detailed review, inspection, and verification of the

subject Module which you submitted to the NRC on January 9,

1986.

Periodic

inspections were conducted at the Vogtle site and the resultant findings were

discussed with members of your staff at the conclusion of these inspections.

Technical reviews were also conducted in NRC Bethesda offices and the findings

from these reviews have also been discussed with your staff.

Areas contained in the module, which were reviewed, examined, and verified, are

identified in the enclosed report.

Within these areas, the inspection and

verification consisted of selected examinations of procedures and representative

records, discussions with personnel, observations of activities in progress, and

review of your licensing commitments.

The primary results of module 16 reviews and inspections are provided in the

summary and conclusions section of the enclosed report. Within the findings

section, several deficiencies are identified. Your attention is invited to these

matters which will be pursued during future reviews and inspections.

Based upon the NRC review and inspection of those activities identified in the

module, we have determined that the Nuclear Steam Supply System at Vogtle Unit

No. 1 is acceptable and complies with applicable regulatory requirements with the

exception of those items or areas identified in the Report. This decision is

based on information currently available to the inspectors and reviewers. Should

information subsequently become available which was not considered during this

review or which conflicts with earlier information, it will be evaluated to

determine what effect it may have on the above conclusion.

Should you have any questions concerning this letter, please contact us.

Sincerely,

ENGINAL SIGND ^/6

1, NELSON GIMCE

J. Nelson Grace

Regional Administrator

Enclosure:

(See page 2)

' \\

8612230132 861212

k/

PDR

ADOCK 05000424

'fc-%/

O

PDR

_-

r

w

,

,

Georgia Power Company

2

DEC 121985

Enclosure:

Inspection Report No. 50-424/86-27

pc w/ enc 1:

vd- P. O'Reilly, Senior Vice President

/R

Nuclear Operations

. E. Conway, Senior Vice President &

/ roject Director

P

v0. O. Foster, Vice President, Project

/ Support

J . D. Rice, Vice President, Project

/ Engineering

f . H. Pinson, Vice President, Project

/ Construction

t/). T. Beckham, Vice President &

/R. A. Thomas, Vice President,

General Manager - Operations

/ Licensing

V 0. S. Read, General Manager,

Quality Assurance

MC.W. Hayes,VogtleQuality

/ Assurance Manager

g/W. C. Ramsey, Manager -

Readiness Review

/G

B. Bockhold, General Manager,

/NuclearOperations

VL. Gucwa, Manager, Nuclear Safety

' and Licensing

. H. Googe, Project

Construction Manager

E. D. Groover, Quality

Assurance Site Manager -

/ Construction

VJ

A. Bailey, Project Licensing

Manager

G. F. Trowbridge, Esq. , Shaw,

j' Pittman, Potts and Trowbridge

VB. W. Churchill, Esq., Shaw,

Pittman, Potts and Trowbridge

/E. L. Blake, Jr. , Esq. , Shaw,

/Pittman,PottsandTrowbridge

E. Joiner, Troutman, Sanders,

Lockerman and Ashmore

. G. Ledbetter, Commissioner,

Department of Human Resources

(cc w/enci cont'd - see page 3)

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

_ _ _ _

,

-

._

's ~

'?'

DEC 12 1999

.

= Georgia Power Company

'3

c w/ encl'- cont'd)

. .H. Badger, Office of Planning

.

jand Budget-

g.Kirkland,III, Counsel,

Office of the Consumer's Utility

. / Council

4 . C. Teper, Georgians Against

/ Nuclear Energy

V M. B. Margulies, Esq., Chairman,

Atomic Safety and Licensing Board

/ Panel

J Dr. O. H. Paris, Administrative Judge

Atomic Safety and Licensing Board

/ ~ Panel

GG. A. Linenberger, Jr., Administrative Judge

Atomic Safety and Licensing Board

Panel

cc w/ encl:

. Reis, ELD

. M. Hill, IE

. Miller, NRR

. Brach,.EDO

-

Sinkule, RII

( . Christnot, RII

V4RC Resident Inspector

Document Control Desk

State of Georgia

l

RII

RII

ELD

NRR

RII

R

RII

60

yd$ kW MS *"

iW)b &

h

A&$um

y

EChristnot:es MSinkuhe EChris ensen

TNovak

V8rownlee

dal

r

MErnst

9 86

12/ /86

12//o /86

12/$/86

12/g/86 12/f/86

12/6/86 12/

/

J