ML20215E829
| ML20215E829 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 12/12/1986 |
| From: | Grace J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | John Miller GEORGIA POWER CO. |
| Shared Package | |
| ML20215E832 | List: |
| References | |
| NUDOCS 8612230132 | |
| Download: ML20215E829 (3) | |
See also: IR 05000424/1986027
Text
-
04,%
,mb ?
g ..
7--
W
DEC 12
wer Company
-ATTN:
r. J. H. Miller, Jr.
President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
f
'
SUBJECT: NRC REVIEW 0F V0GTLE READINESS REVIEW MODULE NO. 16
NUCLEAR STEAM SUPPLY SYSTEM - REPORT NO. 50-424/86-27
i-
The NRC has completed a detailed review, inspection, and verification of the
subject Module which you submitted to the NRC on January 9,
1986.
Periodic
inspections were conducted at the Vogtle site and the resultant findings were
discussed with members of your staff at the conclusion of these inspections.
Technical reviews were also conducted in NRC Bethesda offices and the findings
from these reviews have also been discussed with your staff.
Areas contained in the module, which were reviewed, examined, and verified, are
identified in the enclosed report.
Within these areas, the inspection and
verification consisted of selected examinations of procedures and representative
records, discussions with personnel, observations of activities in progress, and
review of your licensing commitments.
The primary results of module 16 reviews and inspections are provided in the
summary and conclusions section of the enclosed report. Within the findings
section, several deficiencies are identified. Your attention is invited to these
matters which will be pursued during future reviews and inspections.
Based upon the NRC review and inspection of those activities identified in the
module, we have determined that the Nuclear Steam Supply System at Vogtle Unit
No. 1 is acceptable and complies with applicable regulatory requirements with the
exception of those items or areas identified in the Report. This decision is
based on information currently available to the inspectors and reviewers. Should
information subsequently become available which was not considered during this
review or which conflicts with earlier information, it will be evaluated to
determine what effect it may have on the above conclusion.
Should you have any questions concerning this letter, please contact us.
Sincerely,
ENGINAL SIGND ^/6
1, NELSON GIMCE
J. Nelson Grace
Regional Administrator
Enclosure:
(See page 2)
' \\
8612230132 861212
k/
ADOCK 05000424
'fc-%/
O
_-
r
w
,
,
Georgia Power Company
2
DEC 121985
Enclosure:
Inspection Report No. 50-424/86-27
pc w/ enc 1:
vd- P. O'Reilly, Senior Vice President
/R
Nuclear Operations
. E. Conway, Senior Vice President &
/ roject Director
P
v0. O. Foster, Vice President, Project
/ Support
J . D. Rice, Vice President, Project
/ Engineering
f . H. Pinson, Vice President, Project
/ Construction
t/). T. Beckham, Vice President &
/R. A. Thomas, Vice President,
General Manager - Operations
/ Licensing
V 0. S. Read, General Manager,
Quality Assurance
MC.W. Hayes,VogtleQuality
/ Assurance Manager
g/W. C. Ramsey, Manager -
Readiness Review
/G
B. Bockhold, General Manager,
/NuclearOperations
VL. Gucwa, Manager, Nuclear Safety
' and Licensing
. H. Googe, Project
Construction Manager
E. D. Groover, Quality
Assurance Site Manager -
/ Construction
VJ
A. Bailey, Project Licensing
Manager
G. F. Trowbridge, Esq. , Shaw,
j' Pittman, Potts and Trowbridge
VB. W. Churchill, Esq., Shaw,
Pittman, Potts and Trowbridge
/E. L. Blake, Jr. , Esq. , Shaw,
/Pittman,PottsandTrowbridge
E. Joiner, Troutman, Sanders,
Lockerman and Ashmore
. G. Ledbetter, Commissioner,
Department of Human Resources
(cc w/enci cont'd - see page 3)
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _
,
-
._
's ~
'?'
DEC 12 1999
.
= Georgia Power Company
'3
c w/ encl'- cont'd)
. .H. Badger, Office of Planning
.
jand Budget-
g.Kirkland,III, Counsel,
Office of the Consumer's Utility
. / Council
4 . C. Teper, Georgians Against
/ Nuclear Energy
V M. B. Margulies, Esq., Chairman,
Atomic Safety and Licensing Board
/ Panel
J Dr. O. H. Paris, Administrative Judge
Atomic Safety and Licensing Board
/ ~ Panel
GG. A. Linenberger, Jr., Administrative Judge
Atomic Safety and Licensing Board
Panel
cc w/ encl:
. Reis, ELD
. M. Hill, IE
. Miller, NRR
. Brach,.EDO
-
Sinkule, RII
( . Christnot, RII
V4RC Resident Inspector
Document Control Desk
State of Georgia
l
RII
RII
ELD
RII
R
RII
60
yd$ kW MS *"
iW)b &
h
A&$um
y
EChristnot:es MSinkuhe EChris ensen
TNovak
V8rownlee
dal
r
MErnst
9 86
12/ /86
12//o /86
12/$/86
12/g/86 12/f/86
12/6/86 12/
/
J