Informs of Finalization of Case Study, Review of Motor- Operated Valve Performance. Rept Contains Specific Recommendations Re Valve Assembly Performance & Reliability Problems.Numarc Will Undertake Industry Initiatives
ML20215E685
Person / Time
Issue date: 12/05/1986
From: Heltemes C
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
To: Layman W
NUCLEAR SAFETY ANALYSIS CENTER
Shared Package
ML20215E592 List:
References
NUDOCS 8612230071
Download: ML20215E685 (3)


Text

. _........

w y

. December 5, 1986 5

~

Mr. William Layman, Acting Director L

Nuclear Safety Analysis Center f

3412 Hillview Avenue L-P. O. Box 10412 AE0D/C603

^

L Palo Alto, California 94303 g

x

Dear Mr. Layman:

%R s

f

SUBJECT:

CASE STUDY REPORT - A REVIEW 0F MOTOR-0PERATED VALVE PERFORMANCE

[

The Office for Analysis and Evaluation of Operational Data (AE0D) has finalized its case study on a review of motor-operated valve performance. The i

[

final report addresses the peer review comments provided by NRR, IE, RES, the b

Regions, INP0, NSAC, M0 VATS Inc., and Toledo Edison Company. The study report brings together previous NRC studies and other related documents (i.e., AE00 g

7 reports and IE bulletins, circulars, and information notices), reviews p.

approximately 1200 valve operator events (SCSS and NPRDS) from 1981 to mid-1985, e

and incorporates new data from an NRC valve testing program that utilized r

I-signature tracing techniques on valve assemblies in operating plants. We have enclosed a copy of our final report for your information and use as you may

{

deem appropriate.

l c

E This study was performed in response to action item 6(i) of the actions i

directed by the Executive Director for Operations to respond to the NRC staff investigations of the June 9, 1985 event at Davis-Besse.

Our case study p

report concludes that current methods and procedures at many operating plants y

are not adequate to assure that valves will operate when needed.

Furthermore, j

z

[

the deficiencies would generally not be detected by existing plant procedures p

)

specifications and ASME Code,Section XI inservice testing)g (plant technical intended to assure operability, such as surveillance testin 1

or plant operator b

observations. Thus, assurance of valve operability appears to be strongly

[

dependent upon diagnostic capability to assess and evaluate failures to operate so that root causes of failure--including switch setpoint--are

(

correctly determined and proper changes implemented.

Further, the issue of q

valve assembly performance and reliability is a complex subject that involves 9

r several technical disciplines.

T F

The enclosed case study report contains several specific recommendations E

directed toward addressing valve assembly performance and reliability p

?

problems. We understand that the NRC Executive Director for Operations will

=

L request that NUMARC undertake appropriate industry initiatives to address the problems identified in the AE0D report.

je f

i l

J 5

E B612230071 861205

{

PDR ORG TEXD I

E

tg

.s a

'e h

Mr. William Layman- '

x c

A copy of the final case study report and this letter are being placed'in the Public Document Room at 1717 H Street, N.W.,

Washington, D.C. 20555.

If you or your staff have any questions regarding this report, please contact Earl J. Brown of my staff. Dr. Brown can be reached at (301) 492-4437.

Sincerely, orenes senes my C. J. Hasteenes. A.

C. J. Heltemes, Jr., Director Office for Analysis and Evaluation of Operational Data

Enclosure:

As stated AE00 SF AE0D CF ROAB SF ROAB CF EBrown MChiramal SRubin WLanning KBlack MWilliams FHebdon CHeltemes DHumenansky, OCM

  • See r. ext sheet for previous concurrence OFC :ROAB
ROAB:SC
ROAB:BC
AEOD DD
AE00:D

.qr....__:___..______:_..________

NAME :EBrown:nc

MChiramal
SRubin
FHeb on
C

, : emes DATE :12/ 4 /86 * :12/ 4 /86 * :12/ 4 /86 * :12/5'/86

12/q(/86 OFFICIAL RECORD COPY

.- -~. _ _ _ _, -

6yl -

q.

Mr. William Layman A copy of the final case study report and this letter are being placed in the Public Document Room at 1717 H Street, N.W.,

Washington, D.C. 20555.

If you'or your staff have any questions regarding this report, please contact Earl J. Brown of my staff.

Dr. Brown can be reached at (301) 492-4437.

C. J. Heltemes, Jr., Dif ctor Office for Analysis apd Evaluation of Operational Da

Enclosure:

As stated DISTRIBUTION:

PDR

/

AE0D SF

/

AE00 CF /

R0AB SF/

ROABpf EBrown MCfiramal SRubin yklanning KBlack MWilliams FHebdon CHeltemes DHumenansky, OCM OFC :RO@,

rROAB:SCg ROAB BC AE0D DD AE00 0 N AME : E B roh, [n# _ _ _ _ _'i _ _ _ _ _ _ _ _b_k:: _ _ _ _ _: _ _ _ _ _ _ _ :: _ _ _

_ _ _ _ _ : _.G.

nc
MChiramal
SRubin @ :FHebdon
CHeltemes DATE:12/'//86
12/4 /86
12/ 4 /86
12/ /86
12/ /86 i

0FFICIAL RECORD COPY k