Text
w
.--
oN
DEC 101986
~
Docket No. 50-424
License No. CPPR-108
p'eorgiaPowerCompany
VATTN: Mr. J. H. Miller, Jr. ,
President
P.O.-Box 4545
' Atlanta, GA 30302
Gentlemen:
SUBJECT: NRC REVIEW OF V0GTLE READINESS REVIEW MODULE NO.19,
ELECTRICAL SUPPORTS - REPORT NO. 50-424/86-48
The NRC has completed a detailed review, inspection, and verification of the
subject Module which you submitted to ' the NRC on April 10, 1986.
Periodic
inspections were conducted at the Vogtle site and the resultant findings were
. discussed with members of' your staff at the conclusion of these inspections.
Technical reviews also were conducted in NRC Bethesda offices and the findings
from these reviews have been discussed with your staff.
Areas contained- in the module, which were reviewed, examined, and verified, are
identified in the enclosed report.
Within these areas, the inspection and
verification consisted of selected examinations of procedures and representative
records, discussions with personnel, observctions of activities in progress, and
review of your licensing commitments.
The results of Module No.19 reviews and inspections are summarized as Inspector
Followup Items. Your attention is invited to the inspector followup item which
will be pursued during future licensing reviews and inspections.
Based upon the NRC reviews and inspections of those activities identified in the
module, we have determined that the activity control of the Licensee's programs
for design and construction Electrical Supports for Category I structures at
i
Vogtle Unit No.1 are acceptable and comply with applicable regulatory require-
ments with the exception of those items or areas identified in the Report. This
decision is based on information currently available to the inspectors and =
reviewers.
Should information subsequently become available which was not
considered durirg this review or which conflicts with earlier information, it
will be evaluated to determine what effect it may have on the above conclusion.
I
?
o
'
j
m .
.e
'
ol
_ Georgia Power Company
2
g
F
Should you have any questions concerning this letter, please contact us.
Sincerely,
'
n$
-
.
V '
J. Nelse, Grace
Regional Administrator
'
Enclosure:
Inspection Report No. 50-424/86-48
g4 w/ encl:
'
M. P. O'Reilly, Senior Vice President
j Nuclear Operations
f. E. Conway, Senior Vice President &
,
!
.
j Project Director
A. O. Foster, Vice President, Project
/ . Support
VP. D. Rice, Vice President, Project
f Engineering
g
l1. Pinson, Vice President, Project
Construction
. T. Beckham, Vice President &
General Manager - Operations
JR. A. Thomas, Vice President,
'
v/b. Licensing
S. Read, General Manager,
jC.W. Hayes
Quality Assurance
, Vogtle Quality
Assurance Manager
/W.C.Ramsey, Manager-
-,
/ Readiness Review
W. B. Bockhold, General Manager,
/L. Gucwa, Manager, Nuclear Safety
Nuclear Operations
,
!
fand Licensing
,
s/1. H. Googe, Project
!
/ Construction Manager
i
\\{. D. Groover, Quality
Assurance Site Manager -
/ Construction
l
/ . A. Bailey, Project Licensing
l
Manager
G. F. Trowbridge, Esq. , Shaw,
Pittman, Potts and Trowbridge
jB.W. Churchill,Esq.,Shaw,
Pittman, Potts and Trowbridge
cc w/enci cont'd on page 3
m
__
,b-
p-
Georgia Power Company
3
DEc 10 W
w/enci cont'd
E. L. Blake, Jr. , Esq. , Shaw,
/ Pittman, Potts and Trowbridge
v0. E. Joiner, Troutman, Sanders,
h.LockermanandAshmore
G. Ledbetter, Commissioner,
/ Department of Human Resources
.VC. H. Badger, Office of Planning
and Budget
. Kirkland, III, Counsel,
Office of the Consumer's Utility
.
h. Council
Feig, Georgians Against
N
/ uclear Energy
/.B.Margulies,Esq., Chairman,
Atomic Safety and Licensing Board
/ Panel
VDr. O. H. Paris, Administrative Judge
. Atomic Safety and Licensing Board
Panel
g. A. Linenberger, Jr. , Administrative Judge
'
Atomic Safety and Licensing Board
Panel
B. P. Garde, Citizens Clinic, Director
Government Accountability Project
,
c w/ enc'l:
. Reis, GS0
. M. Hill, IE
. Miller, NRR
. Brach, GSO
. Sinkule, RII
vf Christnot, RII
f
A RC Resident Inspector
Document Control Desk
State of Georgia
l
RII
RII
RII
RII
RII
bth
h
&
MHunt:bhg
I on n
AHerdt
VP ciera
MSinkule
$/ / /86
JO/ 3 /86
g/g/86
9/90/86
RII
.
NR
ELD
h(
pl6 /W
k
Ike
TNovak
BG
es
EChriste6 bury
f/86
Ig/g/86
jd/
86
38/f/86
g3
'L
lL
I
L(8_
/
l
.