Forwards Insp Rept 50-424/86-48 of Detailed Review,Insp & Verification of Readiness Review Module 19 Re Electrical Supports Submitted on 860410.Design & Const of Electrical Supports Acceptable W/Exception of Items Identified in Rept
ML20215E661
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 12/10/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20215E663 List:
References
NUDOCS 8612230061
Download: ML20215E661 (3)


See also: IR 05000424/1986048

Text

w

.--

oN

DEC 101986

~

Docket No. 50-424

License No. CPPR-108

p'eorgiaPowerCompany

VATTN: Mr. J. H. Miller, Jr. ,

President

P.O.-Box 4545

' Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC REVIEW OF V0GTLE READINESS REVIEW MODULE NO.19,

ELECTRICAL SUPPORTS - REPORT NO. 50-424/86-48

The NRC has completed a detailed review, inspection, and verification of the

subject Module which you submitted to ' the NRC on April 10, 1986.

Periodic

inspections were conducted at the Vogtle site and the resultant findings were

. discussed with members of' your staff at the conclusion of these inspections.

Technical reviews also were conducted in NRC Bethesda offices and the findings

from these reviews have been discussed with your staff.

Areas contained- in the module, which were reviewed, examined, and verified, are

identified in the enclosed report.

Within these areas, the inspection and

verification consisted of selected examinations of procedures and representative

records, discussions with personnel, observctions of activities in progress, and

review of your licensing commitments.

The results of Module No.19 reviews and inspections are summarized as Inspector

Followup Items. Your attention is invited to the inspector followup item which

will be pursued during future licensing reviews and inspections.

Based upon the NRC reviews and inspections of those activities identified in the

module, we have determined that the activity control of the Licensee's programs

for design and construction Electrical Supports for Category I structures at

i

Vogtle Unit No.1 are acceptable and comply with applicable regulatory require-

ments with the exception of those items or areas identified in the Report. This

decision is based on information currently available to the inspectors and =

reviewers.

Should information subsequently become available which was not

considered durirg this review or which conflicts with earlier information, it

will be evaluated to determine what effect it may have on the above conclusion.

I

?

o

'

j

m .

.e

'

ol

_ Georgia Power Company

2

g

F

Should you have any questions concerning this letter, please contact us.

Sincerely,

'

n$

-

.

V '

J. Nelse, Grace

Regional Administrator

'

Enclosure:

Inspection Report No. 50-424/86-48

g4 w/ encl:

'

M. P. O'Reilly, Senior Vice President

j Nuclear Operations

f. E. Conway, Senior Vice President &

,

!

.

j Project Director

A. O. Foster, Vice President, Project

/ . Support

VP. D. Rice, Vice President, Project

f Engineering

g

l1. Pinson, Vice President, Project

Construction

. T. Beckham, Vice President &

General Manager - Operations

JR. A. Thomas, Vice President,

'

v/b. Licensing

S. Read, General Manager,

jC.W. Hayes

Quality Assurance

, Vogtle Quality

Assurance Manager

/W.C.Ramsey, Manager-

-,

/ Readiness Review

W. B. Bockhold, General Manager,

/L. Gucwa, Manager, Nuclear Safety

Nuclear Operations

,

!

fand Licensing

,

s/1. H. Googe, Project

!

/ Construction Manager

i

\\{. D. Groover, Quality

Assurance Site Manager -

/ Construction

l

/ . A. Bailey, Project Licensing

l

Manager

G. F. Trowbridge, Esq. , Shaw,

Pittman, Potts and Trowbridge

jB.W. Churchill,Esq.,Shaw,

Pittman, Potts and Trowbridge

cc w/enci cont'd on page 3

m

__

,b-

p-

Georgia Power Company

3

DEc 10 W

w/enci cont'd

E. L. Blake, Jr. , Esq. , Shaw,

/ Pittman, Potts and Trowbridge

v0. E. Joiner, Troutman, Sanders,

h.LockermanandAshmore

G. Ledbetter, Commissioner,

/ Department of Human Resources

.VC. H. Badger, Office of Planning

and Budget

. Kirkland, III, Counsel,

Office of the Consumer's Utility

.

h. Council

Feig, Georgians Against

N

/ uclear Energy

/.B.Margulies,Esq., Chairman,

Atomic Safety and Licensing Board

/ Panel

VDr. O. H. Paris, Administrative Judge

. Atomic Safety and Licensing Board

Panel

g. A. Linenberger, Jr. , Administrative Judge

'

Atomic Safety and Licensing Board

Panel

B. P. Garde, Citizens Clinic, Director

Government Accountability Project

,

c w/ enc'l:

. Reis, GS0

. M. Hill, IE

. Miller, NRR

. Brach, GSO

. Sinkule, RII

vf Christnot, RII

f

A RC Resident Inspector

Document Control Desk

State of Georgia

l

RII

RII

RII

RII

RII

bth

h

&

MHunt:bhg

I on n

AHerdt

VP ciera

MSinkule

$/ / /86

JO/ 3 /86