Forwards Safety Evaluation & Rev 2 to EGG-EA-6866 on Util 830419,0830,840119,851022 & 860930 Submittals Re Conformance to Reg Guide 1.97 Re Instrumentation.Instrumentation Should Be Installed for Neutron Flux Variable
ML20215E101
Person / Time
Site: Yankee Rowe
Issue date: 12/09/1986
From: Mckenna E
Office of Nuclear Reactor Regulation
To: Papanic G
YANKEE ATOMIC ELECTRIC CO.
Shared Package
ML20215E104 List:
References
RTR-REGGD-01.097, RTR-REGGD-1.097 NUDOCS 8612170275
Download: ML20215E101 (2)


Text

- . _ - _ _ __ .

g-

.. p, DEC 0 91986-

' ~

Docket No.50-029 Mr. George Papanic, Jr.

~ Senior, Project Engineer-Licensing

. Yankee Atomic Electric Company 1671 Worcester Road Framingham, Massachusetts 01701

Dear Mr. Papanic:

SUBJECT:

YANKEE NUCLEAR POWER STATION - REGULATORY GUIDE 1.97 (REY. 2)

By letters dated April 19 and August 30, 1983, January 19, 1984, October 22, 1985 and September 30, 1986, you provided information regarding the conformance of Yankee with Regulatory Guide.l.97 (Instrumentation for Light-Water-Cooled Nuclear Power Plants To Assess Plant And Environs Conditions During And Following An Accident).

~

As discussed in the enclosed safety evaluation and in the technical evaluation report (TER) prepared by staff consultants, the staff concludes that you either conform to or have justified deviations from the guidance of Regulatory Guide 1.97 except for the neutron flux variable. It is the staff's position that you should install and make operational instrumentation that meets the requirements of Regulatory Guide 1.97, Revision 2, for this variable. This instrumentation'should be operational at the first schedule outage of sufficient duration, but no later than the startup following the second refueling outage after receipt of this letter. Further, you are requested to inform the Commission, in writing, of any significant change in the estimated completion schedules identified in the staff's evaluation and when the actions have actually been completed.

Sincerely, N

Eileen M. McKenna, Project Manager Project Directorate #1 Division of PWR Licensing-A

Enclosure:

Safety Evaluation Technical Evaluation Report n 8612170275 861209 29 cc's: See Next Page PDR ADOCK 05 P

  • SEE PREVIOUS. CONCURRENCE Office: LA/PADf1 PM/ PAD #1 Surname: PShuttleworth *EMcKenna/tg fp ]1; Lear #

Date: 12/01/86 12/02/86 12/7/8

^

> 'r -

p . ' ,' y <

i. ')

Mr. George Pa'banic, Jr.

Yankee At;orric Electric . Company Yankee Nuclear Power Station

' l' , , .

C

-CC: , 3 Mr. James E.LTribble, President Yankee Atcmic Electric Company -

1671 Worcester Road ,,

Framingham, Massachusetts 01701 Thomas Dignan, Esquire Ropes and Gray 225 Franklin Street.

Boston, Massachusetts 02110 '

Mr. N. N. St. Laurent Plant Superirtendent Yankee Atomic Electric-Company I Star Route Rowe, Massachusetts 01367 C ha i rr.a n . .. ,

Board offSelectmen Town of Rowe

'Rowe, Massachusetts 01367 Resident Inspector Yankee Nuclear Power Station '

c/o U.S. NRC '

Post Office Box 28 Monroe Brldge, Massachusetts 01350 Regional-Administrator, Region I U.S. Nuclear Regulatory Comission 631 Park Avenue King of Prussia, Pennsylvania 19406 Robert M. Hallisey, Director Radiation Control Program Massachusetts Department of Public Health 150 Tremont Street, 7th Floor Boston, Massachusetts 021F