Text

.

.

.

.

- - _

.

---

.

.

OCT 0 31986

Docket No.

50-423

Northeast Nuclear Energy Company

ATTN: Mr. J. F. Opeka

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06141-0270

Gentlemen:

Subject:

Inspection Report Number 50-423/86-29

This refers to the routine safety inspection conducted by Mr. H. Gregg of this

office on August 18-22, 1986 at Millstone Nuclear Power Station, Unit 3, of

activities authorized by NRC License No. NPF-49 and to the discussions of our

findings held by Mr. Gregg with Mr. W. Romberg and other members of your staff

at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were observed.

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

'Drisicc1 signed By:

Jacque P. Durr

[

Stewart D. Ebneter, Director

Division of Reactor Safety

Enclosure: NRC Region I Inspec ion Report Number 50-423/86-29

[h

,

f

'L

OFFICIAL RECORD COPY

IR MILL 3 86-29 - 0001.0.0

09/15/86

8610140404 861003

gDR

ADOCK 05000423

PDR

_ - _ _ _ _ _ _ .

.

Northeast Nuclear Energy Company

2

.

cc w/ encl:

V. Papadopoli, Construction Quality Assurance Supervisor

E. R. Foster, Director of Generation Construction

E. J. Mroczka, Vice President, Nuclear Operations

D. O. Nordquist, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

W. D. Romberg,' Station Superintendent

Public Document Room (POR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC 3enior Resident Inspector

State of Connecticut

bcc w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

DRP Section Chief

L. Prividy, RI, BV-2

T. Rebelowski, SRI, Millstone 1&2

B. Doolittle, LPM, NRR

Robert J. Bores, DRSS

E. McCabe, DRP Section Chief 3B

r

1

O_

w

N'

s

RI:DRS

RI:DRS

9

OFFICIAL RECORD COPY

IR MILL 3 86-29 - 0001.1.0

09/15/86

._ -.

__.

--

. , _

.

.

-,.

. - - . ..

-

--