r;
-
,
DEC- 5 886
'
.
.
,
In_ Reply Refer To:
Docket:' 50-458/86-24
Gulf. States Utilities
? ATTN: William J. Cahill, Jr.
Senior Vice President
River Bend Nuclear Group
.P. O. Box 220
St. Francisville, Louisiana
70775
,
Gentlemen:
Thank you for'your letter of November 21, 1986, in response to our letter
' and Notice of Deviation dated October 23, 1986. We have reviewed your reply
and find it responsive .to the concerns raised in our Notice of Deviation. We
will review the implementation of your corrective actions during a future
inspection to determine that full compliance has been achieved and will be
maintained.
i
Sincerely,
- Odain:! st;nce cy ,
ll. E. Gas!!crdo
'
J. E. Gagliardo, Chief
Reactor Projects Branch
cc:
Gulf States Utilities
. ATTN:
J. E. Booker, Manager-
Engineering, Nuclear
Fuels & Licensing
"P. O. Box 2951
Beaumont, Texas
77704
Louisiana State University,
Government Documents Department
'
Louisiana Radiation Control P,rogram Director
bec:
(see next page),
[
/
/Y.
k
RIV:RPB/A#4(
C:RF0 A
C:RP(/
-0
WRBennett:cs
JPJa6 don
JEGag'l ardo
T
12/ 8//86
12/w/86
12/4{s
f
)
l
l
$$hagggg eI@
i
e
3
s
_ - _ _ - _ _ _ _ _
,
.
.
-
,
--
-
,
,,
,
. .
T
'
- '
,
.
j
,
.
,
.
,
Gulf States. Utilities
'
-2-
~
.-
.
~
Lbcc to DMB ('IE01)
'
. bec distrib. by RIV:
RPB
. DRSP
Resident Inspector
R. D. Martin, RA
Section Chief (RPB/A)1
- D. Weiss, LFMB (AR-2015)-
MIS System
RSB
'
-
RSTS Operator'
Project Inspector
-
'
R&SPB-
RIV File
.
.
-.
9
GULF STATES
UTILITIES COMPANY
RIVER BEND STATION
POST OFFICE BOX 220
ST. FRANCISVILLE. LOUISIANA 70775
AREA CODE 604
635 6094
346 8651
November 21, 1986
RBG- 24849
File Nos. G9.5, G15.4.1
Mr. Robert D. Martin, Regional Administrator
U.S. Nuclear Regulatory Commission
3gg]%
Region IV
611 Ryan Plaza Drive, Suite 1000
t
Arlington, TX
76011
DEC 3
1986
' jt
l
Dear Mr. Martin:
,_
River Bend Station - Unit 1
Refer to:
Region IV
Docket No. 50-458/ Report 86-24
This
letter responds to the Notice of Deviation contained in NRC
Inspection Report No. 50-458/86-24.
The inspection was performed
by
Mr.
W.
R.
Bennett
during the period August 18-22, 1986 of
activities authorized by NRC Operating License NPF-47
for
River
Bend Station.
Gulf
States
Utilities
Company's
(GSU)
response
to Notice of
Deviation
8624-01,
" Failure
to
Verify
and
Validate
Certain
Abnormal
Operating
Procedures",
is
provided
in
the enclosed
attachment.
This completes
GSU's
response
to
the
Notice
of
Deviation.
Sincerely,
-
-
4
J. Cahill, Jr.
.
Senior Vice President
River Bend Nuclear Group
Attachments
8;;zjoe-GO W G(-
g_-2A%N
i
-
.
.
'
UNITED STATES OF AMERICA
EUCLEAR REGULATORY COBSEISSIDE
.
STATE OF IAUISIAEA
5
FARISE OF WEST FILICIAEA
5
In the Matter of
5
Docket Bos. 50-458
GULF STATES UTILITIES COMPANY
l
(River Bend Station,
Unit 1)
.
W.
J.
Cahill,
Jr.,
being duly sworn, states that he is a Senior
Vice President of Gulf States Utilities Company
that he is authorized
on the part of said Company to sign and file with the Nuclear Rggulatory
Comunis sion the documents attached heretos and that all such documents
are true and correct to the best of his knowledge, information and belief.
/
A
W..KCahill,J['
~~
Subscribed and sworn to before me, a Notary Public in and for the
State and Parish above named, this [ I day ofMyMo , 19ff.
e tt u ,
c/ / b<'
L t ' N
/, Joan W. Middlebrooks
Notary Public in and for
West Feliciana Parish,
l
l
My Commission is for Life.
.
.
-
._ _ _ .
.
k
'
.
.
ATTACHMENT
RESPONSE TO NOTICE OF DEVIATION 50-458/8624-01
REFERENCE
Notice
of
Deviation
J.
E.
Gagliardo letter to W. J. Cahill, Jr.
-
dated October 23, 1986.
FAILURE TO VERIFY AND VALIDATE CERTAIN ABNORMAL OPERATING PROCEDURES
REASON FOR THE DEVIATION
During the initial Emergency Operating
Procedure
(EOP)
verification
and validation (V&V) phase, it was determined that some EOP steps were
event oriented.
To provide cohesive
guidance
to
the
operator
and
utilize
good
human
engineering principles, event oriented EOPs were
combined into existing plant Abnormal Operating Procedures (AOPs).
In
this
process,
documentation
of
the
of
the
new AOPs is not
available.
It is believed to
have
been
an
isolated
oversight
of
" Verification
and
Validation of
Emergency
Operating
Procedures".
CORRECTIVE STEPS WHICH HAVE BEEN TAKEN AND THE RESULTS ACHIEVED
" Alternate
Shutdown
Cooling",
" Anticipated
Transient Without Scram", and AOP-0022, " Radioactive Release Control",
are
undergoing
a
rewrite
in
accordance
with
" Authors
Guide / Control
and
Use
of
Emergency
Operating
Procedures",
to be
incorporated as EOPs.
Prior to approval and implementation they
will
receive a documented V&V in accordance with OSP-0008.
CORRECTIVE STEPS WHICH WILL BE TAKEN TO AVOID FURTHER DEVIATIONS
A review was performed to ensure no other procedures exist outside the
Based on this review it is
believed
that
this
was
an
isolated
event
requiring
no
further
corrective
actions.
Procedures (OSP-0008, OSP-0009) are in place to require
revisions
to
the
to
be
done
in
accordance
with the procedure generation
package (PGP).
DATE WHEN FULL COMPLIANCE WILL BE ACHIEVED
V&V will be conducted on procedure
revisions
by
January
30,
1987.
Further
revisions
necessitated
from
the
process
will
be
incorporated, reviewed and approved by February 15, 1987.
Shift
crew
training
on
the
subject
revisions
will
be
provided
prior
to
implementation.
!