Forwards Insp Rept 50-382/86-20 on 861027-31.No Violations or Deviations Noted.Response Should Include Plans for Completion of post-accident Operator Training & Site Acceptance Testing,Per NUREG-0737
ML20215D826
Person / Time
Site: Waterford Entergy icon.png
Issue date: 12/11/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Dewease J
LOUISIANA POWER & LIGHT CO.
Shared Package
ML20215D828 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8612170052
Download: ML20215D826 (2)


See also: IR 05000382/1986020

Text

_

  • '

OEC 1 1 1986

In Reply Refer To:

Docket: 50-382/86-20

Louisiana Power & Light Company

ATTN: J. G. Dewease, Senior Vice President

Nuclear Operations

317 Baronne Street.

P. O. Box 60340

New Orleans, Louisiana 70160

Gentlemen:

This refers to the inspection conducted by Mr. R. Wise and Dr. J. B. Nicholas

of this office during the period October 27-31, 1986, of activities authorized

by NRC Operating License NPF-38 for Waterford Steam Electric Station, Unit 3,

and to the discussion of our findings with Mr. R. P. Barkhurst and other

members of your staff at the conclusion of the inspection.

Areas examined during the inspection included your chemistry / radiochemistry

program and radiochemistry confirmatory measurements. Within these areas, the

inspection consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the NRC inspectors.

The inspection findings are documented in the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

identified. However, we are concerned with the planned design changes and

modifications regarding your postaccident sampling system. Accordingly, you

are requested to provide to this office, within 30 days of the date of this

letter, information to insure that the new postaccident sampling system will

perform in accordance with the requirements of NUREG-0737. Your response

should include your plans for completion of postaccident operator training and

site acceptance testing.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

ORIGINAL SIGNED BY:

8612170052ho0382

PDR ADOCK PDR J. E. Gagliardo, Chief

G Reactor Projects Branch

Enclosure:

Appendix - NRC Inspection Report

50-382/86-20 with

Attachments 1 and 2

cc w/ enclosure: (see next page)

. . .

p

RIV:FRPSkn FRPS $ C:FRP C:R&SPEh . C C:RPB /

JBNicholasitw RWise 4BMurry WLFisher G onstable JEGagl do

y / 2,( /86 lf/y/86/ d//6/86 $ /$ /86 rl/(;/86 &/f / b,

,

/ I (

, Y ,

- .- . _

,

-1. . . ,-

Louisiana Power & Light Company -2-

cc w/ enclosure:

Louisiana Power'&. Light Company- ,

ATTN: G. E._Wuller, Onsite

Licensing Coordinator

P. O. Box B

Killona, Louisiana 70066

. Louisiana Power & Light Company

ATTN: R..P. Barkhurst, Plant Manager.-

.

P. O. Box B

Killona, Louisiana .70066 '

Middle South Services

ATTN: . Mr..R. T. Lally

P. O. Box 61000

New 0Fleans, Louisiana 70161

Louisiana Power.& Light Company

ATTN: K. W. Cook, Nuclear Support

and Licensing Manager

317 Baronne Street

P. O. Box 60340-

New Orleans,_ Louisiana 70160

Louisiana Radiation Control Program Director

bec to_DMB (IE06)

bec distrib. by RIV:

  • RPB *D. Weiss,~LFMB (AR-2015)
  • RRI .

R. D. Martin, RA

  • Section Chief (RPB/C) DRSP
  • R&SPB *RSB
  • MIS System *B. Nicholas, FRPS
  • RSTS Operator *R. Wise, FRPS
  • RIV File- *B. Murray, FRPS

R. Bangart, DR$&S *W. L. Fisher

  • w/766

. - _ _ . -