~- - 3
+
r i
..t
'+
^*
c DEC.51906 s
p.
3 -
9;
-In' Reply Refer To:
- Docket: 50-458_
' Gulf States Utilities p'
ATTN: William J.' Cahill.. Jr.
Senior Vice President.
oF River Bend Nuclear Group k
P. O. Box 220 h
'St. Francisville, Louisiana 70775 b
[
Gentlemen:
This refers to the Enforcement Conference conducted in the NRC Region IV office on November 10, 1986, with you and other members of your staff.
The Enforcement Conference was held to discuss the findings of the NRC special inspection conducted during the period October 16-23, 1986, and documented in our inspection report dated October 30, 1986.
3 The subjects discussed-at this meeting are described in the enclosed Meeting Summary. Enforcement action, if appropriate, will be addressed in separate correspondence.
It is our opinion that this meeting was beneficial and has provided for a better understanding of the concerns identified during the inspection.
In-aCCordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter will be placed in the NRC's Public Document Room.
Should.you have any questions concerning this matter, we will be pleased to discuss them with you.
Sincerely.
Origad rhnr3 af J. E. Cagiardo J. E. Gagliardo, Chief Reactor Projects Branch cc w/ attachments:
(seenextpage)
RIV:RPB/A W C: P A C:RPB JEGag/8%
(f) l drdo WR8ennett:cs J Jaudon 12/ y/86 1/q /86 12/f 8612170043 061205 i
PDR ADOCK 05000450 G
\\--
.(s f?p,,
1, y+ i. 97
~
'l-fi' 7
, s
.j -
v; i
y,-
- p q.
i 3 ;w,'
4 r
q.;
i.
.;3.
- ~
h
~
)( <,1
' f Gulf St'ates' Utilitites'- "
p p:
v.
)
, ?.,!
~-
+..
,,t.
,.cc'w/ attachments:
'/
f
,4
~ Gulf States. Utilities z
4 ' 'f., 7
~
ATTN:
J. E. Booker, Manager-4
- d ', F S
Engineering, Nuclear -
.. e
- /
Fuels & Licensing
/
2 P.>'O. Box'.2951 f
' l )'
{-
s Beaumont, Texas 777041
}
i c
s Louisiana State University, c*
'i >. '
,i /'
$l 2 A Government Documents Department SD Louisiana Radiation Control Program Director-4
/
f bec to DMB-(IE01)
.t y
. g.
~
bec distrib. by RIV:
J /.
II RPB DRSP i
d 1
[
', s I Resident Inspector R. D. Martin, RA
+1-Section Chief (RPB/A)
D. Weiss, LFMB (AR-2025) i
?
MIS System RSB l
I 1
',f
/,
RSTS Operator
. Project Inspector s/
l
/,.
p, R&SPB i,,. -
..A e
RIV File c! 's
- r.,,, y. '
t 7,
'm w ([ *
,3 v
f*
6
.l t
s
(,
I t Y
(,
s f
I
(
/
'l
)
i t
{
1
/
e s
k I'
i 1
/
g
'i y
8.
g.
r E
l
- 4,
-._.a....,,.._.,,-.-,,-,_,;-,_$_-
- Gulf States Utilities-
' Attachment A MEETING
SUMMARY
Licensee:
Gulf States Utilities.
Facility:
River Bend Station License No.:
NPF-47 Docket No.:
50-458
Subject:
Enforcement Conference Concerning)the NRC Special Inspection Findings (NRCIRNo. 50-458/86-36 On November 10, 1986, representatives of Gulf States Utilities, met in Arlington, Texas, with NRC Region IV personnel to discuss the findings documented in the NRC inspection report dated October 30, 1986. The attendance list is attached as, Appendix A to this summary. The meeting was held at the request of NRC, Region IV.
The NRC presented the concerns from the special inspection, including the initial inadequate unreviewed safety question determination and the subsequent repetition of the error. The licensee discussed subsequent calculations which demonstrated that no equipment damage would have occurred with proper operator action and the upgrade of the program to determine unreviewed safety questions.
Attachment:
Appendix A - Attendance' List e
4 4
7 I
,s
-~
~ _
y, i,
s O
J' S
' APPENDIX A ENFORCEMENT CONFERENCE ATTENDANCE LIST REGION IV GULF STATES UTILITIES k
L LNRC Attendees:
W. R. Bennett, Project Engineer, Project Section A, Reactor Projects Branch D. D. Chamberlain, Senior Resident Inspector, River Bend J. E.~ Gagliardo, Chief,. Reactor Projects Branch R..E. Hall, Deputy Director, Division of Reactor Safety and Projects, J. P. Jaudon, Chief, Project Section A, Reactor p
Projects Branch' E. H. Johnson, Director, Division of Reactor Safety and Projects D. A. Powers; Enforcement Officer, RIV Licensee Attendees:
J. E. Booker, Manager, River Bedd Oversight Wl.J. Cahill, Senior Vice President J. D. Deddens, Vice President E. R. Grant Director, Nuclear Licensing J. R. Hamilton, Director, Design Engineering G. K. Henry, Supervisor, Electrical Engineering and Special Projects T. F. Plunkett, Plant Manager
~ '
M..F. Sankovich, Manager, Engineering
(
.---n, m