Monthly Operating Rept for Jul 1986
ML20215D731
Person / Time
Site: Palo Verde 
Issue date: 07/31/1986
From: Haynes J, Hull J
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Scroggins R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
ANPP-37786-JGH, NUDOCS 8610140269
Download: ML20215D731 (6)


Text

.

e NRC MONTHLY OPERATING REPORT DOCKET NO.

50-528 UNIT NAME

_P U _G _5 ~ 1-_

DATE 08/11/86-COMPLETED BY

- _. _L.- - _H u l l---

J TELEPHONE 99_2-93_2-9309 Egt2_@g93 OPERATING _ST_ATU_S 1.

Unit Name: Palo_ Verde _Nuglear_Gengrating_Statignt_ Unit _1 2.

Reporting Period: July _1986 3.

Licensed Thermal Power (MWt): 3899 4.

Nameplate Rating (Gross MWe): 1493 5.

Design Electrical Rating (Net MWe):

1221 6.

Maximum Dependable Capacity (Gross MWe): 1393 7.

Maximum Dependable Capacity (Net MWe):

1221 8.

If Changea Occur In Capacity Ratings (Items Number 3 Through 7)

Since Last Report. Give Reasons:

9.

Power Level to Which Restricted, If Any (Net MWe): _NONE_________

10.

Reasono For Restrictions, If Any:

This Month Yr.-to-Date Cumulative 11.

Hours in Reporting Period

____744___

___4995____

___4956___

12.

Number of Hours Reactor Was Critical 506.9 1958.2

- 1958.2 13.

Reactor Reserve Shutdown Hours O

O

~~

O

~~~~ 5575~

15.

Unit Reserve Shutdown

~~~~~~~~~~

~~~[56578~~~~~~~~~~~

~~~i56575~

14.

Hours Generator On-Line 4

~~~~~~~~~~

}

Houra'

_____g____

_____g_____

_____g____

16.

Gross Thermal Energy Generated (MWH) i 814 285_

_6 89Zt@23,

_@t897 623 t

t t

t 17.

Gross Electrical Energy Generated (MWH)

__626 2QO_

_2 3ZZt80g_

_2 327 Ggg t

t t

t 18.

Not Electrical Energy Generated (MWH)

__572 632_

_2t188 Z57_

_2t188 757 t

t t

19.

Unit Service Factor

___67.Q53_

____46.993_

____46.993 20.

Unit Availability Factor

___67 g53_

____46.993_

____46.993 t

21.

Unit Capacity Factor (Uning MDC Net)

___63.043_

____44.203_

____44.2Q3 22.

Unit Capacity Factor (Uning DER Not)

___63.043_

____44.203_

____44.2Q3 23.

Unit Forced Outage Rate

___32.95g_

____13.193_

____13.193 24.

Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

25.

If Shutdown At End of Report Period, Estimated Date of Startup:


~~----------------------

26.

Unita in Test Status (Prior To Conmercial Operation):

Forecast Achieved INITIAL CRITICALITY

-- - _/ 8 5----

5

--- _2_5 / 8 5_

5/

INITIAL ELECTRICITY 6

_ - _ _/ _8_5_ _

- _6 _/ _1 0 / _8 5--

COMMERCIAL OPERATION

_11/95__

_2f13fg@_

8610140269 860731

{DR ADOCK 05000528 (k(

PDR

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. ~~50-528

~~~~

UNIT ---------PV. G5__1 -

DATE 08/11/86 COMPLETED BY J.L.

Hull 5652 52 55_6_6~~~

9 2

TELEPHONE ---

DOETJJ *.

July 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 1186-------------

17 - - - - -.

1 O

1 2

1 168 18 O

s-----_--------

s------

19 O

1 223 3

4


_-_-_1z232-----_---_---

20 0

- _1 _2_37------------

21 0

5 2

6 1 247 22 0

z------_-------


1252 23 612 1

7 x--.4 24 --------- 2168---

1 24 1

8

'3 1 231 25 --------- 2217 1

1--------------

10 1 234 26 1 220 x--------------

a------------_--

11 1 238 27 ---.----- 2217 1

z--------------

12 538 28 --------- 2_221---------_----

1 0

29 -- - -- - -- -.1. 2.2. 4 4 13 ---_

14 0

30 - - - - - - - - - _1 e _2 4 7--------------

15 0

31 12248--------------

16 - - - - - __-_ --------- -------

0

n s

t.

REFUELING INFORMATION DOCKET NO.

59-529_______

UNIT PVNGS-1______

DATE 99/11/p9_____

COMPLETED BY J.L._ Hull ____

TELEPHONE 902-932-5300_

Eyt3_@593,___

1.

Scheduled date for next refueling shutdown.

03/13/87 2.

Scheduled date for restart following refueling.

04/19/87 3.

Will refueling or resumption or operation thereafter require a Technical Specification change or other license amendment?

Not Yet Determitied What will these be?-

Not Yet Determinad 4.

Scheduled date for submitting proposed licensing action and supporting inforstation.

Not'Yet Determined 5.

Important Licensing considerations associated with refueling, e.g.

new or differant fuel design or supplier, unreviewed design or performance ana;.ysis methods, significant changes in fuel design, new operating procedures.

Not Yet Determined 6.

The number of fuel assemblica.

a)

In the core..____241____

b)

In the spent fuel storage pool.

O 7.

Licensed spent fuel storage capacity.

___13_29___

Intended change in spent fuel storage capacity.

___Ngge___

8..

Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.

2002 (w/ annual roloads and full core discharge capability).

r w

(,.

SUMMARY

.0F OPERATING EXPERIENCE FOR THE MONTH DOCKET NO.

59-52e_______

UNIT PVNGS-1______

DATE.

'Qg/11/gg_____

COMPLETED BY J.L._ Hull ____

TELEPHONE 992-932-5399_

Egt _g593____

3 07/01 0000' Reactor Power'1004' Mode 1.

07/12 1045 Reactor trips on channel A' low SG 2 RC flow.

Two Main Steam Safety Valves actuated.

07/22 0759' Reactor Critica1' entered Mode 2 Reactor Power >10-4%

07/22 1315 Entered Mode 1 Reactor Power 18.6%

07/22 1552 Synched Main Generator to grid 07/22 0517 Reactor Power 59.5%

07/24 0115 Reactor Power greater.than 704 07/24 0517 Reactor Power 99.79%

s

~C

' UNIT SHUTDOWNS AND POWER AED NTIONS.'*

DOCKET NO.

Mn-9?A UNIT NAMC PVNrs-I

  • ~'

}

DATC d511450' COMPLETED BY

.IOY HUT T -

TELErlf0NC 9 U-S mo r.r A%n1 e

Method or

- Shutting i

Down System Component Cause ar Corrective 1

Duration 2

3 f.ER 4

5 Action to No.

Date Type (Ifours)

Reason Reactor No.

Code Code '

Prevent Recurrence i

5 07/12/86 F

237.1 A

3 1-86-047 JC PD Rx trip on channel A & B Low SG 2 RC flow t

i t

i l

l i

l s

i t

4 i

1 2

3 4

)

r-Fo rced Rensnn; Method:

Exhibit F - Instructions S-Scheduled A-Eaulpment re fluro (Explain) 1-Hanual for Proparation or Data D-Maintenance or Test 2 Hanual Scram.

Entry 5ficots for Licensee i

C-Rcrucling 3-Automa tic Scram.

Event Report (LCR) File l

D-negulatory Restriction 4-Continua tion f rom-(nun [C 0161) l E-Onorator Training h License Examinet ton Provfous Month j

r-Administrative 5-neduction or 20%

5 C-operational Error (Explain), '.

or Creator in the Exhibit H.sene Source H-Other (Explain) rast 24 Ilours g.

9-other iExplain) i o n h a..

I

f \\.'

u s

"~

Arizona Nuclear Power Project P.O. Box $2034 e PHOENIX, ARI2oNA 85072-2034 August 18, 1986

~

~

Mr. Ronald M. Scroggins, Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Unit 1 Docket No. STN 50-528 (License NPF-41)

July Monthly Operating Report File: 86-024-404

Dear Mr. Scroggins:

Attached please find the July, 1986, Monthly Operating Report prepared and sub-mitted pursuant to Specification 6.9.1.6 of Appendix A (Technical Specifications) to the Palo Verde Nuclear Generating Station, Unit 1 Operating License. By copy of this letter we are also forwarding a copy of the Monthly Operating Report to the Regional Administrator of the Region V office.

If you have any questions, please contact me.

Very truly yours, W

J. G. Haynes Vice President 9

Nuclear Production JGil/PGN/rw Attachment 4

cc:

0. M. De Michele (all w/a)

E. E. Van Brunt, Jr.

J. B. Martin R. P. Zimmernan E. A. Licitra A. C. Gehr INPO Records Center k

10