ML20215D705

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 860901-1103
ML20215D705
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 12/10/1986
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20215D697 List:
References
50-498-86-26, 50-499-86-24, NUDOCS 8612170005
Download: ML20215D705 (2)


Text

_ _

s .

s APPENDIX'A i

' NOTICE OF VIOLATION Houston Lighting and Power Dockets: 50-498 South Texas Project Units 1 & 2 50-499 Permits: CPPR 128 CPPR 129 During an NRC inspection conducted on September 1 through November 3,1986, a violation of NRC' requirements was identified. The violation involved failure to follow procedures for dealing with nonconforming items. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions,"

10 CFR Part 2, Appendix C (1986), the violation is listed below:

Criterion V of 10 CFR 50, Appendix B, requires that activities affecting quality be prescribed by documented instructions or procedures, and shall be accomplished in accordance with these instructions or procedures. The South Texas Quality Assurance Plan, Section 5 implements this requirement.

Standard Site Procedure (SSP) 8, "Nonconformance Reporting," Section 5.2.11.6 requires that when nonconforming items are being transferred, e.g. between construction and operations, the organization involved must transfer the appropriate docunents such as hold tags.

SSP-8 Section 5.2.11.6 also requires that when transferring nonconforming items they will be properly tagged.

Contrary to the above, on August 8,1986, the NRC inspector observed an installed valve, D0-0132, serial number EG 288-40-4, in the diesel fuel oil (D0) system with a construction hold tag attached. The D0 system had been turned over to startup and should have had an operations hold tag attached.

Also on September 23, 1986, the NRC inspector noted that the licensee had failed to transfer the hold tag, which indicated a damaged shaft and bearings, on the 1A Centrifugal Charging Pump to the damaged shaft and bearings after they were replaced on August 4,1986.

This is a Severity Level IV violation. (Supplement I)(498/8626-01; 499/8624-01)

Pursuant to the provisions of 10 CFR 2.201, Houston Lighting & Power Company is hereby required to sub. nit to this office, within 30 days of the date of the letter transmitting this Notice, a written statement or explanation in reply, including for each violation: (1) the reason for the violation if admitted, (2) the corrective steps which have been taken and the results achieved, g2170005861210 g ADOCK 0S000499 PDR

"a s . N.  !

l o ,

s s_.

."2-k' (3) the corrective steps which will be taken to avoid further violations, and

.(4) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the' response time.

i l

Dated at Arlington, Texas '

this /0 6. day of D # 1986  ;

4. 3.,

Y 'y

,4, Y'

)

i T. '

(

'g ,

I' k

i

, -