ML20215D464
| ML20215D464 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 12/08/1986 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Pilant J NEBRASKA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20215D467 | List: |
| References | |
| NUDOCS 8612160370 | |
| Download: ML20215D464 (2) | |
See also: IR 05000298/1986030
Text
.
,
8 D36
In Reply Refer To:
Docket: 50-298/86-30
Nebraska Public Power District
ATTN:' J. H. Pilant, Manager, Technical
Staff - Nuclear Power Group
P. O. Box 499
Columbus, Nebraska
68601
Gentlemen:
This refers to the inspection conducted by Messrs. W. M. McNeill and
J. I. Tapia of this office during the period November 3-7, 1986, of activities
authorized by NRC Operating License DPR-46 for Cooper Nuclear Station, and to
the discussion of our findings with Mr. G. R. Horn and other members of your
staff at the conclusion of the inspection.
Areas examined during the inspection were onsite followup of written reports of
two nonroutine events and actions you have taken with regard to previously
identified inspection findings. Within these areas, the inspection consisted
of selective examination of procedures and representative records, interviews
with personnel, and observations by the NRC inspectors. The inspection
findings are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements. Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations. Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
Seven unresolved items are identified in paragraph 4 of the enclosed inspection
report. You are also requested to address, in your written response, each of
the unresolved items. The response should provide the additional information
needed to resolve the issue.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
8612160370 861208
Oridnd Chnad By
ADOCK 05000290
J.E.C a trdo
G
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosures: (see next page)
[
RIV:RPB/Adv6
RSB d
RPB
d
McNeill/:dp
JITapia
JPJdudon
JEGagfiardo
y////86
g/\\/86
h/ k86
i/: /86
'
!
,
I
,
_ 7--
6
,
Nebraska Public Power District
-2-
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-298/86-30
cc w/ enclosures:
Guy Horn, Division Manager
of Nuclear Operations
Cooper Nuclear Station
'P. O. Box 98
Brownville, Nebraska
68321
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
bec distrib. by RIV:
- RPB
DRSP
- RRI
R. D. Martin, RA
,
- Section Chief (RPB/A)
- 0. Weiss, LFMB (AR-2015)
- R&SPB
- RSB
- MIS System
- M.
Skow
- RIV File
- W. McNeill
- RSTS Operator
- J. Tapia
- w/766