Forwards Insp Rept 50-029/86-18 on 861020-24.Deficiency Noted Re Failure to Ensure Qualification of Internal Control Wiring in safety-related Limitorque Motor Valve Operators. Potential Enforcement/Unresolved Item Encl
ML20215D379
Person / Time
Site: Yankee Rowe
Issue date: 12/05/1986
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To: Heider L
YANKEE ATOMIC ELECTRIC CO.
Shared Package
ML20215D382 List:
References
NUDOCS 8612160344
Download: ML20215D379 (3)


See also: IR 05000029/1986018

Text

.. .

_ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ , _

~

,.

p erg

,%

k

UNITED STATES

y

g

NUCLEAR REGULATORY COMMISSION

O

j

WASHINGTON, D. C. 20555

December 5, 1986

+.***

Dock 2t No.50-029

,

I

Yankee Atomic Elects.ic Company

l

ATTN: Mr. L. H. Heider

Vice President

,

1671 Worcester Road

Framingham, Massachusetts, 01701

Gentlemen:

SUBJECT: INSPECTION NO. 50-029/86-18

Enclosed is the report of the team inspection conducted by Mr. G. T. Hubbard

and other NRC representatives on October 20-24, 1986, at the Yankee Atomic

Electric Company offices, Framingham, Massachusetts, and the Yankee Rowe

Nuclear Power Plant, Rowe, Massachusetts, of activi. ties authorized by NRC

License DPR-3. The team's findings were discussed with you and members of

your staff at the conclusion of the inspection. The inspection reviewed your

implementation of a program for establishing and maintaining the qualification

of electric equipment within the scope of 10 CFR 50.49. Within these areas, the

inspection consisted of examination of selected procedures and records, inter-

views with personnel, and observations by the inspectors.

The inspection determined that you have implemented a program to meet the

requirements of 10 CFR 50.49 except for the deficiency identified in the

enclosed inspection report. The deficiency, summarized in Appendix A, is

classified as a Potential Enforcement / Unresolved Item (PE/UI) and will be

referred to the NRC Region 1 Office for further action. The ceficiency

involved failure to ensure oualification of internal control wiring in safety-

related Limitorque motor valve operators.

Your corrective action regarding the identified deficiency was reviewed during

the inspection, and found acceptable.

We are available to discuss any questions you have concerning this inspection.

Sincerely,

o

j

g

C-

-

Robert F. Heishman, Chief

Vendor Program Branch

Division of Quality Assurance, Vendor

and Technical Training Center Programs

Office of Inspection and Enforcement

Enclosures:

1.

Appendix A-Potential Enforcement /

~

Unresolved Item

(

2.

Inspection Report No. 50-029/86-18

{

kbDO

I

l

G

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .

.

..

)

Yankee Atomic Electric Company

-2-

December 5, 1986

DISTRIBUTION:

1

] Y W .E.? E $

NRC PDR

VPB Reading

DQAVT Reading

JTaylor

RStarostecki

BGrimes

HMiller

RFHeishman

UPotapovs

GHubbard

0Gormley

RLasky

SAlexander

RWilson

JStone

LParker

NLe, NRR

EMcKenna, NRR

MJJacobus, SNL

DEJackson, INEL

WRCarpenter, INEL

JThomas, DPC

HEichenholz, SRI, Yankee Rowe

REGION I DISTRIBUTION

JDurr, DRS

CAnderson, DRS

SEbneter, DRS

WJohnson, DRS

LCheung, DRS

MDev, DRS

RI Docket Room (w/ concurrence)

Management Assistant, DRMA (w/o enclosure)

DRP Section Chief

RBores, DRSS

  • see previous page for concurrence

VPB:00AVT*

SC/VPB:00AVT*

RI*

PC/VPB:00AVT*

GTHubbard: sam

UPotapovs

CAnderson

RFHeishman

12/3/86

12/4/86

12/4/86

12/5/86

..

..

APPENDIX A

Potential Enforcement / Unresolved Item

~

.

As a result of the equipment qualification (EQ) inspection on Qctober 20-24,

1986, the following item has been referred to NRC Region I as a Potential

Enforcement / Unresolved Item (paragraph references are to detailed portions

of the inspection report).

Contrary to paragraphs (f) and (k) of 10 CFR 50.49 and sections 5.2.2 and

5.2.6 of the D0R Guidelines, Yankee Atomic Electric Company (YAEC) failed

to ensure that after the qualification deadline of June 1984 (second

refueling outage after March 31,1982) or after the extended deadline date

(with NRC Staff approved extensions) of November 30, 1985, outside contain-

ment Limitorque motor valve operators required to be qualified at Yankee Rowe

were in an installed condition similar to that in which they were tested in

that YAEC did not have assurance that internal control wiring was either the

^

'

same as that tested with the actuators or, if different, that it was qualified

separately. During the inspection, the NRC inspectors determined that

qualified wires were subsequently installed in the outside containment

Limitorque operators.

(Paragraph 4.D.(2)(a), Item 50-029/86-18-01)

-.

.

.