SEP 3 01986 lorida Power and Light Company ATTN: Mr. C. O. Woody Group Vice President Nuclear Energy Department P. O. Box 14000 Juno Beach, FL 33408 Gentlemen:
SUBJECT:
MEETING
SUMMARY
, DOCKET NOS. 50-250 AND 50-251 This refers to the meeting conducted at our request in the Region II office on September 11, 1986.
This meeting was held to discuss the quarterly update of Turkey Point's Performance Enhancement Program (PEP).
This meeting related to activities authorized by NRC license Nos. DPR-31 and DPR-41 for Turkey Point Units 3 and 4, respectively.
A sumary of the meeting. topics is provided in.
A list of attendees at the. meeting is shown in Enclosure 2.
It is our opinion that this meeting was beneficial in that it provided us with an update on your continuing progress and a better understanding of this subject.
In accordance with Section 2.790 of NRC's
- Rules of Practice," Part 2, Title 10, Code of Federal Regulations, a copy of this letter and its enclosures will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely, Original Signed by
. Roger D. Walker Roger D. Walker, Director Division of Reactor Projects
Enclosures:
1.
Summary of Meeting 2.
List of Attendees l
Ac w/encls:
/ C. M. Wethy, Vice President f Turkey Point Nuclear Plant l
v C. J. Baker, Plant Manager l
Turkey Point Nuclear Plant
/L.W.Bladow,PlantQASuperintendent J. Arias, Jr., Regulatory and Compliance Supervisor
)cc w/encls:
8610100480 e60930 VNRC Resident Inspector PDR ADOCK 05000250 Document Control Desk G
?
l L. rey Y
CChristensen:jd SElro DV relli VPan-a C/
9/7 86 9/2A/86 9/bf/86 9/ /86 J
f9b$
)
~
ENCLOSURE 2 MEETING ATTENDEES Licensee-Attendees 4
E. A. Adomat, Executive Vice President C. O. Woody, Group Vice President, Nuclear Energy J. W. Dickey, Vice President, Nuclear Operations C. M. Wethy, Vice President, Turkey Point Nuclear Plant C.-J. Baker,. Plant Manager, Turkey Point E. Preast, Engineering Site Manager J. W. Kappes, Maintenance Superintendent R. J. Acosta, PEP Manager NRC Attendees L. A. Reyes, Deputy Director, Division of Reactor Projects (DRP)
V. W. Panciera, Deputy Director, Division of Reactor Safety (DRS)
S. A. Elrod, Chief, Reactor Projects Section 2C (RP2C), DRP W. K. Poertner, Reactor Inspector, DRS H. O. Christensen, Project Inspector, RP2C, DRP e
I l