ML20215C755

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-424/86-16 of Readiness Review Module 17, Raceways. Util Activity Control Programs for Implementation of Design & Const for Raceways Acceptable, Except for Items Identified in Rept
ML20215C755
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 12/08/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20215C758 List:
References
NUDOCS 8612150383
Download: ML20215C755 (3)


See also: IR 05000424/1986016

Text

-

~

_ _ _

,

,

bM

.

.

.-

,

gc 0 g $86

Docket No. 50-424

License No. CPPR-108

Georgia fower Company

ATTN:@r. J. H. Miller, Jr.

President

P. O. Box 4545

Atlanta, GA 30302

Gentlemen:

SUBJECT: NRC REVIEW 0F V0GTLE READINESS REVIEW MODULE N0. 17, RACEWAYS

(NRC INSPECTION REPORT N0. 50-424/86-16)

The NRC has completed a detailed review, inspection, and verification of the

subject module which you submitted to the NRC on March 4,1986.

Periodic

inspections were conducted at the Vogtle site, and the result and findings were

discussed with members of your staff at the conclusion of these inspections.

Technical reviews also were conducted in NRC Bethesda offices, and the findings

from these reviews have been discussed with your staff.

Areas contained in the module, which were reviewed, examined, and verified, are

identified in the enclosed report.

Within these areas, the inspection and

verification consisted of selected examinations of procedures and representative

records, discussions with personnel, observations of activities in progress, and

review of your licensing commitments.

The results of Module No.17 reviews and inspections are summarized into the

categories of violations, unresolved items, and inspector followup items.

Your

attention is invited to these matters which will be pursued during future

licensing reviews and inspections.

'

Based upon the NRC review and inspection of those activities identified in the

module, we have determined that the applicant's activity control programs for

implementation of design and construction for raceways for safety-related systems

at Vogtle Unit No.1 are acceptable and comply with applicable regulatory

requirements with the exception of those items or areas identified in the

enclosed report.

This decision is based on information currently available to

the inspectors and reviewers.

Should information subsequently become available

which was not considered during this review or which conflicts with earlier

information, it will be evaluated to determine what effect it may have on the

above conclusion.

Should you have any questions concerning this letter, please contact us.

Sincerely,

g2] gob 8612080500M4

OmGmu r d0J6

J,N E , GRACE

i

'

O

J. Nelson Grace

Regional Administrator

g&

Enclosure:

(See page 2)

3CO

l

(-

g

m

I

a

.

DEC 0 81986

Georgia Power Company

2

Enclosure:

NRC Inspection Report

cfw/ encl:

W . P. O'Reilly, Senior Vice President

/ Nuclear Operations

A.E.Conway,SeniorVicePresident&

d.ProjectDirector

O. Foster, Vice President, Project

Support

P. D. Rice, Vice President, Project

g. Engineering

H. Pinson, Vice President, Project

, Construction

f.T.Beckham,VicePresident&

j General Manager - Operations

VR. A. Thomas, Vice President,

M. Licensing

S. Read, General Manager,

Quality Assurance

. W. Hayes, Vogtle Quality

h.AssuranceManager

C. Ramsey, Manager -

Readiness Review

d B. Bockhold, General Manager,

d.NuclearOperations

Gucwa, Manager, Nuclear Safety

and Licensing

/.H.Googe, Project

C

/ onstruction Manager

J . D. Groover, Quality

Assurance Site Manager -

/ Construction

ud. A. Bailey, Project Licensing

xI. Manager

F. Trowbridge, Esq., Shaw,

h.Pittman,PottsandTrowbridge

W. Churchill, Esq., Shaw,

/ Pittman, Potts and Trowbridge

Vc. L. Blake, Jr. , Esq. , Shaw,

f Pittman, Potts and Trowbridge

J . E. Joiner, Troutman, Sanders,

).ockerman and Ashmore

V. G. Ledbetter, Commissioner,

yd.DepartmentofHumanResources

H. Badger, Office-of Planning

and Budget

(cc w/ encl cont'd - see page 3)

..

(

'

a

I

DEC0 8 GB6

.

,

Georgia Power Company

3

(A'cw/enci-cont'd)

W . Kirkland, III Counsel,

Office of the Consumer's Utility

/. Council

Feig,

Georgians Against

/ uclear Energy

N

W. B. Margulies, Esq. , Chainnan,

Atomic Safety and Licensing Board

Panel

r. O. H. Paris, Administrative Judge

Atomic Safety and Licensing Board

/ anel

P

f. A. Linenberger, Jr., Administrative Judge

Atomic Safety and Licensing Board

Panel

B. P. Garde, Citizens Clinic, Director

Government Accountability Project

c w/ encl:

Reis OGC

. M. Hill, IE

. Miller, NRR

. Brach, 0GC

i Sinkule, RII

. Christnot, RII

AIRC Resident Inspector

Document Control Desk

State of Georgia

RII

RII

RI

RIT

RII

Rd

VPA iera

VB wnlee

Mc

5

b

C

o

AHe t

<

9/f/86

9/ /86

9/p/86

9/[

86

.#/f/96

gf gg

'

RII

k

RI

RII

R

l

RWalker

TNovak

BG i es

EChristenbury

Q9/-/86 -

p9/g/86

09/ /86

,0 /

86

(

l

9/fj/G

o

's

,

. ..

_ _ _ _

-_

-

.

-

-