bM
.
.
.-
,
gc 0 g $86
Docket No. 50-424
License No. CPPR-108
Georgia fower Company
ATTN:@r. J. H. Miller, Jr.
President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: NRC REVIEW 0F V0GTLE READINESS REVIEW MODULE N0. 17, RACEWAYS
(NRC INSPECTION REPORT N0. 50-424/86-16)
The NRC has completed a detailed review, inspection, and verification of the
subject module which you submitted to the NRC on March 4,1986.
Periodic
inspections were conducted at the Vogtle site, and the result and findings were
discussed with members of your staff at the conclusion of these inspections.
Technical reviews also were conducted in NRC Bethesda offices, and the findings
from these reviews have been discussed with your staff.
Areas contained in the module, which were reviewed, examined, and verified, are
identified in the enclosed report.
Within these areas, the inspection and
verification consisted of selected examinations of procedures and representative
records, discussions with personnel, observations of activities in progress, and
review of your licensing commitments.
The results of Module No.17 reviews and inspections are summarized into the
categories of violations, unresolved items, and inspector followup items.
Your
attention is invited to these matters which will be pursued during future
licensing reviews and inspections.
'
Based upon the NRC review and inspection of those activities identified in the
module, we have determined that the applicant's activity control programs for
implementation of design and construction for raceways for safety-related systems
at Vogtle Unit No.1 are acceptable and comply with applicable regulatory
requirements with the exception of those items or areas identified in the
enclosed report.
This decision is based on information currently available to
the inspectors and reviewers.
Should information subsequently become available
which was not considered during this review or which conflicts with earlier
information, it will be evaluated to determine what effect it may have on the
above conclusion.
Should you have any questions concerning this letter, please contact us.
Sincerely,
g2] gob 8612080500M4
OmGmu r d0J6
J,N E , GRACE
i
'
O
J. Nelson Grace
Regional Administrator
g&
Enclosure:
(See page 2)
3CO
l
(-
g
m
I
a
.
DEC 0 81986
Georgia Power Company
2
Enclosure:
NRC Inspection Report
cfw/ encl:
W . P. O'Reilly, Senior Vice President
/ Nuclear Operations
A.E.Conway,SeniorVicePresident&
d.ProjectDirector
O. Foster, Vice President, Project
Support
P. D. Rice, Vice President, Project
g. Engineering
H. Pinson, Vice President, Project
, Construction
f.T.Beckham,VicePresident&
j General Manager - Operations
VR. A. Thomas, Vice President,
M. Licensing
S. Read, General Manager,
Quality Assurance
. W. Hayes, Vogtle Quality
h.AssuranceManager
C. Ramsey, Manager -
Readiness Review
d B. Bockhold, General Manager,
d.NuclearOperations
Gucwa, Manager, Nuclear Safety
and Licensing
/.H.Googe, Project
C
/ onstruction Manager
J . D. Groover, Quality
Assurance Site Manager -
/ Construction
ud. A. Bailey, Project Licensing
xI. Manager
F. Trowbridge, Esq., Shaw,
h.Pittman,PottsandTrowbridge
W. Churchill, Esq., Shaw,
/ Pittman, Potts and Trowbridge
Vc. L. Blake, Jr. , Esq. , Shaw,
f Pittman, Potts and Trowbridge
J . E. Joiner, Troutman, Sanders,
).ockerman and Ashmore
V. G. Ledbetter, Commissioner,
yd.DepartmentofHumanResources
H. Badger, Office-of Planning
and Budget
(cc w/ encl cont'd - see page 3)
..
(
'
a
I
DEC0 8 GB6
.
,
Georgia Power Company
3
(A'cw/enci-cont'd)
W . Kirkland, III Counsel,
Office of the Consumer's Utility
/. Council
Feig,
Georgians Against
/ uclear Energy
N
W. B. Margulies, Esq. , Chainnan,
Atomic Safety and Licensing Board
Panel
r. O. H. Paris, Administrative Judge
Atomic Safety and Licensing Board
/ anel
P
f. A. Linenberger, Jr., Administrative Judge
Atomic Safety and Licensing Board
Panel
B. P. Garde, Citizens Clinic, Director
Government Accountability Project
c w/ encl:
Reis OGC
. M. Hill, IE
. Miller, NRR
. Brach, 0GC
i Sinkule, RII
. Christnot, RII
AIRC Resident Inspector
Document Control Desk
State of Georgia
RII
RII
RI
RIT
RII
Rd
VPA iera
VB wnlee
Mc
5
b
C
o
AHe t
<
9/f/86
9/ /86
9/p/86
9/[
86
.#/f/96
gf gg
'
RII
k
RI
RII
R
l
RWalker
TNovak
BG i es
EChristenbury
Q9/-/86 -
p9/g/86
09/ /86
,0 /
86
(
l
9/fj/G
o
's
,
. ..
_ _ _ _
-_
-
.
-
-